M1 (İzmir Metro)

{{Short description|İzmir Metro line}}

{{good article}}

{{Use dmy dates|date=April 2016}}

{{Infobox rail line

| name = M1
Narlıdere Kaymakamlık–Evka 3 Line

| color = 1E3B85

| logo = İzmir M1 Line Symbol.svg

| logo_width = 50px

| image = Izmir Metro at Bölge.jpg

| image_width = 250px

| caption = A westbound train after departing Bölge station.

| type = Light metro

| native_name = Narlıdere Kaymakamlık–Evka 3 Hattı

| native_name_lang = Turkish

| system = İzmir Metro

| locale = İzmir, Turkey

| start = Narlıdere Kaymakamlık, Narlıdere (West)

| end = Evka 3, Bornova (East)

| stations = 24

| stock = 182
{{Unbulleted list|45 ABB wagons (2-car 5-unit)|42 CSR wagons (2-car 5-unit)|95 CNR wagons|CRRC (5 articulated car unit)}}{{cite web |title=Yıllık Faaliyet Raporu |trans-title=Annual Activity Report |lang=tr |url=https://www.izmirmetro.com.tr/Sayfa/43/26/2015-faaliyet-raporu-ozet |publisher=İZMİR METRO A.Ş. |access-date=3 July 2021}}

| open = {{Start date|2000|05|22|df=y}}

| yearcommenced = {{Start date|1992|9|df=y}}

| yearcompleted = {{Start date|2000|4|df=y}}

| owner = İzmir Metropolitan Municipality

| operator = İzmir Metro A.Ş.

| depot = Halkapınar depot

| linelength_km = 27

| tracks = Double track, drives on the right (with the exception of Halkapınar station, which is triple track)

| gauge = {{Track gauge|sg|allk=on}}{{cite journal |last=Aykar |first=Emre |title=Izmir Metro: Story of a Successful Engineering Project |url=http://www.ejrcf.or.jp/jrtr/jrtr38/pdf/f26_ayk.pdf |access-date=5 July 2021 |journal=Japan Railway & Transport Review}}

| minradius = {{convert|125|m}}{{cite web |last1=Unlutepe |first1=Ahmet |last2=Tellioglu |first2=Volkan |last3=Arioglu |first3=Basar |title=Predicted and observed ground deformations due to TBM tunnel excavations of the Izmir Metro Project (Stage 1) |url=https://www.researchgate.net/publication/258132678 |access-date=5 July 2021 |quote="... In addition, this stretch of the alignment has the minimum curve radius (R=250m)."}}

| electrification = 750V DC third rail, bottom contact

| speed_km/h = 80

| ridership2 = 100 million (2019){{cite news |title=İzmir'de metro ve tramvay 2019'da 140 milyon yolcu taşıdı |trans-title=Metro and tram in İzmir carried 140 million passengers in 2019 |url=https://www.izmir.bel.tr/tr/Haberler/izmir-de-metro-ve-tramvay-2019-da-140-milyon-yolcu-tasidi/41207/156 |access-date=13 August 2021 |work=İzmir Büyükşehir Belediyesi |date=10 January 2020 |language=TR}}

| status = In operation

| map = {{M1 (İzmir Metro)|inline=1}}

| map_state = collapsed

}}

The M1, also known as the Narlıdere Kaymakamlık–Evka 3 Line ({{langx|tr|Narlıdere Kaymakamlık–Evka 3 Hattı}}), is the only active line of the İzmir Metro in İzmir, Turkey. The {{convert|27|km|mi}} line runs from Narlıdere Kaymakamlık station in the west to Evka 3 station in the east, consisting of 24 stations. Construction of the first stage of line began in 1992 and was completed in 2000, consisting of 10 initial stations.

Further extensions of the line since 2005 have been plagued by repeated construction delays and re-awarding of tenders. An eastern extension in 2012 and two western extensions in 2014 and 2024 added another two, five and seven stations to the line respectively. Plans exist for a further extension to Güzelbahçe in future.

All stations on the M1 are handicapped accessible. The line runs almost completely underground with the exception of six stations.

Construction

= Bornova to Üçyol section (1992–2000) =

The construction of the M1 started in September 1992 with its foundation being laid in December 1994.{{cite web | url = http://www.bupim.com/yayinlar/bupim-pdf/ECAS72.pdf | title = İzmir Metro Projesi Nenehatun Tünelindeki Geoteknik Çalışmalar ve Değerlendirilmesi |trans-title=Geotechnical Studies and Evaluation of Izmir Metro Project Nenehatun Tunnel |lang=tr | publisher = BUPİM | date = 14 October 2002 | access-date = 20 June 2018 | archive-url = https://web.archive.org/web/20180620063710/http://www.bupim.com/yayinlar/bupim-pdf/ECAS72.pdf | archive-date = 20 June 2018 | url-status =dead}} The {{Convert|1.7|km|abbr=on}} Nenehatun tunnels (named after Nene Hatun) between Üçyol and Konak stations were constructed via the New Austrian tunnelling method (NATM),{{cite news |url=http://www.milliyet.com.tr/1997/09/02/ekonomi/tunel.html |title=Yer altında büyük buluşma |trans-title=Underground meeting |lang=tr |work=Milliyet |date=2 September 1997 |access-date=20 June 2018 |archive-url=https://web.archive.org/web/20180620070833/http://www.milliyet.com.tr/1997/09/02/ekonomi/tunel.html |archive-date=20 June 2018 |url-status=live}} while the {{Convert|2.8|km|abbr=on}} Ümmühan Ana tunnels (named after the mother of Süleyman Demirel) between Konak and Basmane stations were constructed via the earth pressure balance tunnelling method.{{cite web|title=İZMİR METRO A.Ş. STRATEJİK PLANI 2015 – 2019 |trans-title=İZMİR METRO A.Ş. STRATEGIC PLAN 2015 – 2019 |lang=tr |url=https://www.izmirmetro.com.tr/UploadedFiles/Dosyalar/2015_2019_stratejik_plani.doc|access-date=30 April 2021}}{{cite web | url = http://www.ym.com.tr/Files/UserFiles/Arge/Tunel_Teknolojileri/13.%20İZMİR%20METRO%20PROJESİNDE%20YENİ%20AVUSTURYA%20TÜNEL%20AÇMA%20METODU,.pdf | title = İzmir Metro Projesinde Yeni Avusturya Tünel Açma Metodu, Zemin Basıncı Dengeleme Tünel Metodu ve Aç-Kapa Tünel Uygulamaları |trans-title=New Austrian Tunneling Method, Ground Pressure Balancing Tunnel Method and Cut-Cover Tunnel Applications in Izmir Metro Project |lang=tr | publisher = Yapı Merkezi | access-date = 20 June 2018 | archive-url = https://web.archive.org/web/20180620071507/http://www.ym.com.tr/Files/UserFiles/Arge/Tunel_Teknolojileri/13.%20%C4%B0ZM%C4%B0R%20METRO%20PROJES%C4%B0NDE%20YEN%C4%B0%20AVUSTURYA%20T%C3%9CNEL%20A%C3%87MA%20METODU,.pdf | archive-date = 20 June 2018 | url-status =dead}} The rolling stock was delivered in August 1996. The first {{Convert|12|km|abbr=on}} section from Bornova to Üçyol stations was completed in April 2000. Consisting of 10 stations, it began service on 22 May 2000.{{cite web |url=http://www.izmirmetro.com.tr/files/metro_brosur_tur.pdf |title=İzmir Metro A.Ş. Tanıtım Kitabı |trans-title=Izmir Metro A.S. Introduction Book |lang=tr |publisher=İzmir Metro A.Ş. |access-date=26 July 2014 |archive-url=https://web.archive.org/web/20100705035754/http://www.izmirmetro.com.tr/files/metro_brosur_tur.pdf |archive-date=5 July 2010 |url-status=live}}

= Üçyol to Fahrettin Altay section (2005–2014) =

In March 2005, a tender was awarded for the ÜçyolFahrettin Altay section, a {{Convert|5.2|km|abbr=on}} extension to the west consisting of six new stations. The foundation of the extension was laid three months later and tunneling works commenced on 5 July 2005, with the extension slated to be completed in two years. However, when the contractor failed to fulfill their obligations, the İzmir Metropolitan Municipality sent a cease and desist letter to the company on 14 February 2006, subsequently cancelling the tender in November 2006.{{cite news |title=İzmirlinin bitmeyen metro çilesi |url=https://www.evrensel.net/haber/194108/izmirlinin-bitmeyen-metro-cilesi |access-date=30 April 2021 |publisher=Evrensel}} A new tender was announced on 23 January 2007 with an aim complete the extension by 31 October 2008.{{cite web|title=Ekim'de Metro Atağı|url=https://www.izmirmetro.com.tr/Haberler/260|access-date=30 April 2021|website=www.izmirmetro.com.tr|publisher=İzmir Metro A.Ş.}} The tender was cancelled on 13 August 2009 after the contractor requested a 15-month extension.{{cite web |title=Üçyol-Üçkuyular hattı bitmiyor |trans-title=Üçyol-Üçkuyular line does not end |lang=tr |url=http://mimdap.org/2009/05/ucyol-uckuyular-hatty-bitmiyor/ |website=mimdap.org |access-date=30 April 2021}}

The İzmir Metropolitan Municipality issued a third tender in October 2009,{{cite news |title=Metro 17 ayda bitecek |trans-title=Metro will be finished in 17 months |lang=tr |url=https://www.milliyet.com.tr/ege/metro-17-ayda-bitecek-1161964 |access-date=30 April 2021 |publisher=Milliyet}} but it was again cancelled by the Public Procurement Authority for unspecified reasons. The cancellation had occurred after a company's objection to the tender even though it had not been invited to the tender.{{cite web |title=BAŞKAN KOCAOĞLU: "KİK KARARINI YARGIYA GÖTÜRÜYORUZ" |trans-title=PRESIDENT KOCAOĞLU: “WE TAKE JUDGMENT DECISION |lang=tr |url=https://www.izmirmetro.com.tr/Haberler/269 |website=www.izmirmetro.com.tr |publisher=İZMİR METRO A.Ş. |access-date=3 May 2021}} Consequently, İzmir Metropolitan decided to complete the remaining construction using their own resources due to the possibility of a tunnel collapse if it were not concreted.{{cite web|title=METRO "7X24" MESAİ|trans-title=METRO "7X24" OFFICE |lang=tr|url=https://www.izmirmetro.com.tr/Haberler/274|access-date=30 April 2021|website=www.izmirmetro.com.tr|publisher=İzmir Metro A.Ş.}} The contractor then resumed work in February 2010{{cite web |title="ULAŞTIRMA BAKANLIĞI'NA DEVİR YOK; METROYA BAŞLADIK, BİTİRİYORUZ" |trans-title=NO TRANSFER TO THE MINISTRY OF TRANSPORTATION; WE STARTED THE METRO, WE ARE FINISHING |lang=tr |url=https://www.izmirmetro.com.tr/Haberler/328 |website=www.izmirmetro.com.tr |publisher=İZMİR METRO A.Ş. |access-date=30 April 2021}} after the cancellation was turned down by the administrative court.{{cite web |title=HAKLILIĞIMIZ TESCİL EDİLDİ, MUTLUYUZ |trans-title=OUR RIGHTS HAVE BEEN REGISTERED, WE ARE HAPPY |lang=tr |url=https://www.izmirmetro.com.tr/Haberler/284 |website=www.izmirmetro.com.tr |publisher=İZMİR METRO A.Ş. |access-date=3 May 2021}}

On 18 June 2012, test runs began between İzmirspor and Hatay stations, opening to passengers service on 29 December 2012.{{cite news |last1=Utku |first1=Bolulu |title=İzmir Metrosu İzmirspor ve Hatay istasyonu açıldı |trans-title=İzmir Metro İzmirspor and Hatay stations opened |lang=tr |url=https://www.hurriyet.com.tr/ege/izmir-metrosu-izmirspor-ve-hatay-istasyonu-acildi-22257786 |access-date=30 April 2021 |work=www.hurriyet.com.tr |agency=DHA |publisher=Hürriyet |date=30 December 2012 }} Göztepe station entered service on 25 March 2014,{{cite web | url = http://www.izmir.bel.tr/HaberDetay/10205/tr | title = İzmir metrosu Göztepe'ye uzadı |trans-title=Izmir metro extended to Göztepe |lang=tr | publisher = İzmir Büyükşehir Belediyesi | date = 25 March 2014 | access-date = 26 July 2014 | archive-url = https://web.archive.org/web/20160314011148/http://www.izmir.bel.tr/HaberDetay/10205/tr | archive-date = 14 March 2016 | url-status =live}} with the last two stations on the extension, Poligon and Fahrettin Altay stations, opening their doors on 27 July 2014.{{cite news |url=http://www.dha.com.tr/en-son-haber-kocaoglundan-bayram-surprizi-izmir-metrosunun-son-etabi-aciliyor-son-dakika-haberleri_725309.html |title=Kocaoğlu'ndan Bayram Sürprizi: İzmir Metrosunun Son Etabı Açılıyor |trans-title=Bayram Surprise from Kocaoğlu: The Last Stage of Izmir Metro Opens |lang=tr |agency=DHA |date=26 July 2014 |access-date=26 July 2014 |archive-url=https://web.archive.org/web/20140727203212/http://www.dha.com.tr/en-son-haber-kocaoglundan-bayram-surprizi-izmir-metrosunun-son-etabi-aciliyor-son-dakika-haberleri_725309.html |archive-date=27 July 2014 |url-status=dead}} The planned Güzelyalı station between these two stations was dropped from the project due to an underground stream.{{cite news |url=http://www.milliyet.com.tr/Yazar.aspx?aType=YazarDetay&ArticleID=1149945&AuthorID=206 |title=Güzelyalı İstasyonu iptal!.. |trans-title=Guzelyali Station is cancelled! |lang=tr |work=Milliyet |date=13 October 2009 |access-date=26 July 2014 |archive-url=https://web.archive.org/web/20140726104909/http://www.milliyet.com.tr/Yazar.aspx?aType=YazarDetay&ArticleID=1149945&AuthorID=206 |archive-date=26 July 2014 |url-status=live}}

= Bornova to Bornova Merkez section (2007–present) =

Work on the Bornova–Bornova Merkez extension on the M1's eastern axis started in 2007. However, the section between Evka 3 and Bornova Merkez stations was delayed after the contractor company refused to do construction drawings. Constructing the section would have risked building damage as it was discovered during excavations that the soil contained clay and sand. The construction was fully stopped in 2008 after the contractor could not finish the extension and requested an additional year, which was rejected.{{cite news |url=http://www.hurriyet.com.tr/buyuksehir-tunel-icin-dugmeye-basti-27347619 |title=Büyükşehir tünel için düğmeye bastı |trans-title=Metropolitan pressed the button for the tunnel |lang=tr |work=Hürriyet |date=8 October 2014 |access-date=3 January 2016 |archive-url=https://web.archive.org/web/20160314014915/http://www.hurriyet.com.tr/buyuksehir-tunel-icin-dugmeye-basti-27347619 |archive-date=14 March 2016 |url-status=live}} A new tender was issued in October 2009 to finish the remaining work. However, that tender was cancelled by the Public Procurement Authority.{{cite news |title=Metro ihalesi tamam |trans-title=Metro tender complete |lang=tr |url=https://www.yeniasir.com.tr/izmir/2010/04/23/metro_ihalesi_tamam |access-date=4 July 2021 |publisher=Yeni Asır |date=23 April 2010}}

A third tender was made in April 2010, but it was cancelled by the municipality after the court reverted the cancellation of the second tender. The municipality signed an agreement with the winner of the second tender but the agreement was reverted after the high court reversed the decision of lower court about the second tender. A fourth tender was issued in August 2010 and construction started in September.{{cite web |title=BORNOVA METROSU'NDA MUTLU SON |trans-title=HAPPY END IN BORNOVA METRO |lang=tr |url=https://www.izmirmetro.com.tr/Haberler/332 |website=www.izmirmetro.com.tr |publisher=İZMİR METRO A.Ş. |access-date=4 May 2021}} Test drives started on 20 March 2012 for the {{Convert|2.6|km|abbr=on|adj=on}} section to Evka 3. Evka 3 and Ege University stations began service on 30 March 2012.{{cite web |url=https://www.izmirmetro.com.tr/UploadedFiles/Dosyalar/2020-2024%20STRATEJİK%20PLANI.pdf |title=İzmir Metro A.Ş. Stratejik Planı 2020–2024 |trans-title=Izmir Metro A.S. Strategic Plan 2020–2024 |lang=tr |publisher=İzmir Metro A.Ş. |year=2019 |access-date=10 November 2019 |archive-url=https://archive.today/20191110091154/https://www.izmirmetro.com.tr/UploadedFiles/Dosyalar/2020-2024%20STRATEJ%C4%B0K%20PLANI.pdf |archive-date=10 November 2019 |url-status=live}}

= Fahrettin Altay to Narlıdere Kaymakamlık section (2018–2024) =

Works on the {{Convert|7.2|km|abbr=on|adj=on}} Fahrettin Altay–Narlıdere Kaymakamlık extension to the west began on 9 June 2018 at a cost of 287 million.{{cite web|date=10 June 2018|title=Büyükşehir'den 'milyarlık' yatırım|trans-title='Billion' investment from the Metropolitan |lang=tr |url=http://www.izmir.bel.tr/tr/Haberler/buyuksehir-den-milyarlik-yatirim/37724/156|url-status=live|archive-url=https://web.archive.org/web/20180614172900/http://www.izmir.bel.tr/tr/Haberler/buyuksehir-den-milyarlik-yatirim/37724/156|archive-date=14 June 2018|access-date=10 June 2018|publisher=İzmir Büyükşehir Belediyesi}}{{Cite news|date=25 January 2021|title=GÜNDEME BAKIŞ Narlıdere metrosuna girdi... 2022'nin Kasım'ında yola çıkıyor|trans-title=OVERVIEW He entered the Narlıdere metro... He is leaving in November 2022 |lang=tr|url=https://www.gundemebakis.com/guncel/gundeme-bakis-narlidere-metrosuna-girdi-2022nin-kasiminda-h77210.html|access-date=2021-01-31}} There are seven stations built for the extension: Balçova, Çağdaş, Dokuz Eylül Üniversitesi Hastanesi, Güzel Sanatlar, Narlıdere İtfaiye, 100. Yıl Cumhuriyet Şehitlik, and Narlıdere Kaymakamlık.{{cite web |title=Narlıdere Metrosu'nu "Yeraltı Canavarı" Kazacak|trans-title="Underground Monster" Will Dig Narlıdere Metro |lang=tr |url=https://www.izmirmetro.com.tr/Haberler/4735 |publisher=İZMİR METRO A.Ş. |access-date=3 July 2021|quote=42 ay olarak planlanan yapım sürecinin sonunda Narlıdere metro hattı, Balçova, Çağdaş, Dokuz Eylül Üniversitesi Hastane, Güzel Sanatlar Fakültesi (GSF), Narlıdere, Siteler ve Kaymakamlık olmak üzere 7 istasyondan oluşacak.}} Two other stations that were originally planned to be built in the west direction, were removed from the project, as it was predicted that the number of passengers would be insufficient.{{cite news |url= http://www.izgazete.net/haber/6676/son-durak-narlidere-kaymakamlik |title= Son durak Narlıdere Kaymakamlık |work= İzGazete |date= 21 June 2016 |accessdate= 30 July 2016 |archive-url= https://web.archive.org/web/20160727191532/http://www.izgazete.net/haber/6676/son-durak-narlidere-kaymakamlik |archive-date= 27 July 2016}} The first six stations on the extension were completed on 24 February 2024, with the last station, Kaymakamlık, opening its doors on 4 March 2024.{{cite web |url=https://www.izmir.bel.tr/tr/Haberler/soyer-bundan-sonra-sathimiz-tum-vatandir/49932/156 |title=Soyer: 'Bundan sonra sathımız, tüm vatandır' |publisher=İzmir Metropolitan Municipality |date=24 February 2024 |accessdate=24 February 2024 |archive-date=24 February 2024 |archive-url=https://web.archive.org/web/20240224165201/https://www.izmir.bel.tr/tr/Haberler/soyer-bundan-sonra-sathimiz-tum-vatandir/49932/156 |url-status=dead }}{{Cite news |url=https://www.izgazete.net/narlidere-metrosunda-beklenen-istasyon-hizmete-girdi |title=Narlıdere Metrosu'nda beklenen istasyon hizmete girdi |publisher=İz Gazete |date=4 March 2024 |access-date=4 March 2024}}

= Further extensions and plans =

The line is planned to be extended to Bornova district in the east and Güzelbahçe in the west, with further extensions still under planning.{{cite news|last=Bolulu|first=Utku|date=8 March 2014|title=Kocaoğlu İzmirlinin İzmir'ini anlattı|trans-title=Kocaoğlu strategy of 'Izmir of the people of Izmir'|lang=tr |work=Hürriyet|location=İzmir|url=http://www.hurriyet.com.tr/ege/25967616.asp|url-status=live|access-date=16 October 2015|archive-url=https://web.archive.org/web/20150522160054/http://www.hurriyet.com.tr/ege/25967616.asp|archive-date=22 May 2015}}{{cite web|date=9 January 2018|title=İşte İzmir'in yol haritası|url=http://www.izmir.bel.tr/HaberDetay/33269/tr|trans-title=Here is the road map of Izmir |lang=tr|url-status=live|archive-url=https://web.archive.org/web/20180121145236/http://www.izmir.bel.tr/HaberDetay/33269/tr|archive-date=21 January 2018|access-date=19 January 2018|publisher=İzmir Büyükşehir Belediyesi}}

The M1 line will be further extended from Kaymakamlık to Güzelbahçe. This {{Convert|13.6|km|abbr=on|adj=on}} extension is planned to have another 11 stations.{{cite web|date=28 December 2017|title=İzmir Ulaşım Ana Planı: Sonuçlar|trans-title=Izmir Transportation Master Plan: Results |lang=tr |url=https://www.izmir.bel.tr/YuklenenDosyalar/file/Upi_paydas_final_sunum_R26.pdf|url-status=live|archive-url=https://web.archive.org/web/20180126122228/https://www.izmir.bel.tr/YuklenenDosyalar/file/Upi_paydas_final_sunum_R26.pdf|archive-date=26 January 2018|access-date=26 January 2018|publisher=İzmir Büyükşehir Belediyesi}}

Stations

File:Izmir_Metro_Rapid_Transit_Stadyum_Station.jpg

File:Çankaya metro station 01.jpg

There are 24 stations on the M1 line, all with handicapped access.{{cite web | url = http://www.izmir.bel.tr/HaberDetay/9928/tr | title = Londra, Hong Kong, Paris, Sydney.. Ve İzmir |trans-title=London, Hong Kong, Paris, Sydney.. And Izmir |lang=tr | publisher = İzmir Büyükşehir Belediyesi | date = 29 November 2013 | access-date = 30 July 2016 | archive-url = https://web.archive.org/web/20160806174954/http://www.izmir.bel.tr/HaberDetay/9928/tr | archive-date = 6 August 2016 | url-status =live}} Most of the stations are underground with the following exceptions: Bölge, Halkapınar and Sanayi stations are at-grade; Hilal and Stadyum stations are on viaducts; and Bornova station is in a splitting tunnel. Each station has a platform length of {{Convert|125|m|abbr=on}}.{{cite web | url = http://eski.izmir.bel.tr/YuklenenDosyalar/Dokumanlar/25.12.2013%2011_30_26_raylisistemudurlugu.pdf | title = 2003 Yılı Faaliyet Raporu |trans-title=2003 Annual Report |lang=tr | publisher = İzmir Büyükşehir Belediyesi | year = 2003 | access-date = 20 June 2018 | archive-url = https://web.archive.org/web/20180620063856/http://eski.izmir.bel.tr/YuklenenDosyalar/Dokumanlar/25.12.2013%2011_30_26_raylisistemudurlugu.pdf | archive-date = 20 June 2018 | url-status = live}}

As of September 2020, all stations charge a standard fare (₺13) from standard İzmirim Kart owners for the first ride.{{cite web |title=Ücret Tarifesi |trans-title=Fee Schedule |lang=tr |url=https://www.eshot.gov.tr/tr/UcretTarifesi/114/77 |publisher=ESHOT |access-date=10 July 2021}}

Links to the transportation network include: transfer to İZBAN at both Halkapınar and Hilal stations; to ESHOT and {{ill|İZULAŞ|tr}} buses via Bornova, Evka 3, Fahrettin Altay, Halkapınar, Konak and Üçyol stations; to İZDENİZ ships via Konak station; TCDD Taşımacılık trains via Basmane station; and to Konak Tram via Fahrettin Altay, Halkapınar and Konak.{{cite web | url = http://www.izmirmetro.com.tr/Sayfa/39/18/rayli-sistem-haritasi | title = İstasyonlar ve Aktarma Merkezleri |trans-title=Stations and Transfer Centers |lang=tr | publisher = İzmir Metro A.Ş. | access-date = 30 July 2016 | archive-url = https://web.archive.org/web/20160328132015/http://www.izmirmetro.com.tr/Sayfa/39/18/rayli-sistem-haritasi | archive-date = 28 March 2016 | url-status =live}}

;

class="wikitable"

!No

!Station

!District

!Transfer

!Type

!Notes

1

|Zeytinalanı

| rowspan="2" |Urla

|25x25px

| rowspan="11" |Underground

|

2

|Çamlıçay

|25x25px

|

3

|Siteler

| rowspan="6" |Güzelbahçe

|25x25px

|

4

|Seferihisar Kavşağı

|25x25px

|

5

|Yalı

|25x25px

|

6

|Güzelbahçe İskele

|25x25px39x39px (Güzelbahçe Pier)

|

7

|Anıt

|25x25px

|

8

|Maltepe

|25x25px

|

9

|Limanreis

| rowspan="3" |Narlıdere

|25x25px

|

10

|Lojmanlar

|25x25px

|

11

|Pertev Bey

|25x25px

|

colspan="6" style="background: #ececec; color: grey; vertical-align: middle; text-align:center " |↑↑ Project ↑↑
12

|Narlıdere Kaymakamlık

| rowspan="4" |Narlıdere

|25x25px

| rowspan="16" |Underground

|Narlıdere District Governor's Office, Narlıdere Nursing Home

13

|100. Yıl Cumhuriyet Şehitlik

|25x25px

|Narlıdere Martyrdom, Martyrdom Mosque, Narlıdere AKM, Narlıdere Municipality, Narlıdere Bus Interchange (Planned)

14

|Narlıdere İtfaiye

|25x25px

|Narlıdere Fire Station

15

|Güzel Sanatlar

|25x25px

|Dokuz Eylul University R&D Zone

16

|Dokuz Eylül Üniversitesi Hastanesi

| rowspan="3" |Balçova

|25x25px

|Dokuz Eylul University Faculty of Medicine

17

|Çağdaş

|25x25px

|Balçova Kipa AVM, Ege Park AVM, Ramada Encore İzmir, Asmaçatı AVM

It is about 800 meters walking distance to Balçova Cable Car and 500 meters to İzmir University of Economics.

18

|Balçova

|25x25px

|Agora AVM, Ata Street, Media Markt, Flo and Ekol Medical Center are within walking distance.

19

|Fahrettin Altay

|Konak, Karabağlar & Balçova

|{{Bahnlinie|RB

T2white|green|T2 (Fahrettin Altay - Halkapınar) Tramvay Hattı}} (Fahrettin Altay)25x25px

|İstinyePark İzmir・Ahmed Adnan Saygun Art CenterGürsel Aksel Stadiumİzmir Democracy University

20

|Poligon

| rowspan="5" |Konak & Karabağlar

|25x25px37x37px

|Güzelyalı

21

|Göztepe

|25x25px37x37px

|Dokuz Eylul University Faculty of Theology

22

|Hatay

|25x25px37x37px

|

23

|İzmirspor

|25x25px37x37px

|İzmir Katip Celebi University Atatürk Training and Research Hospital Hatay Additional Service Building

24

|Üçyol

| {{Bahnlinie|RB

M2white|blue|M2 (Üçyol - Çamlıkule) Metro Hattı}} (Üçyol)25x25px37x37px

|İzmirspor Facilities

25

|Konak

| rowspan="5" |Konak

|{{Bahnlinie|RB

T2white|green|T2 (Fahrettin Altay - Halkapınar) Tramvay Hattı}} (Konak İskele)25x25px37x37px39x39px (Konak)

|Konak Square, İzmir Clock Tower, Konak Mosque, Izmir Government Mansion (Izmir Governor's Office), Kemeraltı

26

|Çankaya

|{{Bahnlinie|RB

T2white|green|T2 (Fahrettin Altay - Halkapınar) Tramvay Hattı}} (Gazi Bulvarı)25x25px37x37px

|Kemeraltı, Hisar Mosque, Kizlaragasi Inn, Yeni Kavaflar Bazaar, Izmir Agora

27

|Basmane

|50x50px (Basmane Gar, planned)25x25px (Basmane Railway Station){{Bahnlinie|RB

M3white|blue|M3 (Halkapınar - Menderes) Metro Hattı}} (Basmane)25x25px37x37px

|Basmane Train Station, Kültürpark

28

|Hilal

|25x25px (Hilal)

|Viaduct

|

29

|Halkapınar

|25x25px37x37px

50x50px (planned) {{Bahnlinie|RB

T2white|green|T2 (Fahrettin Altay - Halkapınar) Tramvay Hattı}}・25x25px (Halkapınar){{Bahnlinie|RBM3white|blue|M3 (Halkapınar - Menderes) Metro Hattı}} {{Bahnlinie|RBM5white|blue|M5 (Halkapınar - Otogar) Metro Hattı}} (Halkapınar)

|Level

|Halkapınar Maintenance Facility

---

İzmir Atatürk Stadium, 1st Industrial Zone, Site of Food Merchants, İzmir Halkapınar Sports Hall

30

|Stadyum

| rowspan="6" |Bornova

|25x25px37x37px

|Viaduct

|3rd Industrial Zone, Regional Courts of Appeals

31

|Sanayi

|25x25px37x37px

| rowspan="2" |Level

|2nd Industrial Zone

32

|Bölge

|25x25px37x37px

|Yaşar University

33

|Bornova

|25x25px37x37px

|Below-grade

|Ege University, Ege University Medical Faculty Hospital, Küçükpark

34

|Ege Üniversitesi

|

| rowspan="2" |Underground

|Ege University, Bilal Saygılı Mosque

35

|Evka 3

|25x25px37x37px

|Ali Rıza Güven Mosque

colspan="6" style="background: #ececec; color: grey; vertical-align: middle; text-align:center " |↓↓ Construction suspended ↓↓
36

|Bornova Merkez

|Bornova

|{{Bahnlinie|RB

M4white|blue|M4 (Bornova Merkez - Menemen Plastik OSB 1) Metro Hattı}} (Bornova Merkez)25x25px37x37px

|Underground

|Bornova Republic Square, Bornova Government House

;

{{notelist}}

Trains

The M1 opened in 2000 with 45 wagons.{{cite news |url=http://www.hurriyet.com.tr/izmir-rayinda-40061454 |title=İzmir rayında |trans-title=On the rail of Izmir |lang=tr |work=Hürriyet |date=28 February 2016 |access-date=30 July 2016 |archive-url=https://web.archive.org/web/20160807010808/http://www.hurriyet.com.tr/izmir-rayinda-40061454 |archive-date=7 August 2016 |url-status=live}}{{cite web | url = http://www.izmir.bel.tr/HaberDetay/19473/tr | title = 16 yılda kat kat büyüdü |trans-title=It has grown exponentially in 16 years. |lang=tr | publisher = İzmir Büyükşehir Belediyesi | date = 21 May 2016 | access-date = 17 September 2016 | archive-url = https://web.archive.org/web/20160918010838/http://www.izmir.bel.tr/HaberDetay/19473/tr | archive-date = 18 September 2016 | url-status =live}} In 2011, the wagon number was increased to 77 with 8 train sets from China consisting of 32 wagons.{{cite web | url = http://www.izmirmetro.com.tr/Haberler/522 | title = Yeni trenler İzmir'de | publisher = İzmir Metro A.Ş. |trans-title=Annual Activity Report |lang=tr | date = 16 November 2011 | access-date = 30 July 2016 | archive-url = https://web.archive.org/web/20160805140614/http://www.izmirmetro.com.tr/Haberler/522 | archive-date = 5 August 2016 | url-status =live}} 10 more wagons were added in 2015, increasing the number to 87.{{cite news |url=http://www.hurriyet.com.tr/izmir-metrosu-na-yeni-vagonlar-geliyor-27965413 |title=İzmir metrosuna yeni vagonlar geliyor |trans-title=New train cars are coming to Izmir metro |lang=tr |work=Hürriyet |date=15 January 2015 |access-date=30 July 2016 |archive-url=https://web.archive.org/web/20160807010328/http://www.hurriyet.com.tr/izmir-metrosu-na-yeni-vagonlar-geliyor-27965413 |archive-date=7 August 2016 |url-status=live}} 19 train sets consisting of 95 wagons were delivered in 2017, increasing the total to 182.{{cite web | url = http://www.izmir.bel.tr/HaberDetay/22253/tr | title = İzmir'de işler 'rayında' |trans-title=Things are 'on track' in İzmir |lang=tr | publisher = İzmir Büyükşehir Belediyesi | date = 11 February 2017 | access-date = 19 January 2018 | archive-url = https://web.archive.org/web/20180120001016/http://www.izmir.bel.tr/HaberDetay/22253/tr | archive-date = 20 January 2018 | url-status =live}}{{cite web | url = http://www.izmir.bel.tr/HaberDetay/19402/tr | title = 37 milyar dolarlık Çin devi, İzmir için üretiyor |trans-title=The $37 billion Chinese giant produces for Izmir |lang=tr | publisher = İzmir Büyükşehir Belediyesi | date = 2 May 2016 | access-date = 30 July 2016 | archive-url = https://web.archive.org/web/20160806164549/http://www.izmir.bel.tr/HaberDetay/19402/tr | archive-date = 6 August 2016 | url-status =live}}{{cite news | url = http://www.hurriyet.com.tr/metroya-10-yeni-arac-geldi-40221337 | title = Metroya 10 yeni araç geldi |trans-title=10 new vehicles arrived in the metro |lang=tr | work = Hürriyet | date = 10 September 2016 | access-date = 17 September 2016 | archive-url = https://web.archive.org/web/20160917152219/http://www.hurriyet.com.tr/metroya-10-yeni-arac-geldi-40221337 | archive-date = 17 September 2016 | url-status =live}} Each train set consisted of three wagons at first; however, this number increased to four, then five.{{cite news |url=http://www.egedesonsoz.com/haber/Fahrettin-Altay-acildi-Metro-costu/877649 |title=Fahrettin Altay açıldı Metro coştu! |trans-title=Fahrettin Altay opened: The metro was excited! |lang=tr |work=Ege'de Son Söz |date=7 September 2014 |access-date=17 September 2016 |archive-url=https://web.archive.org/web/20160918033811/http://www.egedesonsoz.com/haber/Fahrettin-Altay-acildi-Metro-costu/877649 |archive-date=18 September 2016 |url-status=dead}} The trains work at an average of {{Convert|40|km/h|abbr=on}} and are stored in Halkapınar Maintenance Facility.

Accidents

In 2015, the escalators at Üçyol station broke down, resulting with 14 injuries.{{cite news |title=İzmir Metro'da yürüyen merdiven kazası |trans-title=Escalator accident in Izmir Metro |lang=tr |url=https://www.hurriyet.com.tr/ege/izmir-metroda-yuruyen-merdiven-kazasi-28308985 |date=27 February 2015 |access-date=11 July 2021 |work=Hürriyet}}

In 2016, a train collided with a container that fell onto the rails near Bölge station, injuring 10 people. The train tilted over as a result of the collision.{{cite news |title=İzmir'de metro kazası: 10 yaralı |trans-title=Metro accident in Izmir: 10 injured |lang=tr |url=https://www.hurriyet.com.tr/gundem/izmirde-metro-kazasi-10-yarali-40037518 |date=8 January 2016 |access-date=11 July 2021 |work=Hürriyet }}

In 2019, a construction worker died after his arm was crushed during the construction in Narlıdere.{{cite news |title=Kaldırıldığı hastanede yapılan tüm müdahalelere rağmen kurtarılamadı |trans-title=Despite all the interventions in the hospital where he was taken, he could not be saved. |lang=tr |url=https://www.haberturk.com/izmir-de-metro-insaatinda-kaza-1-isci-oldu-2517616 |date=30 August 2019 |access-date=11 July 2021 |work=Habertürk }}

In 2023, a train parted and a few cars of it derailed as a result of a switch throwing while the vehicle was passing over it. {{Cite web |title=İzmir'de metro raydan çıkıp duvara çarptı |url=https://www.ntv.com.tr/video/turkiye/izmirde-metro-raydan-cikip-duvara-carpti,y8KGRfd1D06tjpmmkgmWQQ |access-date=2024-02-22 |website=www.ntv.com.tr |language=tr}}