Qimei Power Plant
{{Short description|Power plant in Qimei, Penghu, Taiwan}}
{{Use dmy dates|date=August 2023}}
{{Infobox power station
| name = Qimei Power Plant
| name_official = 七美發電廠
| image = 台灣電力股份有限公司七美發電廠 05.jpg
| image_caption =
| country = Taiwan
| location = Nangang, Cimei, Penghu
| coordinates = {{coord|23|11|37.5|N|119|25|19.8|E|type:landmark_region:TW|display=inline,title}}
| status = O
| construction_began =
| commissioned = 23 July 1998 (unit 1)
30 June 2006 (unit 2)
6 August 2005 (unit 3)
1 July 2001 (unit 4)
| decommissioned =
| cost =
| owner = Taipower
| operator = Taipower
| employees =
| th_fuel_primary = Diesel fuel
| th_fuel_secondary =
| th_fuel_tertiary =
| th_technology =
| ps_site_area =
| ps_site_elevation =
| ps_chimneys =
| ps_cooling_towers =
| ps_cooling_source =
| ps_feed-in_tariff =
| ps_revenue =
| ps_combined_cycle =
| ps_cogeneration =
| ps_iwpp =
| ps_iwpp_technology =
| ps_iwpp_water_output =
| ps_iwpp_water_tariff =
| ps_thermal_capacity =
| ps_units_operational = 4 × 1,000 kW
| ps_units_manu_model =
| ps_units_planned =
| ps_units_cancelled =
| ps_units_uc =
| ps_units_decommissioned =
| ps_electrical_capacity =
| ps_electrical_cap_fac =
| ps_annual_generation =
| ps_storage_capacity =
| website =
}}
The Qimei Power Plant ({{zh|t=七美發電廠|p=Qīměi Fādiànchǎng}}) is a fuel-fired power plant in Nangang Village, Cimei Township, Penghu County, Taiwan. It is the only power plant on Cimei Island.
History
On 20 June 1974, Taiwan Power Company took over a power plant currently operating on the island with a capacity of 2x120 kW. The plant only powered up to a maximum 10 hours per day only. In 1978, the power plant was rebuilt at the current site with a generation capacity of 500 kW using diesel engine. The plant was then able to supply around 13–16 hours of electricity per day to the local residents. In 1981, three units of 500 kW generator were added to the plant to increase its generation capacity. Starting 1 February 1984, the power plant could supply electricity to the local residents for 24 hours a day. Over the years due to the growing demand, the installed 4 units of 500 kW generator became insufficient to keep supplying electricity. Thus, in 1998, 2001 and 2006, the power plant was overhauled to replace its generator from 500 kW to 1,000 kW capacity.{{Cite web|url=http://branch.taipower.com.tw/Content/Messagess/contents.aspx?&SiteID=564766277464050656&MmmID=564766316744053161&MSID=616151203130517771|title = 區營業處首頁|date = 8 April 2014}}[http://www.tri.org.tw/per/76/P12.PDF Document] tri.org.tw {{dead link|date=August 2023}}{{cite web|url=https://www.taipower.com.tw/en/page.aspx?mid=4496|title=Offshore Island Power|website=Taipower|date=15 May 2020|access-date=31 December 2020}}{{cite web|url=https://www.taipower.com.tw/tc/news_noclassify_info.aspx?id=4356&chk=c970daac-216e-4611-a956-e6d2ecc713e6&mid=334¶m|title=七美電廠|website=台灣電力公司|date=September 2020|access-date=1 January 2021|language=zh|trans-title=Qimei Power Plant}}
See also
{{stack|{{Portal|Taiwan|Energy}}}}
References
{{Reflist}}
{{Power plants of Taiwan}}
Category:1974 establishments in Taiwan
Category:Buildings and structures in Penghu County
Category:Energy infrastructure completed in 1974
Category:Oil-fired power stations in Taiwan
{{Taiwan-powerstation-stub}}