Northern Busway, Auckland

{{Short description|Busway in Auckland, New Zealand}}

{{Use New Zealand English|date=April 2024}}

{{Use dmy dates|date=May 2019}}

{{Infobox rail line

| color =

| logo =

| box_width =

| name = Northern Busway

| image = Northern Busway Auckland.jpg

| image_width = 300px

| caption = The Northern Busway (right) adjacent to Akoranga station

| type = Bus rapid transit

| system = AT Buses

| status = Open

| locale = North Shore, Auckland

| start = Albany (Busway lanes), Hibiscus Coast (Routes on motorway)

| end = Akoranga

| stations = 6

| routes = NX1, NX2, 83, 866

| open = 2008

| lastextension = 2022

| close =

| owner = Auckland Transport

| operator = Ritchies Transport
Tranzit Group (Tranzurban Auckland)

| character =

| stock =

| linelength =

| tracklength =

| gauge =

| speed_km/h = 80

| elevation =

| map = {{Northern Busway, Auckland RDT}}

}}

{{Maplink|frame=yes|type=line}}

The Northern Busway is a segregated busway that runs along the eastern side of the Northern Motorway, part of State Highway 1, in the north of Auckland, New Zealand, linking the North Shore with the northern end of the Auckland Harbour Bridge. As of May 2022, the busway consists of two-way lanes running between Albany Station and Akoranga Station, and from Akoranga Station a southbound-only lane that joins the Harbour Bridge approaches just south of the Onewa Road on-ramp system. The busway previously ended at Constellation before an extension to Albany was constructed in 2022.

Six stations provide access points for passengers to board; some stations have park and ride parking spaces; others have drop off and pick up zones only.

City-bound Northern Express (NX1 and NX2) services commence from Hibiscus Coast Station or Albany Station; from Albany, the lanes reduced travel time to Waitematā station from around one hour by car during peak hours to about half an hour by bus.Rail electrificationRegion Wide, Auckland Regional Council newsletter, June 2007, Page 3 In the reverse direction, NX1 and NX2 services leaving the city travel north to the Akoranga off-ramp, cross over the motorway, and enter Akoranga Station, from where they travel north on the busway lanes. The busway lanes are also an important transport link within the North Shore, where they are the spine of the bus-based public transport system.

History

=Background=

Prior to 2000, indicative scheme and station planning was undertaken by International Transport Planning Consultants (McCormick Rankin International) who were engaged by Serco on behalf of Transit.

In 2000, the North Shore Busway Office was established with a team to focus both on the overall scheme as well as the station components. This reflected the nature of the proposed funding. McCormick Rankin undertook refined schematic design and the Busway Team focused on the community consultation and funding programmes. Original plans included a Northcote Point station proposed for Stafford Road, which Northcote residents lobbied against, and was removed from the plan in December 2000.{{cite news|url=https://www.nzherald.co.nz/nz/locals-halt-busway-station/KOLHOBYIWQLAB4IV3HZDH4G574/ |title=Locals halt busway station |first=Wayne|last=Thompson|website=The New Zealand Herald |date=5 December 2000 |access-date=20 February 2024}}

The ARC held a regional Station Theming Design Competition in 2001 to select a consultant to develop a Theming Manual for application across all major public transport stations to the Auckland Region. This provided a distinctive design signature to the region visually linking all public transport facilities. MARIO MADAYAG/Jasmax Architects were selected as winners for the competition with part of their benefit being their commission on this concept design exercise. The ARC separately engaged MARIO MADAYAG/Jasmax to develop the Theming Manuals within the set parameters of that project. The project ran in parallel with the busway station concept design exercise but was heavily integrated as the pedestrian overbridge, stair lift towers and waiting enclosure developed concepts for the Busway were integrated with the Theming Manual.{{Cite web|url=https://www.scoop.co.nz/stories/AK0110/S00019/transport-network-design-winners-announced.htm?from-mobile=bottom-link-01|title=Transport Network Design Winners Announced |website= Scoop News}}{{Cite web|url=https://www.aucklandcouncil.govt.nz/plans-projects-policies-reports-bylaws/our-plans-strategies/auckland-plan/transport-access/Pages/the-northern-busway.aspx|title=The Northern Busway|first=Auckland|last=Council|website=Auckland Council|access-date=1 March 2020|archive-date=1 March 2020|archive-url=https://web.archive.org/web/20200301013300/https://www.aucklandcouncil.govt.nz/plans-projects-policies-reports-bylaws/our-plans-strategies/auckland-plan/transport-access/Pages/the-northern-busway.aspx|url-status=live}}North Shore Busway Station Concept Design Brief Prepared by BRT Project Team

24 April 2002

File G72 Concept Design

=Concept, design and construction=

File:Aklbusway14.jpg-branded Northern Express service operated by Ritchies Transport in 2008]]

Image:Smales Farm Busway Station Almost Done.jpg

Concept design for the busway was developed by MRCagney (formerly McCormick Rankin Cagney), with detailed design and consultation completed by Mario Madayag Architecture, Jasmax, Beca Group, Opus and Connell Wagner. Fletcher Construction was responsible for construction. Akoranga, Smales Farm, and Sunnynook stations were built by NZ Strong Construction.[http://www.nzstrong.co.nz/portfolio/project/8/ North Shore Busways] {{Webarchive|url=https://web.archive.org/web/20081014051809/http://www.nzstrong.co.nz/portfolio/project/8/|date=14 October 2008}} (from the NZ Strong Construction company website. Accessed 3 March 2008.)

Difficulties encountered included the nearby residential areas, the predominantly soft ground, and environmental efforts to protect New Zealand dotterel breeding grounds. Construction employed around 300 people at its peak, with around a million man-hours being invested, including shifts during 512 nights.Busway bits 'n' piecesRegion Wide, newsletter of the Auckland Regional Council, March 2008, Page 4

A proposed station at Onewa was cancelled after local residents petitioned and protested against the scheme – claiming that it would increase traffic on neighbourhood streets.{{Cite web |title=Locals halt busway station – New Zealand News |url=https://www.nzherald.co.nz/nz/locals-halt-busway-station/KOLHOBYIWQLAB4IV3HZDH4G574/ |access-date=2022-12-28 |website=The New Zealand Herald |language=en-NZ |archive-date=28 December 2022 |archive-url=https://web.archive.org/web/20221228105053/https://www.nzherald.co.nz/nz/locals-halt-busway-station/KOLHOBYIWQLAB4IV3HZDH4G574/ |url-status=live }}{{Cite web |title=U-TURN ON BUS STOP – Aucklander News |url=https://www.nzherald.co.nz/aucklander/news/u-turn-on-bus-stop/CD42YRR4N5NRFYSZ5Q37FCH36I/ |access-date=2022-12-28 |website=The New Zealand Herald |language=en-NZ |archive-date=28 December 2022 |archive-url=https://web.archive.org/web/20221228105045/https://www.nzherald.co.nz/aucklander/news/u-turn-on-bus-stop/CD42YRR4N5NRFYSZ5Q37FCH36I/ |url-status=live }}

=Operation=

The busway was officially opened in February 2008{{cite news|url=http://tvnz.co.nz/view/page/1568832 |title=Multi-million dollar busway opens |date=2 February 2008 |work=Television New Zealand |access-date=1 November 2011 |url-status=dead |archive-url=https://web.archive.org/web/20110516182554/http://tvnz.co.nz/view/page/1568832 |archive-date=16 May 2011 }} after several years of construction, though the Albany and Constellation stations had been operating since December 2005 using the normal Northern Motorway lanes.Northern BuswayThe New Zealand Herald, Saturday 30 June 2007, Page C6 It was credited with reducing peak traffic on the Northern Motorway by around 500 cars each rush hour one month after opening,Busway reduces cars by 500 each rush hourRegion Wide, newsletter of the Auckland Regional Council, March 2008, Page 4 and about 39% of passengers on the Northern Express bus service had never used public transport before. The busway was initially used by 70 buses per hour during peak time.

In 2008, the busway received the 'Shell Bitumen Excellence Award for a Major Roading Project' and the 'Roading New Zealand Supreme Award'.{{cite news |url=http://www.nzherald.co.nz/transport/news/article.cfm?c_id=97&objectid=10528948 |title=Busway wins excellence award |date=26 August 2008 |work=The New Zealand Herald |access-date=1 November 2011 |archive-date=22 May 2011 |archive-url=https://web.archive.org/web/20110522195006/http://www.nzherald.co.nz/transport/news/article.cfm?c_id=97&objectid=10528948 |url-status=live }} In June 2009, it received the Ingenium 'Excellence Award' (in the category for projects above NZ$2 million construction cost).{{cite news |url=http://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=10577100 |title=Northern Busway wins award |date=8 June 2009 |work=The New Zealand Herald |access-date=1 November 2011 |archive-date=20 October 2012 |archive-url=https://web.archive.org/web/20121020181145/http://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=10577100 |url-status=live }}

In June 2010, the busway carried its 5 millionth passenger and was estimated to remove the equivalent of about 5,100 cars in the morning peak, with 80 buses per hour during peak times.{{cite news|title=Like a railway, but with buses |newspaper=Region Wide|date=July 2010|agency=Auckland Regional Council|pages=2}}

By mid-2011, frequency of the Northern Express had risen to every three minutes during the morning peak hour, five minutes during the 'shoulder peak'.{{cite news|title=Keeping our region moving |newspaper=Our Auckland|date=July 2011|agency=Auckland Council}}

In 2015, some Northern Express services were extended to Hibiscus Coast busway station (formerly named Silverdale Park and Ride).{{cite web|url=http://www.stuff.co.nz/auckland/local-news/rodney-times/69897542/new-hibiscus-coast-bus-network-revealed-by-auckland-transport|access-date=23 July 2017|title=New Hibiscus Coast bus network revealed by Auckland Transport|date=7 July 2015|publisher=Stuff |archive-date=28 September 2018|archive-url=https://web.archive.org/web/20180928044330/https://www.stuff.co.nz/auckland/local-news/rodney-times/69897542/new-hibiscus-coast-bus-network-revealed-by-auckland-transport|url-status=live}}

In 2017, Auckland Transport's projections indicated that the busway would reach maximum capacity in 2026, twenty years earlier than originally expected. AT's report said that increased patronage would "manifest in overcapacity conditions and poor operational performances" at Albany, Sunnynook and Akoranga stations. AT was investigating a range of improvements, including lengthening station platforms. A decision on a timeline for conversion of the busway to a rail link was expected to be announced before the end of 2017.{{cite web|url=http://www.stuff.co.nz/business/90423263/Plans-for-rail-line-through-Aucklands-North-Shore-to-be-determined-this-year|access-date=16 July 2017|title=Plans for rail line through Auckland's North Shore to be determined this year|date=14 March 2017|publisher=Stuff |archive-date=15 July 2017|archive-url=https://web.archive.org/web/20170715015602/http://www.stuff.co.nz/business/90423263/plans-for-rail-line-through-aucklands-north-shore-to-be-determined-this-year|url-status=live}} In the 12 months to December 2018, the busway carried nearly 6 million passengers.{{Cite web|url=https://www.greaterauckland.org.nz/2018/11/30/oct-18-ridership/|title=Oct-18 Ridership|date=29 November 2018|website=Greater Auckland|access-date=30 November 2018|archive-date=30 November 2018|archive-url=https://web.archive.org/web/20181130071842/https://www.greaterauckland.org.nz/2018/11/30/oct-18-ridership/|url-status=live}}

In May 2022 the extension of the busway between Constellation and Albany was opened.{{cite web |url=https://www.rnz.co.nz/news/national/466690/auckland-s-northern-busway-extension-opens-today |title=Auckland's Northern Busway extension opens today |website=Radio New Zealand |date=8 May 2022 |access-date=8 May 2022 |archive-date=8 May 2022 |archive-url=https://web.archive.org/web/20220508202236/https://www.rnz.co.nz/news/national/466690/auckland-s-northern-busway-extension-opens-today |url-status=live }}

=Funding=

The busway became fully operational in 2009, with some final sections being completed with little publicity, for around NZ$290–294 million: $210 million for the busway and $84 million for the stations.Following the moneye.nz magazine, IPENZ January/February 2007 The project was funded by Transit New Zealand, ARTA, Auckland City Council and North Shore City Council.

Infrastructure

=Busway=

The busway has two lanes for 6.2 km running parallel with the eastern side of the Northern Motorway from Albany Station to Akoranga Station at the Esmonde Road interchange,Busway the way of the future for North ShoreLG, New Zealand Local Government, May 2007, Volume 43 No 05 from where a one-way southbound bus lane extends a further 2.5 km to south of the Onewa Road interchange, where it merges with the motorway for the Harbour Bridge.Dedicated busway a roaring successLG, New Zealand Local Government, March 2008, Volume 44 No 03

Its use is limited to Auckland Transport approved buses, emergency and maintenance vehicles.[http://www.busway.co.nz/index.php/Home Welcome to the Northern Busway] {{Webarchive|url=https://web.archive.org/web/20071008093048/http://www.busway.co.nz/index.php/Home |date=8 October 2007 }} (from the official project website) Since August 2021, SkyBus no longer operates in Auckland.{{Cite web |title=Auckland Skybus - Shuttle Bus To Auckland Airport {{!}} Heart of the City |url=https://heartofthecity.co.nz/parking-transport/public-transport/skybus-nz#:~:text=The%20SkyBus%20is%20no%20longer,and%20from%20the%20airport,%20here. |access-date=2024-09-09 |website=heartofthecity.co.nz |language=en}} The busway has been designed for possible use by car pools.{{cite web |url=https://at.govt.nz/bus-train-ferry/bus-services/on-the-bus/ |title=On the bus |publisher=Auckland Transport |access-date=22 March 2016 |archive-date=25 March 2016 |archive-url=https://web.archive.org/web/20160325164827/https://at.govt.nz/bus-train-ferry/bus-services/on-the-bus/ |url-status=live }}

=Bus stations=

File:Northern Busway Auckland - Smales Farm Station.jpg

The busway includes six dedicated stations, some with extensive park-and-ride car parks. Feeder bus services serve the stations, allowing transfer.

The stations are (north to south):{{cite map |publisher=NZ Transport Agency |title=Northern Busway Project |url=http://www.busway.co.nz/images/Homepage%20photo.pdf |format=PDF |url-status=dead |scale=1 : 4,000 |access-date=12 August 2014 |archive-url=https://web.archive.org/web/20071008093031/http://www.busway.co.nz/images/Homepage%20photo.pdf |archive-date=8 October 2007}}{{cite web |url=http://www.nzta.govt.nz/projects/sh1-northern-busway/ |title=SH1 Northern Busway |publisher=NZ Transport Agency |access-date=22 March 2016 |archive-date=17 September 2016 |archive-url=https://web.archive.org/web/20160917084432/http://www.nzta.govt.nz/projects/sh1-northern-busway/ |url-status=live }} All stations provide shelters and cycle parking – with glass walls, low planting, night lighting and CCTV to enhance security.[http://www.northshorecity.govt.nz/transport_and_roads/Public-transport/NB-faq.html Frequently Asked Question] {{Webarchive|url=https://web.archive.org/web/20080429213224/http://www.northshorecity.govt.nz/transport_and_roads/Public-transport/NB-faq.html |date=29 April 2008 }} (from the North Shore City Council website. Accessed 21 March 2008.)

==Hibiscus Coast==

Located in Silverdale, this station was originally a park and ride before being converted into a station. It was officially opened as a station in February 2021.{{cite web |title=North Auckland gets public transport upgrade |url=https://www.beehive.govt.nz/release/north-auckland-gets-public-transport-upgrade |website=Beehive |access-date=6 July 2024}} The station has services to Waiwera, Orewa, Gulf Harbour, Manly and, Warkworth.{{Cite web|url=https://at.govt.nz/media/1978035/nn10_warkworth_sep-2018-web.pdf|title=Warkworth Kowhai Coast Northern Bus Timetable|date=30 September 2018|access-date=27 September 2018|archive-url=https://web.archive.org/web/20180928003355/https://at.govt.nz/media/1978035/nn10_warkworth_sep-2018-web.pdf|archive-date=28 September 2018|url-status=dead}}

==Albany==

Located in Albany. The Albany park and ride station was opened in November 2005. It serves as the terminus of some NX1 and NX2 services and all 866 services.{{Cite web |date=2006-12-07 |title=Northern Busway |url=http://www.busway.co.nz:80/index.php/BRT/north_shore/The_stations/Albany |access-date=2022-09-11 |website= |archive-url=https://web.archive.org/web/20061207161647/http://www.busway.co.nz:80/index.php/BRT/north_shore/The_stations/Albany |archive-date=7 December 2006 |url-status=dead}} An extension to the segregated busway from Constellation was opened in 2022.

==Constellation==

Located near Constellation Drive. Construction for a park and ride began in 2003 and was finished in November, 2005.{{Cite web|date=29 April 2008|title=New Zealand's first Park & Ride bus stations open Sunday 04/10/05|url=http://www.northshorecity.govt.nz/your_council/news_releases/releases-05/November/New%20Zealand%E2%80%99s%20first%20Park%20&%20Ride%20bus%20stations%20open%20Sunday.htm|access-date=3 October 2021|archive-url=https://web.archive.org/web/20080429213240/http://www.northshorecity.govt.nz/your_council/news_releases/releases-05/November/New%20Zealand%E2%80%99s%20first%20Park%20&%20Ride%20bus%20stations%20open%20Sunday.htm|archive-date=29 April 2008}}

==Sunnynook==

Located in Sunnynook. Construction began in 2005 and finished in February 2008.{{Cite web |date=14 May 2010 |title=Northern Busway |url=http://www.busway.co.nz/index.php/The_stations/Sunnynook |access-date=29 December 2021 |website= |archive-url=https://web.archive.org/web/20100514231058/http://www.busway.co.nz/index.php/The_stations/Sunnynook |archive-date=14 May 2010 |url-status=dead}}

==Smales Farm==

Located in Takapuna, it has a customer service centre.{{cite web |title=Custom service centres |url=https://at.govt.nz/about-us/contact-us/customer-service-centres |website=Auckland Transport |access-date=7 July 2024}}

==Akoranga==

Akoranga bus station is located in Northcote.{{cite news |title=Man allegedly threatened to shoot and stab Auckland bus passengers |url=https://www.1news.co.nz/2024/07/04/man-allegedly-threatened-to-shoot-and-stab-auckland-bus-passengers/ |access-date=7 July 2024 |work=1News |publisher=TVNZ}}

Image:Aklbusway25.jpg

=Other structures=

Major related structures are the Esmonde Interchange (including large-scale improvements for general traffic) and Tristram Avenue Viaduct, which crosses the often-congested Tristram Avenue via grade separation. The viaduct has 12 spans of 30 m each, with the foundation piles being 1.5 m thick.

The Northern Busway is adjacent to a shared path from Constellation Station to Oteha Valley Road, which opened in 2023.{{cite press release |author= |date=14 April 2023|title=Shared path completes Northern Corridor Improvements project|url=https://www.nzta.govt.nz/media-releases/shared-path-completes-northern-corridor-improvements-project/|agency=Waka Kotahi|access-date=12 May 2025}}

=Electricity transmission cables=

{{main|North Auckland and Northland grid upgrade project}}

Cable ducts were placed beneath the busway during the construction in 2005, to provide for the future installation of electricity transmission cables. The cables installed in these ducts during 2012 and 2013 form part of a major upgrade to the security of supply to North Auckland and Northland.{{cite web |url= http://www.ea.govt.nz/document/6869/download/industry/ec-archive/grid-investment-archive/grid-development-proposals-archive/ige-applications/auckland-cbd-cable-ducts-ige-applications-history/ |title= Transpower 220 kV Auckland CBD Cable Ducts Project |publisher=Transpower |date= 18 May 2006|access-date= 5 April 2012}}{{cite web|url= http://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=10760651|title= $415m cable project to protect power supply|publisher=The New Zealand Herald |date= 21 October 2011|access-date= 31 March 2012|archive-date= 12 March 2016|archive-url= https://web.archive.org/web/20160312101539/http://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=10760651|url-status= live}}

Plans

Image:Aklbusway16.jpg

By 2015, plans were unveiled to extend the busway lanes northwards between Constellation Station to Albany Station.{{cite web|url=http://www.nzta.govt.nz/assets/projects/auckland-northern-corridor/14262-NZTA-Northern-Corridor-Newsletter-web-F.pdf|access-date=18 May 2016|title=Northern Corridor Newsletter – August 2015 21 August 2015|date=21 August 2015|publisher=New Zealand Transport Agency|archive-date=14 February 2016|archive-url=https://web.archive.org/web/20160214200852/http://www.nzta.govt.nz/assets/projects/auckland-northern-corridor/14262-NZTA-Northern-Corridor-Newsletter-web-F.pdf|url-status=live}} This was completed in 2022.

An extension towards Orewa in the north is being debated for the long-term future. It was originally expected to cost around NZ$500 million, although the success of the scheme has now sparked potentially more extensive schemes for between NZ$700 million and NZ$1.2 billion to at least Silverdale, with up to five tunnels and seven bridges, including a motorway flyover between Constellation and Albany stations. Plans in 2008 included additional stations at Rosedale and Redvale.{{cite news |url=http://www.nzherald.co.nz/transport/news/article.cfm?c_id=97&objectid=10542723 |title=Buzzing busway could get even bigger |author=Dearnaley, Mathew |date=13 November 2008 |work=The New Zealand Herald |access-date=1 November 2011 |archive-date=23 May 2011 |archive-url=https://web.archive.org/web/20110523065757/http://www.nzherald.co.nz/transport/news/article.cfm?c_id=97&objectid=10542723 |url-status=live }}

In December 2017, plans were released for a $70 million station at Rosedale, situated between the Albany and Constellation stations. The station would be sited on Arrenway Drive with platforms extending across Rosedale Road for bus transfers to other routes. A construction start date of mid-2019 and opening in 2021 were proposed.{{cite web|url=https://www.stuff.co.nz/auckland/99674195/businesses-students-to-benefit-from-new-bus-station-on-aucklands-northern-busway|access-date=13 December 2017|title=Businesses, students to benefit from new bus station on Auckland's Northern Busway|date=8 December 2017|publisher=Stuff |archive-date=13 December 2017|archive-url=https://web.archive.org/web/20171213142052/https://www.stuff.co.nz/auckland/99674195/businesses-students-to-benefit-from-new-bus-station-on-aucklands-northern-busway|url-status=live}} Resource consent was granted in 2020 and construction of the new station is expected to begin in late 2024.{{cite web|url=https://at.govt.nz/projects-roadworks/rosedale-busway-station|access-date=16 May 2024|title=BRosedale Busway Station|publisher=Auckland Transport}}

=Conversion to rail-based transit=

{{main|North Shore Line, New Zealand}}

The Northern Busway's usage is tracking towards capacity being reached by 2030. Auckland Transport have studied the future mass transit needs for the North Shore, with light rail being determined the most flexible mode compared to other rail-based options.{{cite web|url=https://at.govt.nz/projects-roadworks/north-shore-rapid-transit-network/|title=North Shore rapid transit network|website=Auckland Transport|access-date=15 June 2019|archive-date=16 February 2019|archive-url=https://web.archive.org/web/20190216125222/https://at.govt.nz/projects-roadworks/north-shore-rapid-transit-network/|url-status=live}}

See also

  • Eastern Busway, Auckland
  • Other busway systems
  • Ritchies Transport, contracted operator of NX1, 83, and 866 services{{cite web |title=Bus Route |url=https://data-atgis.opendata.arcgis.com/datasets/ATgis::bus-route/explore |website=Auckland Transport Open GIS Data |access-date=19 November 2024 |language=en-nz}}
  • Tranzurban Auckland, contracted operator of NX2 services{{cite web|url=http://auckland.tranzurban.co.nz/about-us|title=About Us {{!}} Tranzurban|year=2018|publisher=Tranzurban|access-date=2 October 2018|quote=Tranzurban is the newest addition to Tranzit Group and will operate a part of the new North Shore bus network from September 2018 in collaboration with Auckland Transport.|archive-date=23 July 2018|archive-url=https://web.archive.org/web/20180723122726/http://auckland.tranzurban.co.nz/about-us|url-status=live}}

References

{{Reflist}}