Nexif Energy
{{Use Australian English|date=October 2019}}
{{Use dmy dates|date=October 2019}}
{{Infobox company
| name = Nexif Energy
| logo =
| type =
| industry =
| fate =
| predecessor =
| successor =
| founded = {{Start date and age|2015|08}} in Singapore
| founder =
| defunct =
| hq_location_city = Singapore
| hq_location_country = Singapore
| area_served =
| key_people =
| products =
| owner =
| num_employees =
| num_employees_year =
| parent = Nexif
| website = {{URL|http://www.nexifenergy.com/}}
}}
Nexif RATCH Energy is a Singapore-based company that owns and operates wind farms and other renewable energy projects in several countries. It is a joint venture of Nexif and RATCH Group Thailand PCL founded in December 2022.{{cite web |url=http://www.nexifenergy.com/shareholders-wind-solar-renewable-developer/ |title=Shareholders |publisher=Nexif Energy |accessdate=4 October 2019}}
Power sources
class="wikitable sortable"
|+ Nexif power stations{{cite web |url=http://www.nexifenergy.com/nexif-energy-project/ |title=Nexif Energy Projects |publisher=Nexif Energy |accessdate=4 October 2019}} ! Site ! Country ! Location ! Type ! Generation (MW) | ||||
Lincoln Gap Wind Farm | Australia | Lincoln Gap, South Australia | Wind farm | 212 |
Glen Innes Wind Farm | Australia | Glen Innes, New South Wales | Wind farm | 90 |
Ben Tre wind farm | Vietnam | Thạnh Phú District, Ben Tre Province | Wind farm | 80 |
Coc San Hydro Power | Vietnam | Lào Cai Province | Run of the river hydro | 30 |
Nexif Energy Rayong (NER) | Thailand | Rayong | Combined cycle | 110 |
In August 2019, Nexif took up a 25-year lease of the Temporary Generation North consisting of five open cycle gas turbines in South Australia, with the lease taking effect from May 2020.{{cite news |url=https://indaily.com.au/news/2019/08/29/leasing-out-state-owned-diesel-generators-will-push-prices-down-expert/ |title=Leasing out state-owned diesel generators will push prices down: expert |first=Bension |last=Siebert |newspaper=InDaily |date=29 August 2019 |accessdate=30 August 2019}} The generators will be relocated by Nexif to a new site at Outer Harbor and converted to operate on natural gas before the end of 2020. Nexif also proposes to convert them to combined cycle with a steam turbine in the following few years.{{cite web |url=http://www.nexifenergy.com/press_release/nexif-energy-provide-154mw-reliable-gas-generation-south-australian-power-grid/ |publisher=Nexif Energy |title=NEXIF ENERGY TO PROVIDE 154MW OF RELIABLE GAS GENERATION TO THE SOUTH AUSTRALIAN POWER GRID |date=28 August 2019 |accessdate=30 August 2019}}