Pink Line (Delhi Metro)#Extension
{{Short description|Line on the Delhi Metro system}}
{{Use Indian English|date=January 2016}}
{{Use dmy dates|date=January 2016}}
{{Infobox rail line
| color = {{rail color|Delhi Metro|Pink}}
| box_width =
| name = Pink Line
(Line 7)
| image = The rear of a Hyundai-Rotem coach of Delhi Metro's Pink Line at Anand Vihar metro station.jpg
| caption = Pink Line near Anand Vihar Station
| type = Rapid Transit
| system = Delhi Metro
| status = Operational
| locale = Delhi
| start = Majlis Park
| end = Shiv Vihar
| stations = 38
| daily_ridership =
| open = *14 March 2018 (Majlis Park – Durgabai Deshmukh South Campus)
- 6 August 2018 (Durgabai Deshmukh South Campus – Lajpat Nagar)
- 31 October 2018 (Trilokpuri Sanjay Lake – Shiv Vihar)
- 31 December 2018 (Lajpat Nagar – Mayur Vihar Pocket I)
- 6 August 2021 (Trilokpuri Sanjay Lake – Mayur Vihar Pocket I)
- 2025 (Majlis Park – Jagatpur Village)
| close =
| owner = Delhi Metro
| operator = Delhi Metro Rail Corporation
| character = Underground and Elevated
| stock = Hyundai-ROTEM
| linelength = {{convert|59.24|km|mi|abbr=on }}
| tracklength =
| tracks =
| gauge = {{track gauge|sg|allk=on}}
| electrification = {{25 kV 50 Hz}} overhead catenary
| speed =
| elevation =
| map = {{Delhi Metro Pink Line Route}}
| map_state = expanded
}}
The Pink Line (Line 7) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India.{{Cite news|url=https://timesofindia.indiatimes.com/city/delhi/metro-comes-to-ne-delhi-but-it-wont-be-straight-line/articleshow/66421712.cms|title=Metro comes to north-east Delhi, but it won't be straight line| website=Times of India|date=30 October 2018 }} It consists of 38 metro stations from Majlis Park to Shiv Vihar, both in North Delhi.
At {{convert|59.24|km|mi}}, the Pink Line is the longest individual line in the Delhi Metro and in India, exceeding the length of the operational Blue Line (excluding its branch line). It is mostly elevated and covers Delhi in an almost U-shaped pattern. The Pink Line is also known as the Ring Road Line, as the line passes alongside the Ring Road in Delhi.
The Pink Line has interchanges with most of the operational lines of the network, such as the Red Line at Netaji Subhash Place & Welcome, Yellow Line at Azadpur & Dilli Haat - INA, Green Line at Punjabi Bagh West, Blue Line at Rajouri Garden, Mayur Vihar Phase-I, Anand Vihar & Karkarduma, Dhaula Kuan of Airport Express (Orange Line) at Durgabai Deshmukh South Campus, Violet Line at Lajpat Nagar, as well as with Hazrat Nizamuddin and Anand Vihar Terminal (Indian Railways) and the ISBTs at Anand Vihar and Sarai Kale Khan.
The Pink Line has the highest point of the Delhi Metro at Dhaula Kuan with a height of {{Convert|23.6|m}}, passing over the Dhaula Kuan grade separator flyovers and the Airport Express Line.{{cite web|url=http://indianexpress.com/article/cities/delhi/new-high-for-metro-with-track-at-24m/|title=New high for Metro with track at 24m|date=26 September 2014|work=The Indian Express}} It also possesses the country's smallest metro station, Ashram, with a size of just {{Convert|151.6|m}} against the usual {{Convert|265|m}}.{{cite book |last=Dayal |first=Anuj |author-link= |date=5 April 2018 |title=Delhi Metro - Phase 3 Challenges |location=New Delhi |publisher=Delhi Metro Rail Corporation}}{{rp|93}} Also, the platform for a six-coach train is {{Convert|140|m|4=0}} but has been reduced to {{Convert|135|m}} in the Ashram station.
The line will be extended to Maujpur - Babarpur, creating one of the world's longest ring lines in the city. The Maujpur - Babarpur to Shiv Vihar section will then act as a branch line. The extension is expected to be completed by March 2025.{{Cite web |date=2023-11-05 |title=First section of Delhi Metro phase-IV to open by July 2024, says DMRC chief |url=https://www.timesnownews.com/delhi/first-section-of-delhi-metro-phase-iv-to-open-by-july-2024-says-dmrc-chief-article-104978294 |access-date=2023-11-24 |website=TimesNow |language=en}}
History
The total length of the line is {{convert|59.24|km|mi}}.{{Cite web|title=Delhi Metro Map|url=http://www.delhimetrorail.com/Zoom_Map.aspx|access-date=2021-08-06|website=www.delhimetrorail.com}} There are 38 stations in the Pink Line, out of which 26 are elevated and 12 are underground.
The line was opened in five stages from March 2018 to August 2021. The first section on the Pink Line become operational from 14 March 2018 between Majlis Park to Durgabai Deshmukh South Campus, thereafter the section between Durgabai Deshmukh South Campus and Lajpat Nagar was opened on 6 August 2018, Shiv Vihar to Trilokpuri was opened on 31 October 2018. The section between Lajpat Nagar to Mayur Vihar Pocket I was opened on 31 December 2018.
The section between Trilokpuri Sanjay Lake and Mayur Vihar Pocket I was not completed as construction of a {{Cvt|1.5|km}} viaduct began late due to land acquisition issues at Trilokpuri.{{Cite web|url=https://timesofindia.indiatimes.com/city/delhi/missing-link-at-mayur-vihar-1-in-metros-longest-line-finally-set-to-be-bridged/articleshow/64022099.cms|title=Delhi Metro: Missing link at Mayur Vihar-1 in Metro's longest line finally set to be bridged |date=May 4, 2018|first=Sidharatha |last=Roy |website=The Times of India|language=en|access-date=2019-05-28}} This had rendered the Pink Line into two independent lines. Trains from Majlis Park would terminate at Mayur Vihar Pocket 1, while trains coming from Shiv Vihar would terminate at either IP Extension or Trilokpuri Sanjay Lake.
The final section between Trilokpuri Sanjay Lake and Mayur Vihar Pocket I was opened on 6 August 2021.{{Cite news|date=2021-08-06|title=Delhi Metro Pink Line's Trilokpuri Sanjay Lake-Mayur Vihar Pocket-1 stretch inaugurated|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/cities/Delhi/delhi-metro-pink-lines-trilokpuri-sanjay-lake-mayur-vihar-pocket-1-stretch-inaugurated/article35759836.ece|access-date=2021-08-06|issn=0971-751X}}
Stations
{{main|List of Delhi Metro stations}}
The stations of the Pink Line are:{{cite web |url=http://www.delhimetrorail.com/Phase-III_documetnt/pdf/61PH-III_DMRC_-Model.pdf |title=Metro Network Phase I, II, III & NCR |publisher=Delhi Metro Rail Corporation Ltd (DMR) |date=February 2015 |access-date=2015-06-28}}
class="wikitable" style="text-align: center;" width="100%"
! colspan="10" style="background:#{{rail color|Delhi Metro|Pink}};" | Pink Line | ||||
rowspan="2" |#
! colspan="2" |Station Name ! rowspan="2" |Opening ! rowspan="2" |Interchange Connection ! rowspan="2" |Station Layout ! rowspan="2" |Platform Layout | ||||
---|---|---|---|---|
English
!Hindi | ||||
1
|{{stl|Delhi Metro|Maujpur - Babarpur}} |मौजपुर - बाबरपुर |2026 |{{rcb|Delhi Metro|Pink|croute}} |Elevated |Side | ||||
2 | {{stl|Delhi Metro|Yamuna Vihar}}
|यमुना विहार |2026 |None |Elevated |Side | |||
3 | {{stl|Delhi Metro|Bhajanpura}}
|भजनपुरा |2026 |None |Elevated |Side | |||
4 | {{stl|Delhi Metro|Khajuri Khas}}
|खजूरी ख़ास |2026 |None |Elevated |Side | |||
5
|{{stl|Delhi Metro|Sonia Vihar}} |सोनिया विहार |2026 |None |Elevated |Side | ||||
6
|सूरघाट |2026 |None |Elevated |Side | ||||
7 | {{stl|Delhi Metro|Jagatpur Village}}
|जगतपुर गांव |2025 |None |Elevated |Side | |||
8
|{{stl|Delhi Metro|Jharoda Majra}} |झड़ौदा माजरा |2025 |None |Elevated |Side | ||||
9 | {{stl|Delhi Metro|Burari}}
|बुराड़ी |2025 |None |Elevated |Side | |||
10
|{{stl|Delhi Metro|Majlis Park}} |मजलिस पार्क |14 March 2018 |{{rcb|Delhi Metro|Magenta|croute}} |Elevated |Side | ||||
11
|{{stl|Delhi Metro|Azadpur}} |आज़ादपुर |14 March 2018 |{{rcb|Delhi Metro|Yellow|croute}} |Underground |Island | ||||
12 | {{stl|Delhi Metro|Shalimar Bagh}} | शालीमार बाग़ | 14 March 2018
|None |Underground |Island | |
13
|{{stl|Delhi Metro|Netaji Subhash Place}} |नेताजी सुभाष प्लेस |14 March 2018 |{{rcb|Delhi Metro|Red|croute}} |Underground |Side | ||||
14 | {{stl|Delhi Metro|Shakurpur}} | शकूरपुर | 14 March 2018
|None |Elevated |Island | |
15
|{{stl|Delhi Metro|Punjabi Bagh West}} |पंजाबी बाग़ पश्चिम |14 March 2018 |{{rcb|Delhi Metro|Green|croute}} |Elevated |Side | ||||
16 | {{stl|Delhi Metro|ESI - Basaidarapur}}
|ईएसआई - बसईदारापुर |14 March 2018 |None |Elevated |Side | |||
17
|{{stl|Delhi Metro|Rajouri Garden}} |राजौरी गार्डन |14 March 2018 |{{rcb|Delhi Metro|Blue|croute}} |Elevated |Side | ||||
18 | {{stl|Delhi Metro|Mayapuri}} | मायापुरी | 14 March 2018
|None |Elevated | Side | |
19 | {{stl|Delhi Metro|Naraina Vihar}} | नारायणा विहार | 14 March 2018
|None |Underground | Island | |
20 | {{stl|Delhi Metro|Delhi Cantonment}} | दिल्ली छावनी | 14 March 2018
|None |Elevated | Side | |
21
|{{stl|Delhi Metro|Durgabai Deshmukh South Campus}} |दुर्गाबाई देशमुख साउथ कैम्पस |14 March 2018 |{{rcb|Delhi Metro|Airport Express|croute}} |Elevated |Side | ||||
22 | {{metro|Sir Vishweshwaraiah Moti Bagh | Sir M. Vishweshwaraiah Moti Bagh}} | सर एम. विश्वेश्वरय्या मोती बाग़ | 6 August 2018
|None |Elevated | Side |
23 | {{stl|Delhi Metro|Bhikaji Cama Place}} | भीकाजी कामा प्लेस | 6 August 2018
|None |Underground | Island | |
24 | {{stl|Delhi Metro|Sarojini Nagar}} | सरोजिनी नगर | 6 August 2018
|None |Underground | Island | |
25
|{{stl|Delhi Metro|Dilli Haat - INA}} |दिल्ली हाट - आईएनए |6 August 2018 |{{rcb|Delhi Metro|Yellow|croute}} |Underground |Island | ||||
26 | {{stl|Delhi Metro|South Extension}} | साउथ एक्सटेंशन | 6 August 2018
|None |Underground | Island | |
27
|{{stl|Delhi Metro|Lajpat Nagar}} |लाजपत नगर |6 August 2018 |{{rcb|Delhi Metro|Violet|croute}} |Underground |Island | ||||
28 | {{stl|Delhi Metro|Vinobapuri}} | विनोबापुरी | 31 December 2018
|None |Underground | Island | |
29 | {{stl|Delhi Metro|Ashram}} | आश्रम |आश्रम | 2018 June |31 December 2018
|None |Underground | Island | |
30 | {{stl|Delhi Metro|Sarai Kale Khan Nizamuddin}} | सराय काले ख़ान - निज़ामुद्दीन | 31 December 2018
| 25px {{stl|RapidX|Sarai Kale Khan}} |Underground |Island | |
31
|{{stl|Delhi Metro|Mayur Vihar-I}} |मयूर विहार-१ |31 December 2018 |{{rcb|Delhi Metro|Blue|croute}} |Elevated |Side | ||||
32 | {{stl|Delhi Metro|Mayur Vihar Pocket I}} | मयूर विहार पॉकेट १ | 31 December 2018
|None | Elevated |Side | |
33 | {{stl|Delhi Metro|Trilokpuri Sanjay Lake}} | त्रिलोकपुरी संजय झील |त्रिलोकपुरी संजय झील
|31 October 2018 | None
|Elevated |Side | |
34 | {{stl|Delhi Metro|East Vinod Nagar - Mayur Vihar-II}}
|पूर्व विनोद नगर - मयूर विहार-२ |31 October 2018 |None |Elevated |Side | |||
35 | {{stl|Delhi Metro|Mandawali - West Vinod Nagar}}
|मंडावली - वेस्ट विनोद नगर |31 October 2018 |None |Elevated |Side | |||
36 | {{stl|Delhi Metro|IP Extension}} | आईपी एक्सटेंशन | 31 October 2018
|None |Elevated |Side | |
37
|{{stl|Delhi Metro|Anand Vihar}} |आनंद विहार |31 October 2018 |{{rcb|Delhi Metro|Blue|croute}} |Elevated |Side | ||||
38
|{{stl|Delhi Metro|Karkarduma}} |कड़कड़डूमा |31 October 2018 |{{rcb|Delhi Metro|Blue|croute}} |Elevated |Side | ||||
39 | {{stl|Delhi Metro|Karkarduma Court}}
|कड़कड़डूमा कोर्ट |31 October 2018 |None |Elevated |Side | |||
40 | {{stl|Delhi Metro|Krishna Nagar}} | कृष्णा नगर | 31 October 2018
|None |Elevated |Side | |
41 | {{stl|Delhi Metro|East Azad Nagar}} | आज़ाद नगर पूर्व | 31 October 2018
|None |Elevated |Side | |
42
|{{stl|Delhi Metro|Welcome}} |वेलकम |31 October 2018 |{{rcb|Delhi Metro|Red|croute}} |Elevated |Side | ||||
43 | {{stl|Delhi Metro|Jaffrabad}} | जाफ़राबाद | 31 October 2018
|None |Elevated |Side | |
44
|{{stl|Delhi Metro|Maujpur - Babarpur}} |मौजपुर - बाबरपुर |31 October 2018 |{{rcb|Delhi Metro|Pink|croute}} |Elevated |Side | ||||
45 | {{stl|Delhi Metro|Gokulpuri}} | गोकुलपुरी | 31 October 2018
|None |Elevated |Side | |
46 | {{stl|Delhi Metro|Johri Enclave}} | जौहरी एनक्लेव | 31 October 2018
|None |Elevated |Side | |
47 | {{stl|Delhi Metro|Shiv Vihar}} | शिव विहार | 31 October 2018
|None |Elevated |Side |
Train Info
class="wikitable" style="text-align: center"
! style="background: #{{rail color|Delhi Metro|pink}};" colspan="3" |Pink Line |
Rakes
|Hyundai Rotem |Alstom Metropolis |
---|
Train Gauge
| colspan="2" |4 ft {{frac|8|1|2}} in (1,435 mm) standard gauge |
Electrification
| colspan="2" |25 kV, 50 Hz AC through overhead catenary |
Train's Maximum Speed
| colspan="2" |100 km/h |
Train Operation
| colspan="2" |Delhi Metro |
Planned extension
{{anchor | Extension }}
Gokulpuri-Hindon Airport-Arthala Pink Line Extension: In September 2024, the DMRC proposed extending the Pink Line 13 km from Trans-Yamuna North-East Delhi (existing Gokulpuri metro station of pink line ) to the west Ghaziabad (existing Arthala metro station of Red Line) via Hindon Airport connecting 2 existing Red Line metro stations with 10 new Pink Line stations namely Gol Chakkar, DLF, Shalimar Garden, Hindon Airport, Bhopura, Tulsi Niketan, Rajendra Nagar, New Karhaira Colony, Karhaira, and Loni Road Industrial Area.[https://www.timesnownews.com/delhi/new-metro-line-to-connect-north-east-delhi-with-trans-hindon-area-in-ghaziabad-article-113263970 New Metro Line To Connect North-East Delhi With Trans Hindon Area In Ghaziabad], timesnownews.com, 11 Sept 2024.
See also
References
{{reflist}}
External links
{{Commons|Delhi Metro}}
- [http://www.delhimetrorail.com/ Delhi Metro Rail Corporation Ltd. (Official site)]
- [http://www.delhimetrorail.com/annual_report.aspx/ Delhi Metro Annual Reports]
- {{cite web|title=Station Information|work=Delhi Metro Rail Corporation Ltd. (DMRC)|url=http://www.delhimetrorail.com/commuters/station_information.html|url-status=dead|archive-url=https://web.archive.org/web/20100619035828/http://delhimetrorail.com/commuters/station_information.html|archive-date=19 June 2010|df=dmy-all}}
- [http://delhimetromaps.com/delhi-metro-pink-line-route-map/ Delhi Metro Pink Line Details] {{Webarchive|url=https://web.archive.org/web/20201003030434/http://delhimetromaps.com/delhi-metro-pink-line-route-map/ |date=3 October 2020 }}
{{Delhi Metro}}
{{Delhi & NCR Metro stations|pink line=yes}}
{{Rapid transit in India}}
{{Rapid transit in Asia}}