Qingshui Geothermal Power Plant
{{Short description|Geothermal power plant in Datong, Yilan County, Taiwan}}
{{Use dmy dates|date=November 2021}}
{{Infobox power station
| name = Qingshui Geothermal Power Plant
| name_official = 清水地熱發電廠
| image = 清水地熱發電廠地熱井.jpg
| image_caption =
| country =
| location = Datong, Yilan County, Taiwan
| coordinates = {{Coord|24|36|44.3|N|121|38|13.1|E|type:landmark_region:TW|display=inline,title}}
| status = O
| construction_began =
| commissioned = 23 November 2021
| decommissioned =
| cost = NT$765 million
| owner = Fabulous Power Co.
| operator = Fabulous Power Co.
| employees =
| geo_type =
| geo_temp_requirement = 180°C
| geo_well_count =
| geo_well_depth = 2,100 m
| geo_water_output =
| ps_site_area =
| ps_site_elevation =
| ps_cooling_towers =
| ps_feed-in_tariff =
| ps_revenue =
| ps_combined_cycle =
| ps_cogeneration =
| ps_thermal_capacity =
| ps_units_operational =
| ps_units_manu_model =
| ps_units_planned =
| ps_units_cancelled =
| ps_units_uc =
| ps_units_decommissioned =
| ps_electrical_capacity = 4.2 MW
| ps_electrical_cap_fac =
| ps_annual_generation =
| ps_storage_capacity =
| website =
}}
The Qingshui Geothermal Power Plant ({{zh|t=清水地熱發電廠|s=清水地热发电厂|first=t|p=Qīngshuǐ Dìrè Fādiànchǎng}}) is a geothermal power plant in Datong Township, Yilan County, Taiwan.
History
In 2017, Fabulous Power Co. won the right to use the land where the plant stands today.{{cite news|last=Oung|first=Angelica|date=22 September 2021|url=https://www.taipeitimes.com/News/biz/archives/2021/09/22/2003764755|title=Geothermal plant in Yilan to come online this month|work=Taipei Times|access-date=1 November 2021}} The construction of the power plant was completed in September 2021 and was approved to be commissioned on 27 October the same year.{{cite news|last=Huang|first=Tzu-li|date=16 November 2021|url=https://www.taiwannews.com.tw/en/news/4346869|title=Taiwan to see its first geothermal power plant in 3 decades|work=Taiwan News|access-date=25 November 2021}} It was then commissioned on 23 November 2021.{{cite web|last=Richter|first=Alexander|date=16 November 2021|url=https://www.thinkgeoenergy.com/start-of-new-4-2-mw-geothermal-plant-in-taiwan-set-for-nov-23-2021/|title=Start of new 4.2 MW geothermal plant in Taiwan set for Nov. 23, 2021|work=Think Geoenergy|access-date=17 November 2021}}
Technical specifications
The power plant has an installed generation capacity of 4.2 MW. The temperature of the geothermal reservoir is around 180°C with a depth of 1,200–2,100 meters. It has an hourly power generation capacity of 3,150 kWh.{{cite web|last=Richter|first=Alexander|date=22 September 2021|url=https://www.thinkgeoenergy.com/start-of-4-2-mw-quingshui-geothermal-plant-imminent-in-taiwan/|title=Start of 4.2 MW Quingshui geothermal plant imminent in Taiwan|work=Think Geoenergy|access-date=1 November 2021}}
Finance
The power plant was constructed with a cost of NT$765 million. Yiyuan, the company that invested into the power plant, was granted the permit to operate the power purchase agreement for 20 years, in which it will pay the government NT$2 million annually.
See also
References
{{reflist}}
{{commons category}}
Category:2021 establishments in Taiwan
Category:Buildings and structures in Yilan County, Taiwan
Category:Energy infrastructure completed in 2021
Category:Geothermal power stations in Taiwan
{{Taiwan-powerstation-stub}}