Mourne Conduit

{{Short description|Former Irish water main}}

The Mourne Conduit is a water main which ran {{convert|42|km|mi}} from the Silent Valley Reservoir to Carryduff, near Belfast and was built between 1893 and 1901 for the Belfast City and District Water Commissioners.{{cite news |last=Devlin |first=Janet |date=14 August 2000 |title=Aquarius brings new dawn for fresh water |work=Belfast Telegraph |location=Belfast}} This was supplemented by additional pipelines twice in the 20th Century. This system supplied water to Greater Belfast and North Down for more than 100 years. It is labelled as the Mourne Aqueduct in Ordnance Survey maps from the early 20th century.

This system was partly replaced by the Aquarius Line, a dual pipeline between the Mourne Mountains and the Purdysburn Service Reservoir in Belfast which was constructed along with associated infrastructure as part of the Aquarius Mourne Water Project. The system provides water to approximately 20% of Northern Ireland's population.{{cite news |last=McGurk |first=Helen |date=17 December 2002 |title=Construction Firm Celebrates an Early Christmas Present |work=News Letter |location=Belfast}}

Mourne Conduit

In 1891, the Belfast Water Commissioners (BWC and later the Belfast City and District Water Commissioners or BC&DWC) hired Luke Livingston Macassey to investigate options for a source of an additional water supply for the expanding city of Belfast.{{Cite web|title=Your Place And Mine - Down - A Century of Water from the Mournes - a concise history|url=https://www.bbc.co.uk/northernireland/yourplaceandmine/down/A1068518.shtml|access-date=2021-04-21|website=BBC}} Macassey selected the Mourne Mountains for the reasons summarised in a 1935 report:

The portion of the Mourne Mountains acquired by the Commissioners totals approximately 9,000 acres. It is all mountainland [sic], uninhabited, and a large part of it is rocky and precipitous. It extends from about 330 feet above sea-level to a maximum of 2,796 feet above sea-level, Slieve Donard being the highest mountain within the area. It is practically devoid of trees, being covered with heather, gorse, and bracken where not granite rock and boulders. The average rainfall on the area is 57.6 inches per annum. It is drained by two streams : on the west, the Kilkeel river flowing due south, and the Annalong river, lying parallel to and to the east of the Kilkeel river, draining the Annalong Valley. The catchment of the Kilkeel river is 5,500 acres in extent, that of the Annalong river being 3,500 acres. The water of both these rivers is similar and of excellent quality, having 2 degrees of hardness.McIldowie, G. (1935). "The Construction of the Silent Valley Reservoir, Belfast Water-Supply" Minutes of the Proceedings of the Institution of Civil Engineers 1935, 239:1935, pp. 465-516
Macassey proposed a three stage project, with the Mourne Conduit part of the first phase. Construction occurred between 1893 and 1901 and involved the diversion of the Kilkeel and Annalong rivers into the new pipeline, the construction of a reservoir at Carryduff, and associated infrastructure. The Mourne Conduit consists of 7 miles of tunnel, 16 miles of concrete culvert and 12 miles of pressure pipeline. The second phase saw the completion of the Silent Valley Reservoir in 1933.{{Cite web|title=Your Place And Mine - Down - A Century of Water from the Mournes - Part 2|url=https://www.bbc.co.uk/northernireland/yourplaceandmine/down/A1068527.shtml|access-date=2021-04-21|website=BBC}} Plans for the third phase reservoir in the Annalong valley were abandoned, with the Annalong river instead diverted into the Silent Valley Reservoir via the Binnian Tunnel which was completed in 1952.

Due to increased demand, the Mourne Conduit was supplemented by additional pipeline sections between 1934 and 1937, mainly in the Newcastle and Ballynahinch valleys. In 1947, a three year construction project commenced which saw the installation of a second conduit between Silent Valley and the Dunnywater Straining Well above Annalong.{{Cite web|title=Your Place And Mine - Down - A Century of Water from the Mournes - Part 3|url=https://www.bbc.co.uk/northernireland/yourplaceandmine/down/A1068545.shtml|access-date=2021-04-21|website=BBC}} Between 1949 and 1956 Farrans was contracted to lay the "triplicate conduit" to increase the capacity of the system.{{cite web |url=https://www.bbc.co.uk/northernireland/yourplaceandmine/down/A1068563.shtml |title=Your Place & Mine: A Century of Water from the Mournes - Part 4 |website=/www.bbc.co.uk|publisher=BBC |access-date=2020-09-11}} That company would later work on the replacement Aquarius Line.

By the 1970s the BC&DWC's responsibilities had been assumed by the Department of the Environment. This body carried out a survey of the conduit which established the requirement to replace the {{Convert|8|km|mi}} section of conduit between the Annalong valley and the Donard Tunnel with pre-stressed concrete pipes. These works also include the lining of the tunnel through Slieve Donard with precast concrete liners.{{Cite web|title=Your Place And Mine - Down - A Century of Water from the Mournes - Part 6|url=http://www.bbc.co.uk/northernireland/yourplaceandmine/down/A1068608.shtml|access-date=2021-04-24|website=BBC}}

Lime dosing plants were built in 1985 along the route of the conduit at Silent Valley, Dunmore, and Carryduff.

=Lodges=

6 identical lodges were built along the route of the conduit for "water attendants" or "linesman" between 1899 and 1901. These attendants monitored the conduit, flushed valves, and carried out general maintenance work. They had access through boundaries via red gates marked with "BWC" along the route.{{Cite web|title=Your Place And Mine - Down - The Binnian Tunnel - Contemporary Photos|url=https://www.bbc.co.uk/northernireland/yourplaceandmine/down/A759026.shtml|access-date=2021-04-24|website=BBC}} The 6 lodges are at Tullybranigan near Newcastle, Ballybannon and Drumanaquoile near Castlewellan,{{Cite web|title=Historic Building Details: HB Ref No: HB18/11/041|url=https://apps.communities-ni.gov.uk/Buildings/buildview.aspx?id=2144&js=false|access-date=2021-03-13|publisher=Department for Communities}}{{Cite web|title=Historic Building Details: HB Ref No: HB18/16/007|url=https://apps.communities-ni.gov.uk/Buildings/buildview.aspx?id=4997&js=false|access-date=2021-03-13|publisher=Department for Communities}} and Dunmore, Ballykine and Brae Road (Creevytenant), near Ballynahinch.{{Cite web|title=Historic Building Details: HB Ref No: HB18/16/022|url=https://apps.communities-ni.gov.uk/Buildings/buildview.aspx?id=2175&js=false|access-date=2021-03-13|publisher=Department for Communities}}{{Cite web|title=Historic Building Details: HB Ref No: HB18/06/013 |url=https://apps.communities-ni.gov.uk/Buildings/buildview.aspx?id=12197&js=false|access-date=2021-03-13|publisher=Department for Communities}}{{Cite web|title=Historic Building Details: HB Ref No: HB18/01/038|url=https://apps.communities-ni.gov.uk/Buildings/buildview.aspx?id=2061&js=false|access-date=2021-03-13|publisher=Department for Communities}}

File:BWC building near Newcastle (geograph 4520819 by Rossographer).jpg|1 of 6 lodges built as part of the Mourne Conduit scheme.

File:Well House at Creevytenant, Ballynahinch.jpg|A well house above the Mourne Conduit near Ballynahinch and red access gate, now both listed.{{Cite web|title=Historic Building Details: HB Ref No: HB18/01/028|url=https://apps.communities-ni.gov.uk/Buildings/buildview.aspx?id=2165&js=false|access-date=2021-05-30|publisher=Department for Communities}}

File:Air well structure.jpg|Air well above the Mourne Conduit near Carryduff

Aquarius Line

The requirement to replace the Mourne Conduit was identified in the early 1990s by the Water Executive.{{cite web |url=https://www.niauditoffice.gov.uk/sites/niao/files/media-files/modernising_construction_procurement_in_ni.pdf |title=Modernising Construction Procurement in Northern Ireland |date=3 March 2005 |website=www.niauditoffice.gov.uk |publisher=Northern Ireland Audit Office |access-date=2020-09-12 |quote=}} This ultimately resulted in the Aquarius Mourne Water Project, a three phase £62 million project to replace the Mourne Conduit and pipelines with new 900mm and 1200mm pipelines laid concurrently, along with associated infrastructure.{{cite news|date=10 September 2004 |title=Water Plan on Course |work=News Letter }}{{Cite web|title=Water and Wastewater Portfolio|url=https://www.farrans.com/fs/doc/Water_and_Wastewater_Brochure.pdf|access-date=2021-03-21|website=www.farrans.com}}

  • Aquarius 1 - The first phase involved the construction of a water pumping station at Drumaroad which pumps water up 60m to a break pressure tank on the nearby Dunmore Mountain, the latter was also constructed as part of the project. This phase also saw the replacement of {{convert|20|km|mi}} of the Mourne Conduit between the pumping station and Ballynahinch and it was completed between May 1999 and May 2000.{{cite news|date=5 May 1999|title=Mourne Pipeline Set for Facelift |work=News Letter |location=Belfast}}{{cite news |last=Hewitt|first=Kim |date=21 February 2001 |title=History On Tap in The Mournes |work=News Letter |location=Belfast}}
  • Aquarius 2 - {{convert|11|km|mi}} of new pipeline from Ballynahinch to Belfast and from the Mourne Mountains to Drumaroad along with another pumping station.{{cite web |url=https://www.farrans.com/fs/doc/Water_and_Wastewater_Brochure.pdf |title=Water and Wastewater Portfolio |website=www.farrans.com |publisher=Farrans |access-date=2020-09-11}}{{cite web |url=https://waterprojectsonline.com/wp-content/uploads/case_studies/2003/Mourne-Aquarius-3-2003.pdf|title=Aquarius 3 – Mourne Water Treatment Works |last=Johnson|first=Norman |website=waterprojectsonline.com |publisher=Wastewater Treatment & Supply

|access-date=2020-09-11}} Ten service reservoirs along the route were also included in works as part of "The Valley Distribution Scheme".{{Cite news|last=Regan|first=Claire|date=22 Feb 2001|title=Pumps open for £100m water project|work=Belfast Telegraph}}{{Cite news|last=Drake|first=Michael|date=27 February 2001|title=Countryfile; £100m pumped into Down water scheme|work=Belfast Telegraph}}

The system provides water to approximately 20% of Northern Ireland's population.

In 2020, NI Water awarded a £13 million contract to Graham Construction for an expansion of water treatment facilities at the works.{{Cite web|title=£13 Million Upgrade at Drumaroad Water Treatment Plant to benefit a quarter of NI's population. - Northern Ireland Water|url=https://www.niwater.com/news-detail/11764/13-million-upgrade-at-drumaroad-water-treatment-plant-to-benefit-a-quarter-of-nis-population/|access-date=2021-03-14|website=www.niwater.com}}

File:Aquarius water pipeline.jpg|Installation of the pipelines

File:Aquarius Line marker.jpg|Marker posts for the Aquarius line water main near Ballynahinch.

File:Aquarius dual water pipeline at Ballynahinch.jpg|Aquarius dual water pipeline crossing the Ballynahinch River