Moorabool Wind Farm is an operational wind farm located 25 km southeast of Ballarat in Victoria, Australia. The wind farm is in two parts: the northern part has 50 turbines, and the southern part has 54 turbines.{{Cite web|title=All turbines up at Goldwind's 312-MW Moorabool wind park |url=https://renewablesnow.com/news/all-turbines-up-at-goldwinds-312-mw-moorabool-wind-park-723350/|access-date=2021-11-16| website=Renewablesnow.com|language=en}} By December 2021, all 104 turbines had been put into place. The turbines each measure 169 m to the tip of the blade.
Development and purpose
The farm is being developed by Goldwind Australia.{{cite web |url=https://mooraboolwindfarm.com/ |title=Moorabool Wind Farm |publisher=Goldwind Australia |accessdate=5 October 2019}} When operational, it will be one of three wind farms in Moorabool Shire. The others are Yaloak South Wind Farm and Lal Lal Wind Farm.{{cite web |url=https://www.moorabool.vic.gov.au/residents/community/windfarms-in-moorabool |title=Windfarms in Moorabool |publisher=Shire of Moorabool |accessdate=5 October 2019}}
When fully operational, the farm will produce up to 312MW of electricity, enough energy to power approximately 228,000 Victorian homes.{{Cite web|date=2020-12-07|title=Moorabool Wind Farm turbine installations complete|url=https://www.energymagazine.com.au/moorabool-wind-farm-turbine-installations-complete/|access-date=2021-11-16|website=Energy Magazine|language=en-US}}
The components for the southern section were delivered from the Port of Geelong in a total of 594 oversized loads at a rate of approximately 33 per week from September 2019 to February 2020.{{cite web |url=https://mooraboolwindfarm.com/wp-content/uploads/2019/08/MSWF-Oversize-Deliveries-Electronic.pdf |title=Turbine Component deliveries |publisher=Goldwind Australia |accessdate=5 October 2019}}
The wind farm commenced partial operation in late 2020. Commissioning was completed in 2022.