NorNed
{{Infobox power transmission line
| name = NorNed
| photo =
| caption =
| map = {{maplink |type=line |frame=yes |plain=yes |frame-align=center |zoom=4}}
| map_caption = Location of NorNed
| country = Norway, Netherlands
| state =
| province =
| coordinates = {{Coord|53|26|4|N|6|51|57|E|type:landmark|name=NorNed - Eemshaven Static Inverter Plant}}
{{coord|58|16|58|N|6|51|55|E|type:landmark|name=NorNed - Feda Static Inverter Plant}}
| lat =
| long =
| direction = north–south
| start = Feda, Norway
| through = North Sea
| finish = Eemshaven, Netherlands
| par =
| owner =
| operator =
| cable_manufacturer = Nexans, ABB
| cable_installer =
| cable_layer =
| substation_manufacturer=
| substation_installer=
| contractors =
| construction = 2006
| expected =
| est = 2008
| decom =
| type = submarine cable
| current_type = HVDC
| length_km = 580
| capacity = 700 MW
| AC_voltage = 300 kV (Feda), 400 kV (Eemshaven)
| DC_voltage = ±450 kV
| circuits_no =
}}
NorNed is a {{convert|580|km|mi|adj=on}} long high-voltage direct current submarine power cable between Feda, Norway and the seaport of Eemshaven in the Netherlands, which interconnects both countries' electrical grids. It was once the longest submarine power cable in the world.Skog, J.E., van Asten, H., Worzyk, T., Andersrød, T., Norned – World’s longest power cable, CIGRÉ session, Paris, 2010, paper reference B1-106. Budgeted at €550 million, and completed at a cost of €600m, the NorNed cable is a bipolar HVDC link with a voltage of ±450 kV and a capacity of 700 MW. NorNed is a joint project of the Norwegian transmission system operator Statnett and its Dutch counterpart TenneT. The cable system itself and the two converter stations were produced by ABB.
History
Installation of the first sections started in early 2006 and the final section was laid by the end of 2007. On the Dutch shore, TenneT has connected the cable to the 380 kV Dutch high‑voltage grid. In Feda, Statnett has done the same for the 300 kV Norwegian transmission grid. Commercial operation started on 5 May 2008 with a capacity auction. The first commercial power transfer took place on 6 May 2008.
After two months of operation, the cable generated revenues of approximately €50 million. In the business case drawn up for the NorNed cable, annual revenues were estimated at €64 million.
NorNed has been included in European Market Coupling Company operations as of 12 January 2011. The internal grid in Norway is sometimes not capable of handling enough power for NorNed and Cross-Skagerrak, and capacity for these cables is then artificially limited.{{cite web|url=http://www.tu.no/kraft/2014/01/17/statnett-forsvarer-struping-av-norned |title=Statnett forsvarer struping av Norned |trans-title=Statnett defends throttling of Norned |lang=no |last=Lie |first=Øyvind |work=Teknisk Ukeblad (Technical Weekly) |date=17 January 2014 |access-date=12 January 2015}}
The cable had a fault in 2011, causing 7 weeks out of operation.{{cite web|url= http://www.vbms.com/en/projects/detail/norned-interconnector-cable-repair |title=NorNed Interconnector - Cable Repair|publisher=|accessdate=11 September 2016}}
A fault was discovered in May 2022, causing a shutdown of operations. Operations are expected to resume in October 2022.{{cite web|url=https://www.statnett.no/for-aktorer-i-kraftbransjen/nyhetsarkiv/norned-kabelen-forventes-i-drift-igjen-fra-august/ |title=NorNed-kabelen forventes i drift igjen fra august |trans-title=The NorNed cable is expected to be in operation again from August |website=Statnett |language=no|accessdate=2022-08-14}}{{cite web |last1=Pedersen |first1=Ole Petter |last2=Lingjærde |first2=Magnus |title=Feilen ligger bare 30 meter fra land: Unik utenlandskabel nede i minst fem måneder {{!}} Europower |trans-title=The fault is only 30 meters from shore: Unique foreign cable down for at least five months {{!}} Europower |url=https://www.europower-energi.no/nett/feilen-ligger-bare-30-meter-fra-land-unik-utenlandskabel-nede-i-minst-fem-maneder/2-1-1285021 |website=Europower {{!}} Siste nyheter fra fornybarbransjen |language=no |date=31 August 2022}}
Technology
Although classed as a "bipolar" HVDC scheme, the NorNed scheme is unusual for a Line-Commutated (thyristor-based) HVDC scheme since there is just one 12-pulse converter at each end of the scheme, midpoint-grounded at Eemshaven. With voltage-source converter-based HVDC systems, this arrangement with the two high voltage cables at equal and opposite voltages but only a single converter at each end is referred to as a Symmetrical monopole.
Consequently, with a DC voltage of ±450 kV, the converter for the NorNed project has a terminal to terminal DC voltage rating of 900 kV, making it (as of 2012) the highest voltage rating of any HVDC converter in the world. The connection has a loss of 4.2% (95.8% efficiency).Skog et al. [https://library.e.abb.com/public/22d1dc6a2e72fa27c1257dea00357f41/NorNed%20HVDC%20link%20-%20Worlds%20longest%20power%20cable.pdf NorNed – World’s longest power cable] page 10
Sites
class="wikitable sortable"
! Site | Coordinates |
Eemshaven Converter Station | {{Coord|53|26|4|N|6|51|57|E|type:landmark|name=NorNed - Eemshaven Converter Station}} |
Feda Converter Station | {{coord|58|16|58|N|6|51|55|E|type:landmark|name=NorNed - Feda Converter Station}} |
Trading mechanism
NorNed is the first power link between the Nordic electrical transmission system Nordel and the continent that is planned to be open to the power market. The main trading over the link is presumed to be one day ahead spot market trading based on the price difference between the markets. In spite of quite equal average spot market prices, the hour-by-hour differences are quite significant most of the time. The way the power exchanges will be compensated was to be agreed, and the direct net income from the trade is to be shared 50/50 between TenneT and Statnett.{{cite web|url= https://www.researchgate.net/publication/228996442 |title=The Norned HVDC cable link–A power transmission highway between Norway and The Netherlands |website=researchgate.net |accessdate=26 January 2018}}
See also
{{Portal|Netherlands|Norway|Energy}}
- Dutch cables: BritNed, COBRAcable
- List of high-voltage transmission links in Norway
- Proposed: NorGer, Scotland-Norway interconnector
- Others: Basslink - second longest submarine power cable.
- Renewable energy in Norway
- Renewable energy in the Netherlands
References
{{reflist|refs=
{{cite press release
|title = NorNed auction expected to start Monday May 5
|publisher = TenneT
|date = 2008-04-28
|url = http://www.tennet.org/english/tennet/news/NorNed_Verwachte_start_NorNed_Auction_maandag_5_mei.aspx
|accessdate = 2008-05-05
|url-status = dead
|archiveurl = https://web.archive.org/web/20110728090502/http://www.tennet.org/english/tennet/news/NorNed_Verwachte_start_NorNed_Auction_maandag_5_mei.aspx
|archivedate = July 28, 2011
}}
{{cite press release
|title = NorNed cable off to a promising start
|publisher = TenneT
|date = 2008-07-09
|url = http://www.tennet.org/english/tennet/news/veelbelovende_start_voor_nornedkabel.aspx
|accessdate = 2008-07-21
|url-status = dead
|archiveurl = https://web.archive.org/web/20080828080208/http://www.tennet.org/english/tennet/news/veelbelovende_start_voor_nornedkabel.aspx
|archivedate = August 28, 2008
}}
{{cite press release
|title = Marketcoupling on NorNed-cable
|publisher = TenneT
|date = 2011-01-12
|url = http://www.tennet.org/english/projects/news/marktkoppelinguitgebreidmetnornedkabel.aspx
|accessdate = 2011-01-15
|url-status = dead
|archiveurl = https://web.archive.org/web/20110728091056/http://www.tennet.org/english/projects/news/marktkoppelinguitgebreidmetnornedkabel.aspx
|archivedate = July 28, 2011
}}
}}
External links
{{GeoGroup}}
- [https://web.archive.org/web/20070625104411/http://www.statnett.no/default.aspx?ChannelID=1408 The NorNed Project (Statnett website)]
- [https://web.archive.org/web/20061007135724/http://www.tennet.nl/english/tennet/publications/corporate_brochures/norned.aspx The NorNed Project (TenneT website)]
- [https://web.archive.org/web/20060211122257/http://www.abb.com/global/gad/gad02181.nsf/0/8c5558c304d0eb13c1256f77003a33a1?OpenDocument The NorNed Project (ABB website)]
- [https://www.4coffshore.com/transmission/interconnector-norned-icid22.html 4c page]
- [https://www.nordpoolgroup.com/Market-data1/Power-system-data/Exchange1/NO/Hourly2/?dd=NO%20-%20NL&view=table Weekly exchange] (Nord Pool data)
Category:Electrical interconnectors to and from the Nordic grid
Category:Electrical interconnectors to and from the Synchronous Grid of Continental Europe
Category:Electric power infrastructure in Norway
Category:Electric power infrastructure in the Netherlands
Category:Energy infrastructure completed in 2008
Category:HVDC transmission lines
Category:Netherlands–Norway relations
Category:Electrical interconnectors in the North Sea