Prince Township Wind Farm

{{Infobox power station

| name = Prince Township Wind Farm

| name_official =

| image = Prince wind farm.jpg

| image_size =

| image_caption = A portion of the Prince Twp. wind farm

| image_alt =

| location_map_size =

| location_map_caption =

| coordinates = {{coord|46|37|N|84|28|W|region:CA-ON_type:landmark|display=inline,title}}

| country = Canada

| location = Sault Ste. Marie, Ontario

| status = Operational

| construction_began =

| commissioned = September 2006

| decommissioned =

| cost =

| owner =

| operator =

| ps_units_manu_model =

| wind_hub_height =

| wind_rotor_diameter =

| wind_rated_speed =

| wind_farm_type =

| wind_site_elevation =

| wind_site_usage =

| wind_offshore_depth =

| wind_offshore_distance =

| ps_electrical_capacity = 189 MW

| ps_electrical_cap_fac = 27.2%

| website =

| extra =

}}

Prince Wind Farm is a large wind farm in northern Ontario. Prince Wind Farm is owned by Brookfield Power Prince Wind LP, a subsidiary of Brookfield Power. It is located north of Sault Ste. Marie, Ontario, mostly within the township of Prince but also extending into Unorganized Algoma (Dennis and Pennefather Townships), however it is visible from as far away as Pancake Bay Provincial Park and Whitefish Point. Prince I, 99 MW was completed in September 2006, Prince II, 90 MW, in November 2006. The average capacity factor for the first five full years of operation was 27.2%.

Description

Prince Wind Farm has a footprint of 300 hectares and the total area is over 10,000 hectares.{{Cite web|url=http://www.ssmic.com/UploadedFiles/file/Jim%20Deluzio_Brookfield%20Renewable%20Power%20Clean%20Tech%20March%2031%202010.pdf|title=The Business of Clean Tech|last=|first=|date=March 31, 2010|website=Sault Ste. Marie Innovation Centre|publisher=Brookfield Renewables|access-date=October 10, 2016}}

Main components of the Prince Wind farm:

  • 126 GE SLE 1.5 MW wind turbines
  • 90 kilometers of underground collector cables.
  • 11.2 kilometers of above ground transmission line
  • two electrical substations that step-up the voltage for the grid to 230 kV (Prince 1 TS, Prince 2 TS).
  • One Switching Station (Heyden SS), for interconnection into the Great Lake Power Transmission system.
  • 50 kilometers of access roads.
  • Meteorological towers, used for weather data acquisition. Unlike modern wind farms in Ontario, Prince Wind Farm does not provide met data to the Independent Electricity System Operator(IESO) from its met towers.{{Cite web|url=http://www.ieso.ca/Documents/exemptions/ex_1344_rec.pdf|title=IESO Staff Recommendation to Panel on Exemption Application (General)|last=|first=|date=April 22, 2013|website=IESO|publisher=IESO|access-date=October 10, 2016}}
  • An operations and maintenance building located in west Sault Ste. Marie.

Prince Wind Farm has secured 30 land owner agreements with private land owners and 20 turbines are located on crown land.

Development

Early development for Prince Wind Farm began in 2000, when Brookfield started the environmental assessment process, wind data collection and lease negotiations. Prince Wind Farm was the first wind farm that Brookfield Renewable Power developed and constructed.

Phase I construction begun in September 2005 and achieved commercial operation on September 21, 2006. Phase II begun in January 2006 and achieved commercial operation on November 19, 2006.

class="wikitable sortable"

|+Prince Township Monthly Production (MWh)[http://www.ieso.ca/imoweb/marketdata/windpower.asp Wind Power in Ontario] {{webarchive|url=https://web.archive.org/web/20140810202450/http://www.ieso.ca/imoweb/marketdata/windpower.asp |date=2014-08-10 }}

! Year !! January !! February !! March !! April !! May !! June !! July !! August !! September !! October !! November !! December !! Total

2006140210956244753281445702

! 115359

2007384434351056011344293500021735169123190148743534165012348091

! 478314

2008461093031041186466964194228576216842226534196542024035548562

! 456083

2009282243703648543508274826321134216422617322301426824547740280

! 432582

2010387522730036617414173576125573212753122550264432195939943632

! 454434

2011311434316339289426813491435940184502007235044456364219244710

! 433234

201257502404385759440477361442805315216!

ImageSize = width:1580 height:240

PlotArea = width:1460 height:150 left:50 bottom:40

AlignBars = late

DateFormat = x.y

Period = from:0 till:60

TimeAxis = orientation:vertical

ScaleMajor = unit:month increment:10 start:0

TextData =

pos:(10,220) textcolor:black fontsize:M

text:GWh

pos:(780,25) textcolor:black fontsize:S

text:Month

pos:(680,225) textcolor:black fontsize:M

text:Prince Township Windfarm Output

Colors =

id:blue value:blue

id:red value:red

id:green value:green

id:orange value:orange

id:yellow value:yellow

PlotData=

width:19

bar:Jan

bar:107 color:blue from:0 till:38.44

bar:108 color:red from:0 till:47.11

bar:109 color:green from:0 till:28.22

bar:110 color:orange from:0 till:38.75

bar:111 color:yellow from:0 till:31.14

bar:Feb

bar:207 color:blue from:0 till:43.51

bar:208 color:red from:0 till:30.31

bar:209 color:green from:0 till:37.04

bar:210 color:orange from:0 till:27.30

bar:211 color:yellow from:0 till:43.16

bar:Mar

bar:307 color:blue from:0 till:56.01

bar:308 color:red from:0 till:41.19

bar:309 color:green from:0 till:48.54

bar:310 color:orange from:0 till:36.62

bar:311 color:yellow from:0 till:39.29

bar:Apr

bar:407 color:blue from:0 till:34.43

bar:408 color:red from:0 till:46.70

bar:409 color:green from:0 till:50.83

bar:410 color:orange from:0 till:41.42

bar:411 color:yellow from:0 till:42.68

bar:May

bar:507 color:blue from:0 till:35.00

bar:508 color:red from:0 till:41.94

bar:509 color:green from:0 till:48.26

bar:510 color:orange from:0 till:35.76

bar:511 color:yellow from:0 till:34.91

bar:Jun

bar:607 color:blue from:0 till:21.74

bar:608 color:red from:0 till:28.58

bar:609 color:green from:0 till:21.13

bar:610 color:orange from:0 till:25.57

bar:611 color:yellow from:0 till:35.94

bar:Jul

bar:707 color:blue from:0 till:16.91

bar:708 color:red from:0 till:21.68

bar:709 color:green from:0 till:21.64

bar:710 color:orange from:0 till:21.28

bar:711 color:yellow from:0 till:18.45

bar:Aug

bar:807 color:blue from:0 till:31.90

bar:808 color:red from:0 till:22.26

bar:809 color:green from:0 till:26.17

bar:810 color:orange from:0 till:31.22

bar:811 color:yellow from:0 till:20.07

bar:Sep

bar:907 color:blue from:0 till:48.74

bar:908 color:red from:0 till:34.20

bar:909 color:green from:0 till:22.30

bar:910 color:orange from:0 till:50.26

bar:911 color:yellow from:0 till:35.04

bar:Oct

bar:1007 color:blue from:0 till:53.42

bar:1008 color:red from:0 till:54.20

bar:1009 color:green from:0 till:42.68

bar:1010 color:orange from:0 till:43.22

bar:1011 color:yellow from:0 till:45.64

bar:Nov

bar:1107 color:blue from:0 till:50.12

bar:1108 color:red from:0 till:40.36

bar:1109 color:green from:0 till:45.48

bar:1110 color:orange from:0 till:59.40

bar:1111 color:yellow from:0 till:42.19

bar:Dec

bar:1207 color:blue from:0 till:48.09

bar:1208 color:red from:0 till:48.56

bar:1209 color:green from:0 till:40.28

bar:1210 color:orange from:0 till:43.63

bar:1211 color:yellow from:0 till:44.71

See also

{{stack|{{Portal|Ontario|Weather|Renewable energy}}}}

References

{{Reflist}}