{{Infobox power station
| name = Mammoth Geothermal Complex
| name_official = Mammoth Geothermal Complex
| image = Mammoth-Geothermal-20111102-22.jpg
| image_caption =
| country = United States
| location = Casa Diablo Hot Springs
Mono County, California
| coordinates = {{coord|37|38|44|N|118|54|42|W|type:landmark_region:US-CA|display=inline,title}}
| status = O
| construction_began =
| commissioned = Unit 1: 1984
Unit 2: 1990
Unit 3: 1990
Unit 4: 2022
| decommissioned =
| cost =
| owner = Ormat
| operator = Mammoth Pacific
| employees =
| geo_type = Binary cycle{{Cite web|url=http://www.mammothpacific.com/|title=Welcome To The Mammoth Geothermal Complex Website {{!}} mammothpacific|website=www.mammothpacific.com|access-date=2020-02-05}}
| geo_temp_requirement =
| geo_well_count =
| geo_well_depth =
| geo_water_output =
| ps_site_area =
| ps_site_elevation =
| ps_cooling_towers =
| ps_feed-in_tariff =
| ps_revenue =
| ps_combined_cycle =
| ps_cogeneration =
| ps_thermal_capacity =
| ps_units_operational = 3 x 10 MW, 1 x 30 MW
| ps_units_manu_model =
| ps_units_planned =
| ps_units_cancelled =
| ps_units_uc =
| ps_units_decommissioned =
| ps_electrical_capacity = 60 MW
| ps_electrical_cap_fac =
| ps_annual_generation = 215 GWh (2018) {{Cite web|url=https://www.eia.gov/electricity/data/browser/#/plant/10480?freq=A&start=2016&end=2018&ctype=linechart<ype=pin&pin=&maptype=0&linechart=ELEC.PLANT.GEN.10480-ALL-ALL.A&columnchart=ELEC.PLANT.GEN.10480-ALL-ALL.A|title=Electricity Data Browser - Mammoth Pacific I|website=www.eia.gov|access-date=2020-02-05}}{{Cite web|url=https://www.eia.gov/electricity/data/browser/#/plant/10481?freq=A&start=2016&end=2018&ctype=linechart<ype=pin&pin=&maptype=0&linechart=ELEC.PLANT.GEN.10481-ALL-ALL.A&columnchart=ELEC.PLANT.GEN.10481-ALL-ALL.A|title=Electricity Data Browser - Mammoth Pacific II|website=www.eia.gov|access-date=2020-02-05}}{{Cite web|url=https://www.eia.gov/electricity/data/browser/#/plant/10479?freq=A&start=2016&end=2018&ctype=linechart<ype=pin&pin=&maptype=0&linechart=ELEC.PLANT.GEN.10479-ALL-ALL.A&columnchart=ELEC.PLANT.GEN.10479-ALL-ALL.A|title=Electricity Data Browser - Ples I|website=www.eia.gov|access-date=2020-02-05}}
| ps_storage_capacity =
| website = [http://www.mammothpacific.com Mammoth Pacific]
}}
The Mammoth Geothermal Complex is a complex of 4 geothermal power stations located at Casa Diablo Hot Springs about {{convert|3|mi|km}} east of Mammoth Lakes, California. The complex is owned by Ormat and operated by its subsidiary Mammoth Pacific.{{Cite web|url=https://www.ormat.com/en/projects/all/main/Default.aspx?Country=USA&Seg=0&Tech=6&pageNum=1|title=Ormat Technologies Inc. - Ormat Technologies Inc. - Global Projects|website=www.ormat.com|access-date=2020-02-05}}
Description
The complex consists of four binary-cycle geothermal power stations, each with a nameplate capacity of 10 MW. Mammoth Pacific 1 (MP1) was commissioned in 1984 and was the first air-cooled geothermal power station in the world. Mammoth Pacific 2 (MPII) and PLES-1 were both commissioned in 1990 and use the same air-cooled technology.
In 2005, the geothermal well field was expanded into Basalt Canyon just west of the three power stations. Two production wells were drilled and connected to the existing power plants. In 2014, Ormat replaced the 30-year-old equipment of MP1 in order to improve its efficiency.
=Casa Diablo IV=
In 2006, Ormat proposed the construction of a 30 MW binary cycle geothermal power plant called Casa Diablo IV that would double the generating capacity of the geothermal complex.{{Cite web|url=http://www.mammothpacific.com/?q=node/15|title=Casa Diablo IV Project {{!}} mammothpacific|website=www.mammothpacific.com|access-date=2020-02-09}}
In 2014, the Mammoth Community Water District (MCWD) sued the Great Basin Unified Air Pollution Control District (GBUAP) and ORNI 50 LLC (Ormat) over concerns that the power plant would compromise the water supply of Mammoth Lakes. GBUAP and Ormat disputed this, arguing there was no connectivity between the deep geothermal reservoir and MCWD's groundwater aquifer based on extensive research conducted on the site. On June 25, 2015, the Mono County Superior Court ruled in favor of GBUAP and Ormat. In addition, on August 31, 2015, the Interior Board of Land Appeals denied an appeal made by MCWD.{{Cite web|url=https://www.kcet.org/redefine/mammoth-residents-concerned-over-geothermal-plant-threat-to-groundwater|title=Mammoth Residents Concerned Over Geothermal Plant Threat to Groundwater|last=Clarke|first=Chris|date=2014-06-16|website=KCET|language=en|access-date=2020-02-09}}{{Cite web|url=http://www.mammothpacific.com/sites/mammoth.dev4.linnovate.net/files/Lawsuit%20Blurb%20v2.pdf|title=Mammoth Community Water District v. Great Basin Unified Air Pollution Control District and ORNI 50 LLC|last=|first=|date=|website=|archive-url=|archive-date=|access-date=8 February 2020}}
Casa Diablo IV is expected to be operational by the end of 2021.{{Cite web|url=https://www.thinkgeoenergy.com/ormat-signs-ppa-with-community-choice-aggregator-for-new-30-mw-geothermal-plant-in-california/|title=Ormat signs PPA with community choice aggregator for new 30 MW geothermal plant in California|website=Think GeoEnergy - Geothermal Energy News|language=en-US|access-date=2020-02-09}} As of July 14th, 2022, Ormat announced that commercial operations at Casa Diablo IV had begun. {{Cite web |title=StackPath |url=https://www.ormat.com/en/company/news/view/?ContentId=9205 |access-date=2023-03-10 |website=www.ormat.com}}
Geology
{{main|Long Valley Caldera}}
The Mammoth Geothermal Complex is located at the base of a large resurgent dome near the center of the Long Valley Caldera. The dome was formed from the swelling or rising of the caldera floor due to movement in the magma chamber beneath it. The geothermal heat produced from the magma chamber below the dome causes groundwater to boil and turn to steam, creating fumaroles such as those seen in Fumarole Valley and along Hot Creek about {{convert|5|mi|km}} to the northeast. The geothermal complex utilizes this heat to power its binary-cycle power generators.
See also
References
{{Commons category|Mammoth Geothermal Complex}}
{{reflist}}
{{Generating stations in California|state=autocollapse}}
Category:1984 establishments in California
Category:Buildings and structures in Mono County, California