Permissive Working
Image:Rail-semaphore-signal-Dave-F.jpg
Permissive Working{{cite book|author=UK Rulebook - Permissive Working|title=GE/RT8000 Rule Book Module TW1 (Train Working) Section 20|url=https://www.rssb.co.uk/rgs/rulebooks/GERM8000-master-module%20Iss%201.pdf}} on a railway in the United Kingdom allows more than one train at a time to be on the same line in a block section, a signal section or a dead-end platform line.
Authorisation
The areas where Permissive Working is allowed are given in Table A of the Network Rail Sectional Appendix.
Exceptions
Even where it is not authorised, a shunting movement can be allowed to enter a portion of line that is already occupied providing that it is for the purpose of:
- attaching vehicles
- detaching vehicles
- removing vehicles.
Driving towards another train
When it is permitted to drive a train towards the rear of another train, such as where trains queue to enter or exit a depot, the driver must:
- proceed with caution
- not pass a signal which has been cleared for the train in front until it has been replaced to danger and then cleared for their movement.