NHPC

{{Short description|Indian public sector hydropower company}}

{{EngvarB|date=February 2017}}

{{Use dmy dates|date=February 2017}}

{{More citations needed|date=February 2017}}

{{Infobox company

| name = NHPC Limited

| logo = NHPC official logo.svg

| logo_size = 200px

| type = Public

| traded_as = {{BSE|533098}}
{{NSE|NHPC}}

| foundation = 7 November 1975

| image = NHPC Corporate Office.jpg

| image_caption = Headquarters in Faridabad

| location = Faridabad, Haryana, India{{Cite web|url=http://www.nhpcindia.com/Default.aspx?id=159&lg=eng&|title = NHPC Limited : Contact : NHPC Contact}}

| key_people = Shri Raj Kumar Chaudhary
(Chairman & Managing Director)

| industry = Electric utility

| products = Electricity generation
energy trading

| revenue = {{up}} {{INRConvert|10770|c}}

| revenue_year = 2023

| operating_income = {{increase}} {{INRConvert|5054.56|c}}

| income_year = 2023

| profit = {{profit}} {{INRConvert|3411.73|c}}

| net_income_year = 2025

| assets = {{increase}} {{INRConvert|73157|c}}

| assets_year = 2021

| equity = {{increase}} {{INRConvert|43892|c}}

| equity_year = 2024

| owner = Government of India (70.95%)

| num_employees = 4,597 (march 2025)

| homepage = {{URL|https://www.nhpcindia.com/}}

}}

NHPC Limited (erstwhile National Hydroelectric Power Corporation) is an Indian public sector hydropower company that was incorporated in 1975 to plan, promote and organise an integrated and efficient development of hydroelectric power. Recently it has expanded to include other sources of energy like solar, geothermal, tidal, and wind.

At present, NHPC is a Navaratna enterprise of the Government of India and among the top ten companies in the country in terms of investment base. Baira Suil Power station in Salooni tehsil of Chamba district was the first project undertaken by NHPC while Chamera-1 is the best.

Public Limited Company

NHPC is listed on the National Stock Exchange and Bombay Stock Exchange on 1 September 2009. The government of India and State Governments have 67.40% share as a promoter of the Company while remaining 32.6% is public shareholding. The total number of shareholders are {{formatnum:191337}} and share capital is ₹12,300,742,773.

Market value

At present, NHPC is a schedule 'A' Enterprise of the Govt. of India with an authorised share capital of ₹150 billion, with an investment base of over ₹552 billion Approx. In 2015–16 NHPC made a profit after tax of ₹24.40 billion. An increase of 15% than the previous year profit of ₹21.24 billion. NHPC is among the top 10 companies in India in terms of investment.

Initially, on incorporation, NHPC took over the execution of Salal Stage-I, Bairasiul and Loktak Hydro-electric Projects from Central Hydroelectric Projects Control Board. Since then, it has executed 22 hydro projects with an installed capacity of 6717 MW on ownership basis including projects taken up in a joint venture. One wind project of 50 MW has also been commissioned in October 2016. NHPC has also executed 5 projects with an installed capacity of 89.35 MW on turnkey basis. Two of these projects have been commissioned in neighbouring countries i.e. Nepal and Bhutan at a capacity of 14.1 &60 MW.

Ongoing Projects (as of Feb 2023)

Presently NHPC is engaged in the construction of 3 projects aggregating to a total capacity of 3130 MW. NHPC has planned to add 1702 MW during 12th Plan period of which 1372 MW has been completed. 5 projects of 4995 MW are awaiting clearances/Govt. approval for their implementation. Detailed Projects reports are being prepared for 3 projects of 1130 MW. Besides, 3 projects of 1230 MW are under development through its JV, Chenab Valley Power Projects Pvt. Ltd. in J&K.

In late 2016, NHPC commissioned a 50 MW wind Power Project in Jaisalmer, Rajasthan.{{cite news|title=NHPC commissions 50 MW wind power project in Rajasthan|url=https://www.thehindubusinessline.com/companies/nhpc-commissions-50-mw-wind-power-project-in-rajasthan/article9291544.ece|access-date=7 March 2018|agency=PTI|publisher=Business Line|date=1 November 2016}}

In April 16th 2025 with commission of its 4th Unit NHPC fully commissioned 800MW Parbati-II H.E. [https://government.economictimes.indiatimes.com/news/psu/nhpc-commissions-three-200-mw-units-of-800-mw-parbati-ii-hydroelectric-project/119899040 Project]. [https://www.waterpowermagazine.com/news/nhpc-commissions-three-units-of-parbati-ii-hydroelectric-project/?cf-view] [https://www.energetica-india.net/news/nhpc-fully-commissions-800-mw-parbati-ii-hydroelectric-project-in-himachal-pradesh]

Since its inception in 1975, NHPC has grown to become one of the largest organisations in the field of hydropower development in the country. With its present capabilities, NHPC can undertake all activities from concept to commissioning of hydroelectric projects.{{Cite web |url=http://www.cea.nic.in/reports/monthly/hydro/2016/hydro_stations-12.pdf |title=Archived copy |access-date=9 February 2017 |archive-date=11 February 2017 |archive-url=https://web.archive.org/web/20170211075853/http://www.cea.nic.in/reports/monthly/hydro/2016/hydro_stations-12.pdf |url-status=dead }}

Subsidiaries

  • [https://www.cvppindia.com/ Chenab Valley Power Projects Ltd.]
  • NHDC Limited
  • [https://www.bsulindia.com/ Bundelkhand Saur Urja Limited]
  • Ratle Hydroelectric Power Corporation (RHPC) Ltd.
  • Loktak Downstream Hydroelectric Corporation Limited
  • [https://jpcl.in/ Jal Power Corporation]
  • NHPC Renewable Energy Limited (NREL)

Power stations

Total – 8032.9MW (As on April 2025)

File:Nimmo Bazgo Dam.jpg

File:Teesta Low Dam-IV, West Bengal.jpg Low Dam-IV, West Bengal]]

class="sortable wikitable"
S.no.

!Power Plant

!State

!Commissioned Capacity (MW)

!year of commission

1

| Baira Siul

| Himachal Pradesh

| 180{{cite web|title=Baira Siul|url=http://www.nhpcindia.com/projectdetail.htm?CatId=1&ProjectId=7|website=NHPC|access-date=7 March 2018}}

| 1981

2

| Loktak

| Manipur

| 105

| 1983

3

|Salal

| Jammu and Kashmir

| 690

| 1987

4

| Tanakpur

| Uttarakhand

| 120

| 1992

5

| Chamera-I

| Himachal Pradesh

| 540

| 1994

6

| Uri-I

| Jammu and Kashmir

| 480

| 1997

7

| Rangit Dam

| Sikkim

| 60

| 1999

8

| Chamera II Hydroelectric Plant

| Himachal Pradesh

| 300

| 2004

9

| Indira Sagar*

| Madhya Pradesh

| 1000

| 2005

10

| Dhauliganga-I

| Uttarakhand

| 280

| 2005

11

| Dul Hasti

| Jammu and Kashmir

| 390

| 2007

12

| Omkareshwar*

| Madhya Pradesh

| 520

| 2007

13

| Teesta-V

| Sikkim

| 510

| 2008

14

| Sewa-II

| Jammu and Kashmir

| 120

| 2010

15

| Chamera-III

| Himachal Pradesh

| 231

| 2012

16

| Teesta Low Dam - III Hydropower Plant

| West Bengal

| 132

| 2013

17

| Nimmo Bazgo

| Ladakh

| 45

| 2013

18

|Chutak

| Ladakh

| 44

| 2012–13

19

| Uri-II

| Jammu and Kashmir

| 240

| 2013

20

| Parbati-III

| Himachal Pradesh

| 520

| 2014

21

| Jaisalmer Wind Farm

| Rajasthan

| 50

| 2016

22

| Teesta Low Dam - IV Hydropower Plant

| West Bengal

| 160

| 2016

23

| Kishenganga

| Jammu and Kashmir

| 330

| 2018

24

|Theni Solar farm

|Tamil Nadu

|50

|2018

25

|[https://www.energetica-india.net/news/nhpc-fully-commissions-800-mw-parbati-ii-hydroelectric-project-in-himachal-pradesh Parbati II]

|Himachal Pradesh

|800

|2025

26

|[https://nhdcindia.com/index.aspx Floating] [https://solarquarter.com/2024/10/30/nhpc-stock-surges-nhdc-commissions-floating-solar-power-plant-in-madhya-pradesh/ Solar Power] Project-[https://www.business-standard.com/markets/news/nhpc-up-3-as-unit-commissions-88-mw-omkareshwar-floating-solar-power-plant-124103000549_1.html Omkareshwar NHDC]

|Madhya Pradesh

|88

|2024

27

|[https://nhdcindia.com/Site/SanchiSolarProjectDetails.aspx?PID=3 Sanchi] Solar [https://economictimes.indiatimes.com/industry/renewables/sanchi-becomes-indias-first-solar-city/articleshow/103466294.cms?from=mdr Power Project]*

|Madhya Pradesh

|8

|2024

28

|[https://bsulindia.com/project.php Kalpi] Solar [https://cea.nic.in/wp-content/uploads/rpm_division/2024/05/Status_Report_on_Development_of_UMREPP_Solar_Parks_in_the_Country_as_on_30.04.2024..pdf Power Project] (BSUL) 65 MW

|Uttar Pradesh

|65

|2022

*Joint Venture with Madhya Pradesh (M.P.) Government through [https://nhdcindia.com/Site/SanchiSolarProjectDetails.aspx?PID=3 NHDC]

=Hydro Power Projects Under construction=

Total – 18399 MW (As on April 2025)

class="wikitable sortable"
S.no.

!Power Projects

!State

!Total Capacity (MW)

!Completion Schedule

1

| Subansiri (Lower)

| Arunachal Pradesh

| 2000

| 2020{{Cite web |url=http://www.telegraphindia.com/1160501/jsp/frontpage/story_83223.jsp#.V5HiKPl96Uk |title=Panel call to resume Subansiri dam work |access-date=22 July 2016 |archive-date=2 July 2016 |archive-url=https://web.archive.org/web/20160702064600/http://www.telegraphindia.com/1160501/jsp/frontpage/story_83223.jsp#.V5HiKPl96Uk |url-status=dead }}

2

|Pakal Dul*

|Jammu & Kashmir

|1000

|2024

3

|Kiru*

|Jammu & Kashmir

|625

|2024

4

|Ratle*

|Jammu & Kashmir

|850

|

5

|Kwar*[https://www.business-standard.com/article/economy-policy/rs-4-526-12-crore-sanctioned-for-540-mw-kwar-hydropower-project-in-j-k-122042701369_1.html]

|Jammu & Kashmir

|540

|2026

6

|[https://www.geojuristoday.in/post/subansiri-upper-multipurpose-project-sump-and-protests-against-it#:~:text=On%2021%20July%2C%202023%20the,Hydroelectric%20Project%20to%20NHPC%20ltd. Subansiri Upper] [https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=1948139 Project]

|Arunachal Pradesh

|2000

|2031

7

|[https://www.nhpcindia.com/welcome/project_detail/6/index.php.html Dibang] [https://www.power-technology.com/news/construction-2-88gw-dibang-project-india/?cf-view Multipurpose Project]

|Arunachal Pradesh

|2880

|2034

8

|Rangit-IV Project

|Sikkim

|120

|2026

9

|[https://www.business-standard.com/article/news-cm/nhpc-completes-takeover-of-rangit-stage-iv-he-project-121033100974_1.html Teesta-VI Project]

|Sikkim

|500

|2026

10

|[https://www.geojuristoday.in/post/subansiri-upper-multipurpose-project-sump-and-protests-against-it#:~:text=On%2021%20July%2C%202023%20the,Hydroelectric%20Project%20to%20NHPC%20ltd. Kamala H.E. Project]

|Arunachal Pradesh

|1800

|2031

11

|[https://www.pib.gov.in/PressReleseDetailm.aspx?PRID=1988259 Dulhasti Stage-II]

|Jammu & Kashmir

|258

|2030

12

|[https://www.pib.gov.in/PressReleseDetailm.aspx?PRID=1988259 Uri-I Stage-II]

|Jammu & Kashmir

|240

|2030

13

|[https://www.pib.gov.in/PressReleseDetailm.aspx?PRID=1988259 Sawalkote Project]

|Jammu & Kashmir

|1856

|2035

14

|[https://www.pib.gov.in/PressReleseDetailm.aspx?PRID=1988259 Kirthai Stage-II*]

|Jammu and Kashmir

|930

|2032

15

|[https://www.renewableenergyworld.com/hydro-power/nhpc-limited-to-develop-west-seti-and-sr-6-hydroelectric-projects/#:~:text=India's%20NHPC%20Limited%20has%20signed,Officer%20of%20IBN%20on%20Aug. West Seti H.E. Project]

|Nepal

|750

|2029

16

|[https://www.renewableenergyworld.com/hydro-power/nhpc-limited-to-develop-west-seti-and-sr-6-hydroelectric-projects/#:~:text=India's%20NHPC%20Limited%20has%20signed,Officer%20of%20IBN%20on%20Aug. Seti River-6 (SR-6) Project]

|Nepal

|450

|2029

17

|[https://www.pib.gov.in/PressReleasePage.aspx?PRID=1929103 Phukot Karnali H.E. Project]

|Nepal

|480

|2029

18

|[https://www.nhpcindia.com/welcome/project_detail/46/6.html Teesta-IV H.E. Project]

|Sikkim

|520

|2030

19

|[https://www.nhpcindia.com/welcome/project/3 Solar Power] [https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=2014904 Project at Khavda-1]

|Gujrat

|200

|2026

20

|[https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=2006692 Rajasthan] Solar [https://www.saurenergy.com/solar-energy-news/nhpc-connects-300-mw-rajasthan-solar-project Power Project]

|Rajasthan

|300

|2026

21

|1000MW CPSUs Scheme Solar [https://www.saurenergy.com/solar-energy-news/nhpc-awards-contracts-for-cpsu-1000-mw-solar-projects Project], Andhra Pradesh

|Andhra Pradesh

|100

|2026

*Under JV through Chenab Valley Power Projects (P) Limited, in Kishtwar District of J&K.

= Hydropower & Pump Storage (PSP) Projects Under Investigation =

class="wikitable"

|+

!Sl. No.

!Projects

!State

!Total Capacity (MW)

!Completion Schedule

1

|Siang Upper [https://indianexpress.com/article/india/nhpc-upper-siang-hydroelectric-project-china-8391829/ Project]

|Arunachal Pradesh

|11000

|2035

2

|[https://www.energetica-india.net/news/nhpc-signs-mou-with-maharashtra-govt-for-7350-mw-solar-pumped-storage-projects Kengadi] PSP

|Maharashtra

|1550

|2035

3

|[https://www.energetica-india.net/news/nhpc-signs-mou-with-maharashtra-govt-for-7350-mw-solar-pumped-storage-projects Savitri] PSP

|Maharashtra

|2250

|2035

4

|[https://www.energetica-india.net/news/nhpc-signs-mou-with-maharashtra-govt-for-7350-mw-solar-pumped-storage-projects Kalu] PSP

|Maharashtra

|1150

|2034

5

|[https://www.energetica-india.net/news/nhpc-signs-mou-with-maharashtra-govt-for-7350-mw-solar-pumped-storage-projects Jalond] PSP

|Maharashtra

|2400

|2035

6

|[https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=1935018 Masinta] PSP

|Odisha

|1000

|2035

7

|[https://powerline.net.in/2024/10/03/nhpc-and-apgenco-signs-jva-to-set-up-1-8-gw-psp/ Yaganti] PSP*

|Andhra Pradesh

|1000

|2035

8

|[https://powerline.net.in/2024/10/03/nhpc-and-apgenco-signs-jva-to-set-up-1-8-gw-psp/ Rajupalem] PSP*

|Andhra Pradesh

|800

|2034

*Under Joint Venture with Andhra Pradesh Power Generation Corp. Ltd [https://apgenco.gov.in/ (APGENCO)]

= Solar, Wind & Hydrogen Power Projects =

class="wikitable"

|+

!Sl.No.

!Project

!State

!Total Capacity (MW)

!Completion Schedule

1

|[https://bsulindia.com/project.php Mirzapur] Jagir [https://www.nhpcindia.com/welcome/project/1/2 Solar PV Park]*

|Uttar Pradesh

|100

|2027

2

|[https://bsulindia.com/project.php Madhogarh] [https://omnicoreplus.com/post/nhpc-invites-bids-for-600-mw-solar-park-in-madhogarh-uttar-pradesh/ Solar Power] Project*

|Uttar Pradesh

|600

|2028

3

|[https://bsulindia.com/project.php Jalaun] [https://solarquarter.com/2025/02/17/nhpc-invites-bids-for-epc-contract-to-develop-1200-mw-solar-power-park-infrastructure-in-uttar-pradesh/ Solar Park] Project*

|Uttar Pradesh

|1200

|2028

4

|[https://solarquarter.com/2024/05/30/bhel-issues-tender-for-300-mw-floating-solar-project-in-odisha-for-nhpc/ Floating Solar Project] Rengali

|Odisha

|300

|2026

5

|[https://www.pib.gov.in/PressReleasePage.aspx?PRID=1841750 Hydrogen] [https://www.mercomindia.com/nhpc-green-hydrogen-mobility-station Mobility Station Kargil]

|Ladakh

|500KW

|2026

  • Under Joint Venture with Uttar Pradesh Government BUNDELKHAND SAUR URJA LIMITED (BSUL)

=Scheduling and Dispatch=

The Scheduling and dispatch of all the generating stations owned by National Hydro Power Corporation is done by the respective Regional Load Dispatch Centres which are the apex body to ensure the integrated operation of the power system grid in the respective region. All these load dispatch centres come under Power System Operation Corporation Limited (POSOCO).

Awards and recognition

  • Winner at Dun & Bradstreet-Everest Infra Awards 2015 in the Power Generation (Renewable Energy) category recognising its performance under the category.
  • 'Gold Shield' for the year 2013–14 in the category of 'Early Completion of Hydro Power Projects' for Unit −3 (15 MW) of its Nimoo Bazgo Hydro Electric Project, Jammu & Kashmir, at a function held in Vigyan Bhawan, New Delhi on 3 June 2015.
  • "CBIP Award for Best Performing Utility in Power Sector" at CBIP Awards on CBIP Day on 1 January 2015 in New Delhi.
  • "Most Valuable PSU under Mini Ratna Category" at the India Today Group PSU Awards on 21 August 2014 in New Delhi.
  • "Most Eco-Friendly Award" and "Most Valuable Company Award" in the Mini Ratna Category at the second India Today Group PSU Awards held on 14 December 2015.
  • "Best Performing Utility in Hydro Power Sector" at the CBIP Award held at New Delhi on 29 December 2015.
  • "Award for excellence in cost management" held at New Delhi on 28 May 2016. The award – instituted by The Institute of Cost Accountants of India – recognises NHPC's efforts in implementing effective cost management practices.
  • "Best Hydropower Enterprise Award" by Hydropower Forum of India under the aegis of Enertia Foundation and Renewable Energy Promotion Association at the 2nd India Hydro Awards 2016 held at New Delhi on 10 June 2016.
  • "Best Mini Ratna" at Dun & Bradstreet PSU Awards 2016.
  • Awarded Second Prize by Ministry of Home Affairs, Govt. of India for the year 2015–16 under "Rajbhasha Kirti Puruskar" scheme for commendable work in the implementation of Rajbhasha amongst Public Sector Undertakings located in Region 'A'.
  • NHPC has been conferred with CBIP Awards 2020 for “Outstanding performing utility in hydro power sector” on 19.02.2020.{{Cite web|url=http://www.nhpcindia.com/Default.aspx?id=72&lg=eng&|title=NHPC Limited : Investor Corner : Performance Highlights}}

References

{{reflist|30em}}

References to New Project

  1. [https://psuwatch.com/newsupdates/arunachal-pradesh-govt-approves-allotment-of-2-hydropower-projects-to-nhpc Subansiri] [https://economictimes.indiatimes.com/industry/energy/power/arunachal-pradesh-govt-approves-allotment-of-two-power-projects-to-nhpc/articleshow/102040289.cms?from=mdr Upper] [https://www.renewableenergyworld.com/energy-business/new-project-development/nhpc-to-develop-2-gw-subansiri-upper-and-1-8-gw-kamala-hydroelectric-projects/ Project] [https://www.geojuristoday.in/post/subansiri-upper-multipurpose-project-sump-and-protests-against-it#:~:text=On%2021%20July%2C%202023%20the,Hydroelectric%20Project%20to%20NHPC%20ltd. Allotted] to [https://www.nhpcindia.com/welcome/project/1/6 NHPC Ltd.] [https://www.pib.gov.in/indexd.aspx PIB] [https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=1948139 Link]
  2. [https://psuwatch.com/newsupdates/arunachal-pradesh-govt-approves-allotment-of-2-hydropower-projects-to-nhpc Kamala] [https://economictimes.indiatimes.com/industry/energy/power/arunachal-pradesh-govt-approves-allotment-of-two-power-projects-to-nhpc/articleshow/102040289.cms?from=mdr Hydroelectric] [https://www.renewableenergyworld.com/energy-business/new-project-development/nhpc-to-develop-2-gw-subansiri-upper-and-1-8-gw-kamala-hydroelectric-projects/ Project] [https://www.geojuristoday.in/post/subansiri-upper-multipurpose-project-sump-and-protests-against-it#:~:text=On%2021%20July%2C%202023%20the,Hydroelectric%20Project%20to%20NHPC%20ltd. Allotted] to [https://www.nhpcindia.com/welcome/project/1/6 NHPC Ltd.]
  3. [https://www.pib.gov.in/PressReleseDetailm.aspx?PRID=1988259 Dulhasti] [https://www.dailyexcelsior.com/cm-announces-exhaustive-plan-for-24x7-power-supply-in-jk/ Stage-II] [https://kashmirlife.net/jammu-kashmir-seeks-to-reclaim-hydropower-projects-from-nhpc-385891/ Project]
  4. [https://www.dailyexcelsior.com/cm-announces-exhaustive-plan-for-24x7-power-supply-in-jk/ Uri-I] [https://www.pib.gov.in/PressReleseDetailm.aspx?PRID=1988259 Stage-II] [https://kashmirlife.net/jammu-kashmir-seeks-to-reclaim-hydropower-projects-from-nhpc-385891/ Project]
  5. [https://www.pib.gov.in/PressReleseDetailm.aspx?PRID=1988259 Sawalkote] [https://www.dailyexcelsior.com/cm-announces-exhaustive-plan-for-24x7-power-supply-in-jk/ Hydroelectric] [https://kashmirlife.net/jammu-kashmir-seeks-to-reclaim-hydropower-projects-from-nhpc-385891/ Project]
  6. [https://www.pib.gov.in/PressReleseDetailm.aspx?PRID=1988259 Kirthai] [https://cea.nic.in/wp-content/uploads/hpa/2024/07/hydro_concurred__yet_to_be_taken_up_construction_pa_09.docx.pdf Stage-II] [https://www.dailyexcelsior.com/cm-announces-exhaustive-plan-for-24x7-power-supply-in-jk/ Hydroelectric] [https://cea.nic.in/wp-content/uploads/hpi/2024/02/State_profile_on_hydro_development.pdf Project]
  7. [https://www.fundz.net/agreements/national-hydroelectric-power-corporation-nhpc-private-limited-contract-2b3438 West Seti] [https://timesofindia.indiatimes.com/nhpc-to-sell-power-to-ptc-india-from-upcoming-nepal-projects/articleshow/93887146.cms Hydroelectric] [https://www.renewableenergyworld.com/hydro-power/nhpc-limited-to-develop-west-seti-and-sr-6-hydroelectric-projects/#:~:text=India's%20NHPC%20Limited%20has%20signed,Officer%20of%20IBN%20on%20Aug. Project]
  8. [https://www.renewableenergyworld.com/hydro-power/nhpc-limited-to-develop-west-seti-and-sr-6-hydroelectric-projects/#:~:text=India's%20NHPC%20Limited%20has%20signed,Officer%20of%20IBN%20on%20Aug. Seti River-6 (SR-6)] [https://timesofindia.indiatimes.com/nhpc-to-sell-power-to-ptc-india-from-upcoming-nepal-projects/articleshow/93887146.cms Hydroelectric] [https://www.renewableenergyworld.com/energy-business/energy-finance/nhpc-signs-mou-for-power-sales-from-west-seti-and-sr-6-hydro-projects-in-nepal/ Project]
  9. [https://economictimes.indiatimes.com/industry/energy/power/nhpc-inks-initial-pact-with-nepalese-utility-to-develop-480-mw-phukot-karnali-hydro-project/articleshow/100682093.cms?from=mdr Phukot Karnali] [https://www.constructionworld.in/energy-infrastructure/power-and-renewable-energy/nhpc--amp;-vucl-nepal-sign-mou-for-phukot-karnali-hydro-electric-project/41472 Hydroelectric] [https://www.pib.gov.in/PressReleasePage.aspx?PRID=1929103 Project]
  10. [https://indianexpress.com/article/india/nhpc-upper-siang-hydroelectric-project-china-8391829/ Siang Upper] Hydroelectric [https://vajiramandravi.com/upsc-daily-current-affairs/prelims-pointers/what-is-upper-siang-hydropower-project/ Project] [https://www.tnpscthervupettagam.com/currentaffairs-detail/upper-siang-hydroelectric-project NHPC Submitted Pre feasibility Report of Siang Upper Project] [https://www.livemint.com/industry/media/is-ai-the-end-of-human-storytelling-pocket-fm-bets-on-collaboration-11747106182514.html [1]] [https://optimizeias.com/nhpc-submits-pre-feasibility-report-on-upper-siang-hydroelectric-project/ [2]] [https://www.guwahatiplus.com/northeast/nhpc-submits-feasibility-report-for-11gw-hydro-power-project-in-arunachal-pradesh [3]]
  11. [https://www.renewableenergyworld.com/energy-business/energy-finance/nhpc-signs-agreement-to-take-over-120-mw-rangit-iv-he-project/ NHPC completes takeover of Rangit Stage-IV HE Project] [https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=1688342 NHPC signs Definitive Agreement for implementation of ..]. [https://www.business-standard.com/article/news-cm/nhpc-completes-takeover-of-rangit-stage-iv-he-project-121033100974_1.html NHPC completes takeover of Rangit Stage-IV HE Project]
  12. [https://www.renewableenergyworld.com/energy-business/new-project-development/nhpc-signs-definitive-agreement-for-acquisition-of-500-mw-teesta-vi-hydroelectric-project/ NHPC to complete] [https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=1567752 Teesta VI hydropower project] in Sikkim [https://economictimes.indiatimes.com/industry/energy/power/nhpc-to-complete-teesta-vi-hydropower-project-in-sikkim/articleshow/68374131.cms?from=mdr [1]] Patel-Engineering-bags-rs-1251-cr-order-for-500-mw-Teesta-VI [https://timesofindia.indiatimes.com/patel-engineering-bags-rs-1251-cr-order-for-500-mw-teesta-vi-hydro-power-project/articleshow/86549642.cms [1]] [https://energy.economictimes.indiatimes.com/news/power/nhpc-board-approves-merger-of-lanco-teesta-hydro-power-with-it/78780554 NHPC Board Approve merger of Lanco Teesta]
  13. [https://www.energetica-india.net/news/nhpc-signs-mou-with-maharashtra-govt-for-7350-mw-solar-pumped-storage-projects NHPC-Signs-MOU]-with-[https://www.waterpowermagazine.com/news/nhpc-and-maharashtra-govt-sign-mou-for-pumped-storage-development/#:~:text=NHPC%20and%20Maharashtra%20Govt%20sign%20MoU%20for%20pumped%20storage%20development,-Carrieann%20Stocks%20September&text=The%20Department%20of%20Water%20Resources,7350%20MW%20in%20Maharashtra%2C%20India. maharashtra-govt-for-7350-mw]-[https://www.cnbctv18.com/market/stocks/nhpc-revises-mou-with-maharashtra-govt-for-7350-mw-renewable-energy-storage-systems-19470351.htm Pumped-Storage-Projects] [https://www.energetica-india.net/news/nhpc-signs-mou-with-maharashtra-govt-for-7350-mw-solar-pumped-storage-projects [1]] [https://www.waterpowermagazine.com/news/nhpc-and-maharashtra-govt-sign-mou-for-pumped-storage-development/#:~:text=NHPC%20and%20Maharashtra%20Govt%20sign%20MoU%20for%20pumped%20storage%20development,-Carrieann%20Stocks%20September&text=The%20Department%20of%20Water%20Resources,7350%20MW%20in%20Maharashtra%2C%20India. [2]] [https://www.cnbctv18.com/market/stocks/nhpc-revises-mou-with-maharashtra-govt-for-7350-mw-renewable-energy-storage-systems-19470351.htm [3]]
  14. [https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=1935018 NHPC signs MoU] with [https://www.gridco.co.in/ GRIDCO Odisha], for developing [https://psuwatch.com/newsupdates/nhpc-signs-pact-to-develop-2-gw-psp-1-gw-solar-energy-projects-in-odisha 2 GW Pumped Storage Projects] and 1 GW Solar Energy Projects in Odisha.[https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=1935018 [1]] [https://www.renewableenergyworld.com/energy-storage/pumped-storage/indias-nhpc-signs-mou-to-develop-pumped-storage-projects-in-odisha-state/ [2]] [https://psuwatch.com/newsupdates/nhpc-signs-pact-to-develop-2-gw-psp-1-gw-solar-energy-projects-in-odisha [3]] [https://renewablewatch.in/2023/06/26/nhpc-collaborates-with-gridco-odisha-for-2-gw-psp-and-1-gw-solar-power-plants/ [4]]
  15. NHPC and APGENCO signs JVA to set up 1.8 GW PSP [https://energy.economictimes.indiatimes.com/news/renewable/nhpc-forms-jv-with-power-producer-apgenco-for-renewable-energy-projects/117504692 [1]] [https://www.pv-magazine-india.com/2024/09/27/nhpc-apgenco-sign-jv-agreement-for-renewables-pumped-storage-development/ [2]] [https://www.mercomindia.com/nhpc-apgenco-joint-pumped-hydro-storage-projects [3]] [https://powerline.net.in/2024/10/03/nhpc-and-apgenco-signs-jva-to-set-up-1-8-gw-psp/ [4]] [https://renewablewatch.in/2024/10/01/nhpc-apgenco-to-set-up-jv-for-1-8-gw-pumped-storage-projects/ [5]]
  16. [https://www.power-technology.com/news/construction-2-88gw-dibang-project-india/?cf-view Construction starts] on 2.88GW [https://www.nhpcindia.com/welcome/project_detail/6/index.php.html Dibang] hydropower project [https://arunachaltimes.in/index.php/2023/12/13/work-for-dibang-multipurpose-project-begins/ [1]] [https://vajiramandravi.com/upsc-daily-current-affairs/prelims-pointers/dibang-multipurpose-project/ [2]] [https://powerline.net.in/2024/03/12/prime-minister-inaugurates-2880-mw-dibang-multipurpose-hydroelectric-project-of-arunachal-pradesh/ [3]] [https://www.power-technology.com/news/construction-2-88gw-dibang-project-india/?cf-view [4]] [https://www.nsenergybusiness.com/contracts/bhel-wins-contract-for-2-8gw-dibang-multipurpose-project-from-nhpc/ BHEL wins contract for 2.8GW Dibang Multipurpose]
  17. NHPC to build India’s 520-MW Teesta 4 hydro Project [https://www.renewableenergyworld.com/energy-business/new-project-development/india-renews-pre-qualifying-to-build-india-s-520-mw-teesta-4-hydro-project/ [1]]
  18. Hydro-mechanical contract tendered for Teesta VI in India [https://www.hydropower-dams.com/news/hydro-mechanical-contract-tendered-for-teesta-vi-in-india/ [1]] [https://www.gem.wiki/Teesta-IV_hydroelectric_plant#cite_note-autoref_0-1 [2]] [https://www.energetica-india.net/news/nhpc-signs-agreement-to-procure-500-mw-teesta-vi-hydro-project [3]]
  19. [https://www.power-technology.com/data-insights/power-plant-profile-nhpc-mirzapur-jagir-solar-pv-park-india/ NHPC Mirzapur Jagir Solar PV Park, India] [https://www.power-technology.com/data-insights/power-plant-profile-nhpc-mirzapur-jagir-solar-pv-park-india/ [1]] [https://renewablewatch.in/2021/03/25/nhpc-invites-bids-for-epc-services-for-100-mw-solar-park-in-uttar-pradesh/ [2]]
  20. NHPC Invites Bids for 600 MW Solar Park in Madhogarh, Uttar Pradesh [https://omnicoreplus.com/post/nhpc-invites-bids-for-600-mw-solar-park-in-madhogarh-uttar-pradesh/ [1]] [https://solarquarter.com/2024/12/11/nhpc-invites-bids-for-600-mw-phase-i-solar-park-development-in-uttar-pradesh/ [2]]
  21. NHPC Invites Bids For EPC Contract To Develop 1,200 MW Solar Power Park [https://solarquarter.com/2024/12/11/nhpc-invites-bids-for-600-mw-phase-i-solar-park-development-in-uttar-pradesh/ [1]] [https://solarquarter.com/2025/02/17/nhpc-invites-bids-for-epc-contract-to-develop-1200-mw-solar-power-park-infrastructure-in-uttar-pradesh/ [2]] [https://www.saurenergy.com/solar-energy-news/nhpc-call-for-bids-for-1-2-gw-solar-park-project-at-up [3]]
  22. NHPC Rengali Reservoir Floating Solar PV Park, India [https://solarquarter.com/2024/05/30/bhel-issues-tender-for-300-mw-floating-solar-project-in-odisha-for-nhpc/ [1]] [https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=1787993 [2]] [https://www.power-technology.com/data-insights/power-plant-profile-nhpc-rengali-reservoir-floating-solar-pv-park-india/ [3]]
  23. Omkareshwar Floating Solar Power Plant (FSPV) [https://solarquarter.com/2024/10/30/nhpc-stock-surges-nhdc-commissions-floating-solar-power-plant-in-madhya-pradesh/ [1]] [2] [https://www.business-standard.com/markets/news/nhpc-up-3-as-unit-commissions-88-mw-omkareshwar-floating-solar-power-plant-124103000549_1.html [3]]
  24. Sanchi Solar Power Project [https://economictimes.indiatimes.com/industry/renewables/sanchi-becomes-indias-first-solar-city/articleshow/103466294.cms?from=mdr [1]] [https://solarquarter.com/2024/01/24/a-historic-beacon-of-sustainability-indias-first-solar-city-2/ [2]] [https://www.ndtv.com/india-news/sanchi-countrys-first-solar-city-grapples-with-power-crisis-6381181 [3]] [https://www.mercomindia.com/nhdc-epc-tender-8-mw-solar-project-madhya-pradesh [4]] [https://renewablewatch.in/2022/09/14/nhdc-floats-tender-for-solar-project-in-sanchi-madhya-pradesh/ [5]]
  25. NHPC signs MoU to develop pilot green hydrogen projects [https://www.mercomindia.com/nhpc-green-hydrogen-mobility-station [1]] [https://energy.economictimes.indiatimes.com/news/renewable/nhpc-signs-mou-to-develop-pilot-green-hydrogen-projects/92901691 [2]] [https://energy.economictimes.indiatimes.com/news/renewable/gensol-to-develop-nhpcs-green-hydrogen-mobility-station-project-in-ladakh/105261593 [3]] [https://www.pib.gov.in/PressReleasePage.aspx?PRID=1841750 [4]] [https://www.mercomindia.com/nhpc-invites-bids-for-hydrogen-fuel-cell-buses-in-leh-and-himachal-pradesh [5]]
  26. NHPC to develop 200 MW Solar Power Project at Khavda,[https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=2014904 [1]] [https://www.mercomindia.com/nhpc-epc-200-mw-solar-gujarat [2]] [https://jmkresearch.com/wp-content/uploads/2023/07/200MW_Tender_Document.pdf [3]] [https://www.mercomindia.com/daily-wrap-up-nhpc-epc-200-mw [4]] [https://www.energetica-india.net/news/nhpc-invites-bids-for-200-mw-solar-pv-power-project-in-khavda-gujarat [5]]
  27. Rajasthan Solar Power Project-NHPC Connects 300MW Solar Power Project [https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=2006692 [1]] [https://www.saurenergy.com/solar-energy-news/nhpc-connects-300-mw-rajasthan-solar-project [2]] [https://renewablewatch.in/2024/02/20/pm-lays-foundation-stone-of-nhpcs-300-mw-bikaner-solar-project/ [3]] [https://www.pv-magazine-india.com/2025/04/14/nhpc-commissions-107-mw-solar-in-rajasthan/ [4]]
  28. NHPC Awards Contracts For CPSU 1000 MW Solar Projects [https://www.saurenergy.com/solar-energy-news/nhpc-awards-contracts-for-cpsu-1000-mw-solar-projects [1]] [https://www.business-standard.com/article/news-cm/nhpc-awards-epc-contracts-for-development-of-1000-mw-solar-pv-project-122051300308_1.html [2]] [https://renewablewatch.in/2022/05/13/nhpc-awards-contracts-for-1000-mw-of-solar-projects/ [3]] [https://economictimes.indiatimes.com/industry/renewables/nhpc-awards-contracts-for-1000-mw-solar-project/articleshow/91524411.cms?from=mdr [4]] [https://solarquarter.com/2024/09/05/nhpc-secures-approval-for-1000-mw-solar-power-usage-charges-of-%E2%82%B92-45-kwh-under-cpsu-scheme-phase-ii/ [5]] [https://www.gem.wiki/Andhra_Pradesh_(NHPC)_solar_plant [6]]
  29. Kalpi Saur Urja Power Project [https://bsulindia.com/uploads/others/Commissioning_12_Jul_20221657631100.pdf Commissioned] [https://cea.nic.in/wp-content/uploads/rpm_division/2025/02/Quarterly_Status_Report_on_Development_of_Solar_Parks__UMREPPs_in_the_Country_as_on_December2024..pdf [1]] [https://egov.eletsonline.com/2024/02/upnedas-holistic-approach-to-sustainable-energy-in-uttar-pradesh/ [2]] [https://www.power-technology.com/marketdata/bsul-kalpi-solar-pv-park-india/?cf-view [3]] [http://www.cspm.gov.in/ocmstemp/PROJ_SUMMARY?prcd=N18000323&stat=C [4]] [https://www.power-technology.com/data-insights/power-plant-profile-upneda-kalpi-solar-pv-park-india/ [5]]