Northern Spire Bridge
{{Use dmy dates|date=April 2022}}
{{Infobox bridge
|fetchwikidata = ALL
|lanes = 4
|design = Cable-stayed bridge
|pierswater = 1
|begin = May 2015
|complete = 2018
}}
The Northern Spire Bridge is a bridge over the River Wear in Sunderland, Tyne and Wear, England. The crossing opened to pedestrians on 28 August 2018, before opening to traffic the next day. A two span cable-stayed structure, construction began in May 2015, overseen by Farrans Construction and Victor Buyck Steel Construction.
A crossing had been proposed as early as 2005, however financial uncertainties caused significant delay until funding was approved by HM Treasury. Originally an ambitious design was selected, but was later dropped after several contractors withdrew.{{cite news |url=https://www.sunderlandecho.com/news/next-step-in-road-to-iconic-wear-bridge-1-1055925 |title=Next step in road to iconic Wear bridge |last=Hoyland |first=Trevor |date=2008-12-01 |newspaper=Sunderland Echo |publisher=Johnston Press |issn=0963-8997 |access-date=2009-10-08 |df=dmy-all}} In 2014, the project switched to a cheaper cable-stayed design.
Specifications
The bridge has been constructed to the west side of the city over the River Wear, with the purpose of reducing traffic congestion.{{cite web |url=http://www.sunderlandarc.co.uk/regeneration-projects-moredetails.aspx?id=8 |title=Regeneration projects: SSTC |publisher=Sunderland Arc |access-date=2009-10-08 |df=dmy-all}} It was designed by Spence Associates in partnership with structural engineering firm Techniker.{{cite news |url=http://www.journallive.co.uk/north-east-news/todays-news/2008/11/20/landmark-wear-bridge-to-be-sunderland-s-symbol-61634-22298878/ |title= Landmark Wear bridge to be Sunderland's symbol |last=James |first=Paul |date=2008-11-20 |work=The Journal |location=Newcastle upon Tyne |publisher=Trinity Mirror |access-date=2009-10-08 |df=dmy-all}} The bridge was first designed in 2005, but it was kept confidential for several years by the City Council to avoid a rise in expectations until funding was secured. The council was also considering plans for a cheaper, basic beam bridge design.{{cite news|url=http://www.architectsjournal.co.uk/spence-associates-wear-bridge-comes-face-to-face-with-basic-rival/1846083.article|title=Spence Associates' Wear Bridge comes face to face with 'basic' rival|last=Vaughan |first=Richard |date=2008-09-12 |work=Architects' Journal |publisher=Metropolis International |location=London |issn=0003-8466 |access-date=2009-10-08 | df=dmy-all}} The cost of the Spence design was estimated at £133 million for the bridge and the associated approaches and roadworks.{{cite web |url=http://www.sunderland.gov.uk/newbridge/ |title=A new bridge for Sunderland | website=Sunderland City Council |access-date=2009-11-15 |url-status=dead |archiveurl=https://web.archive.org/web/20091118050641/http://www.sunderland.gov.uk/newbridge/ |archivedate=2009-11-18 |df=dmy-all}}
The crossing forms part of the regeneration plan produced by Sunderland Arc, whose aim was to use the bridge as part of a Sunderland Strategic Transport Corridor to improve transport links and to improve the city's image. In 2017, following a public consultation and vote, the crossing was named the Northern Spire Bridge out of three shortlisted names.{{Cite web|url=https://www.worldhighways.com/wh10/news/englands-new-sunderland-bridge-renamed-northern-spire|title=England’s new Sunderland Bridge renamed Northern Spire {{!}} World Highways|website=www.worldhighways.com|access-date=2020-02-01}}
Background and history
In 2003, the urban regeneration company, Sunderland Arc commissioned the engineering firm Arup to assist with finding a suitable location for the siting of a new road bridge over the River Wear. In 2004, the Canadian-American Architect Frank Gehry undertook a study for this new river crossing. An international design competition was organised by Sunderland Arc in 2005. Several submissions were made, including one by Frank Gehry, but it was the cable-stayed design of Spence Associated that won.{{Cite web|url=https://www.architectsjournal.co.uk/news/spence-associates-iconic-wear-bridge-comes-face-to-face-with-basic-rival/1845929.article|title=Spence Associates' 'iconic' Wear Bridge comes face to face with 'basic' rival|last=Vaughan|first=Richard|website=Architects Journal|language=en|access-date=2020-02-01}}
In 2008, Sunderland City Council held a public consultation on the designs to see if the public would prefer the Spence design to a more basic beam bridge.{{cite web |url=http://www.sunderland.gov.uk/newbridge/ |title=A new bridge for Sunderland | publisher=Sunderland City Council |access-date=2009-10-08 |url-status=dead |archiveurl=https://web.archive.org/web/20091118050641/http://www.sunderland.gov.uk/newbridge/ |archivedate=2009-11-18 |df=dmy-all}} The consultation showed that people in the Sunderland area were in favour of the Spence design.{{cite web |url=http://www.sunderland.gov.uk/showFeature.asp?Feature=152 |archive-url=http://webarchive.nationalarchives.gov.uk/20100104193959/http://www.sunderland.gov.uk/showFeature.asp?Feature=152 |url-status=dead |archive-date=2010-01-04 |title=New Wear Bridge Decision |publisher=Sunderland City Council |access-date=2009-10-08 |df=dmy-all}}{{cite web |url=http://www.sunderlandarc.co.uk/regeneration-projects-news.aspx?id=294&project=8 |title=Communities give their bridge views |date=2009-07-10 |publisher=Sunderland Arc |access-date=2009-10-08 |df=dmy-all}} The council decided to back the Spence design and abandon the cheaper beam bridge option.{{cite news |url=http://www.nce.co.uk/council-backs-iconic-wear-bridge-despite-the-expense/1935232.article|title=Council backs iconic Wear bridge despite the expense |date=2008-11-26 |work=New Civil Engineer |publisher=Metropolis International |issn=0307-7683 |access-date=2009-10-08 |df=dmy-all}} They justified their decision on the grounds that the more ambitious design would attract more businesses to the city and thus create more jobs.{{cite news |url=http://news.bbc.co.uk/1/hi/england/wear/8235463.stm |title=Bridge will be England's tallest |date=2009-09-03 |work=BBC News |publisher=BBC|access-date=2009-10-08 |df=dmy-all}} The United Kingdom government then announced a contribution of £93 million towards construction{{cite web |url=http://www.sunderlandarc.co.uk/regeneration-projects-news.aspx?id=258&project=8 |title=Funding for new Wear crossing approved |date=2008-07-31 |publisher=Sunderland Arc |access-date=2009-10-08 |df=dmy-all}} and the regional development agency One NorthEast pledged another £8.5 million, with the council funding the remaining £23 million required.{{cite news |url=https://www.sunderlandecho.com/news/163-133m-iconic-bridge-a-step-closer-1-1069786 |title=£133m iconic bridge a step closer| date=2009-09-03 |newspaper=Sunderland Echo |publisher=Johnston Press |issn=0963-8997 |access-date=2009-10-08 |df=dmy-all}}
The decision to build the Spence design became official Sunderland City Council policy on 9 September 2009.{{cite news |url=https://www.sunderlandecho.com/news/people-s-bridge-gets-the-go-ahead-1-1070240 |title='People's bridge'gets the go-ahead |last=Robertson |first=Ross |date=2009-09-10 |newspaper=Sunderland Echo |publisher=Johnston Press |issn=0963-8997 |access-date=2009-10-08 |df=dmy-all}} In November 2009, public notices on the compulsory purchase of land and new rights for the project were published including side roads orders and bridge schemes notices, made under the Highways Act 1980.{{cite web |url=http://www.sunderland.gov.uk/newbridge |title=New Wear Bridge |publisher=Sunderland City Council |access-date=2009-11-06 |df=dmy-all}} An official planning application{{cite web|url=http://www.sunderland.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=KUE32ABB00P00|title=09/04661/LAP Planning Application |work=Sunderland City Council |access-date=2009-12-07 |df=dmy-all}} was placed with Sunderland City Council on 7 December 2009 with a consultation expiry date of 29 October 2010. Construction was timetabled to start around 2012.{{cite news |url=http://www.newstartmag.co.uk/news/article/striking-design-for-new-wear-bridge/ |title=Striking design for new Wear bridge |date=2009-07-10 |work=New Start |access-date=2009-10-08 |df=dmy-all}}
On 26 May 2010, Sunderland City Council approved the planning application and the project appeared ready to go ahead. However, by July 2013 construction still had not begun, due to difficulty in producing the design at the approved funding level; several contractors withdrew from the project.{{cite news |url=http://www.sunderlandecho.com/news/business/sunderland-city-council-scraps-plan-to-build-118million-bridge-across-the-wear-1-5838811 |title=Sunderland City Council scraps plan to build £118million bridge across the Wear |date=2014-07-14 |access-date=2014-08-08 |df=dmy-all |newspaper=Sunderland Echo |publisher=Johnston Press |issn=0963-8997}} This led to a reassessment of the design, which dropped the Spence plan in favour of a simpler cable-stayed design.{{cite news |url=http://www.sunderlandecho.com/news/how-the-new-118m-sunderland-bridge-might-look-1-6646336|title=How the new £118m Sunderland bridge might look |date=2014-05-04 |access-date=2014-08-08 |df=dmy-all |newspaper=Sunderland Echo |publisher=Johnston Press |issn=0963-8997}}
Roughan & O’Donovan and BuroHappold Engineering delivered the preliminary and detailed design of the bridge with Yee Associates as architectural consultants.{{cite book|first=Ronald|last=Yee|title=The architecture of Britain's Bridges|location=Marlborough|publisher=Crowood Press|year=2021|isbn=978-1-78500-794-1|pages=158-9}}
Between 10 and 11 February 2017, the central A-frame pylon (fabricated in Ghent, Belgium by Victor Buyck Steel Construction){{Cite web|url=https://www.worldhighways.com/wh10/news/englands-new-sunderland-bridge-renamed-northern-spire|title=England’s new Sunderland Bridge renamed Northern Spire {{!}} World Highways|website=www.worldhighways.com|access-date=2020-02-01}}{{Cite web|url=https://www.sunderland.gov.uk/article/14612/Timetable|title=Timetable - Sunderland City Council|website=www.sunderland.gov.uk|access-date=2020-02-01}} was installed which stands at a height of {{cvt|105|m}}, making it the tallest structure in Sunderland.
The raising of the single bridge pylon marked the culmination of two years of design and planning, as well as twelve months of fabricating.
Gallery
File:Sunderland New Bridge Construction.jpg|The site of the Northern Spire in 2010
File:New Wear Crossing Pylon Lifting.jpg|The spire being raised in 2017
File:Dl7cJjSXoAAGbPz.jpg|Walking across the bridge
File:Dl7cNCfX0AAilSM.jpg|Looking up towards the spire
{{commons category}}
References
{{reflist|30em}}
{{River item box
|River = River Wear
|upstream = Hylton Viaduct
|downstream = Queen Alexandra Bridge
|type = bridge
|thisis =
|upsub = {{UK road|A19}}
|downsub = {{UK road|B1539}}
|location = NZ369581
}}
{{City of Sunderland}}
Category:Tourist attractions in the City of Sunderland
Category:Bridges across the River Wear
Category:Bridges in Tyne and Wear
Category:Transport in the City of Sunderland