M35 motorway (Hungary)

{{Short description|Road in Hungary}}

{{Expand Hungarian|topic=transp|date=January 2025}}

{{More references|date=December 2009}}

{{Infobox road

| country = HUN

| type = M

| route = 35

|alternate_name = Part of Via Carpathia

| map = M35 Autópálya Hungary.png

| map_notes = File:000080 Navy Blue Square.svg in use File:Grey.PNG other highways

| e-road = {{jct|country=HUN|E|79|E|573}}

|image =M35 motorway, Debrecen Western Bypass.jpg

|image_notes=M35 west of Debrecen, April 2024

|length_km = 68.8

|maint =

|established = 2003

|history = Completed: 2018

| terminus_a = {{jct|country=HUN|M|3}} near Görbeháza

| junction = {{plainlist|1=

  • {{jct|country=HUN|MR|354}}, {{jct|country=HUN|MR|33}}, {{jct|country=HUN|MR|4}}, {{jct|country=HUN|MR|481}} near Debrecen

}}

| terminus_b = {{jct|country=HUN|M|4}} near Berettyóújfalu

| counties = Hajdú-Bihar

| cities = Hajdúböszörmény, Debrecen, Berettyóújfalu

}}

File:M35 Pród.jpg

The M35 motorway ({{langx|hu|M35-ös autópálya}}) is a {{convert|68.8|km|abbr=on}} motorway in eastern Hungary which connects the M3 motorway with the city of Debrecen, providing it with a direct motorway link to the capital, Budapest.

The section bypassing Debrecen was completed in April 2006, and the whole stretch of road was opened to the public on 15 December 2006. The new road reduced driving time between Debrecen and the capital to under 2 hours. The further stretch from Debrecen to M4 motorway was inaugurated on December 20, 2018.{{Cite web|url=https://civishir.hu/helyben-jaro/2018/12/kesz-az-m35-os-vege-es-az-m4-es-eleje|title=Kész az M35-ös vége és az M4-es "eleje"}}

Timeline

class="wikitable"

!Section

!Length

!Opened

!Notes

Görbeháza (M3) – Debrecen dél

|{{Convert|44.0|km|mi|2|abbr = on}}

|bgcolor="#B9FFC5"| 15 December 2006

| Built between 2003 – 2006, with Debrecen western bypass.

Debrecen dél – Mikepércs

|{{Convert|5.43|km|mi|2|abbr = on}}

|bgcolor="#B9FFC5"| 13 December 2017

| Built between 2015 – 2017.

Mikepércs – Berettyóújfalu (M4)

|{{Convert|18.7|km|mi|2|abbr = on}}

|bgcolor="#B9FFC5"| 20 December 2018

| Built between 2015 – 2018.

Route description

  • The route is full length motorway. The maximum speed limit is 130km/h, with 80px (2x2 lane road with stop lane).

{{RJL|date=November 2021}}

{{Sticky header}}

{| class="wikitable sortable sticky-header"

|-

!scope="col"|County

!scope="col"|km

!scope="col"|Type

!scope="col"|Destination

!scope="col"|Notes

|-

|rowspan=17; align=center|35px
Hajdú-Bihar

| style="background:#dfd;" align=center | 0

| style="background:#dfd;" align=center |File:AB-Kreuz-blau.svg

| style="background:#dfd;"|{{Jct|country=HUN|M|3|E|79}} – Budapest, Miskolc (M30)

----

{{Jct|country=HUN|M|3|E|579}} – Nyíregyháza

| style="background:#dfd;"|The northern terminus of the File:Hungary road sign E-016.svg motorway, E79 route, and Via Carpathia.

----

Kilometrage starting point

----

trumpet interchange

|-

| align=center | 7

| align=center |File:Hungary road sign E-046.svg

| Pródi pihenőhely

| parking, and WC

----

pihenőhely means Rest area

|-

| align=center | 12

| align=center |File:AB-Fluss.svg

| Eastern Main Channel híd

| híd means Bridge

|-

| align=center | 14

| align=center |File:AB-AS-blau.svg

| Hajdúnánás / Balmazújváros

|

|-

| align=center | 19

| align=center |File:Hungary road sign E-046.svg

| Böszörményi pihenőhely

| parking, and WC

|-

| align=center | 24

| align=center |File:AB-AS-blau.svg

| Hajdúböszörmény / Balmazújváros

| Connection to the highway engineers

|-

| align=center | 31

| align=center |File:Hungary road sign E-046.svg

| Józsai pihenőhely

| parking, petrol station (Mobil Petrol), café and restaurant

|-

| align=center | 33

| align=center | File:AB-AS-blau.svg

| BMW factory, Gate 1. and 6. / Debrecen-Józsa

| exit under construction

|-

| rowspan=2; align=center | 38

| align=center |File:AB-AS-blau.svg

| BMW factory, Gate 2. /
{{Jct|country=HUN|MR|354|E|573}} – Debrecen észak, towards to 30px Main road 4Nyíregyháza

| Northern end of concurrency with european route E573, and Debrecen bypass.

----

cloverleaf interchange (formerly trumpet interchange when opened)

----

észak means North

|-

| align=center |File:AB-AS-blau.svg

| 30px Main road 33 – Debrecen Centrum / Hortobágy

| Centrum means center

|-

| align=center | 40

| align=center |File:AB-AS-blau.svg

| Debrecen nyugat, Debrecen-Ondód, Ipari park

| nyugat means West

----

Ipari park means Industrial area

|-

| align=center | 44

| align=center |File:AB-AS-blau.svg

| 30px Main road 4 – Debrecen dél
{{Jct|country=HUN|MR|4|E|573}} – Hajdúszoboszló, Szolnok

| Southern end of concurrency with european route E573.

----

dél means South

|-

| align=center | 49

| align=center |File:AB-AS-blau.svg

| 30px Main road 481Mikepércs, Industrial area

| Southern end of Debrecen bypass.

----

Connection to Debrecen International Airport

|-

| align=center | 53

| align=center |File:Hungary road sign E-046.svg

| Mikepércsi pihenőhely

| parking, and WC

|-

| align=center | 60

| align=center |File:AB-AS-blau.svg

| Derecske / Hajdúszovát

|

|-

| style="background:#fdd;" align=center | 63

| style="background:#fdd;" align=center |File:Hungary road sign E-046.svg

| style="background:#fdd;"|Derecskei pihenőhely

| style="background:#fdd;"| parking, and WC (petrol station in the future)

|-

| style="background:#fdd;" align=center | 68

| style="background:#fdd;" align=center |File:AB-Kreuz-blau.svg

| style="background:#fdd;"|{{Jct|country=HUN|Mb|4|E|60}} – Budapest, Szolnok

----

{{Jct|country=HUN|M|4|E|60|E|79}} – NagykerekiOradea (RO)

| style="background:#fdd;"|The southern terminus of the motorway, E79 route, and Via Carpathia.

----

Incomplete junction: junction only from/to → Nagykereki (Romanian border)

{{Jctbtm|col=6|keys=concur,incomplete,unbuilt}}

Maintenance

The operation and maintenance of the road by [https://mkif.hu/en/ Hungarian Concession Infrastructure Development Plc.] This activity is provided by this highway engineer.

Payment

Hungarian system has 2 main type in terms of salary:

1, time-based fee vignettes (E-matrica);

  • Cars, vans and motorbikes up to 3.5 tonnes only need to buy a single vignette which costs 6,400 Hungarian forint (Ft) for 10 days, 10,360 Ft for 1 month and 57,260 Ft for a year, from 1 January 2024.{{cite web|url=http://toll-charge.hu/articles/article/toll-free-sections|title=National Toll Payment Services PLC - E-vignette rates from 1 January 2024|website=toll-charge.hu}}

2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:

:

class="wikitable"
Type of county vignetteAvailable section
Hajdú-Bihar

| full length (0 km – 68 km)

European Route(s)

border=1 cellpadding=2 style="margin-left:1em; margin-bottom: 1em; color: black; border-collapse: collapse; font-size: 95%;"
align="center" bgcolor="00008B" style="color: white;"

| Name

|colspan=2| Route

File:E79-HUN.svg

| align="right"|68 km

25px junction File:AB-Kreuz-blau.svg (0) – 25px junction File:AB-Kreuz-blau.svg (68)
File:E573-HUN.svg

| align="right"|17 km

25px Debrecen-dél File:AB-AS-blau.svg (44) – 25px Debrecen-észak File:AB-AS-blau.svg (37)

See also

References