RBWH busway station

{{Short description|Bus station in Brisbane, Australia}}

{{Use Australian English|date=June 2020}}

{{Use dmy dates|date=August 2019}}

{{Infobox station

| name = RBWH

| type =

| style = TransLink (Queensland)

| image = RBWH busway station.jpg

| image_size =

| image_caption =

| address = Bowen Bridge Road, Herston

| country =

| coordinates = {{coord|27|26|51|S|153|01|45|E|display=inline,title|region:AU-QLD_type:railwaystation}}

| elevation =

| distance =

| line = Northern Busway

| other =

| bus_routes = 14

| bus_stands =

| structure = Elevated

| platform = 2

| depth =

| levels =

| tracks =

| parking =

| bicycle = RBWH Cycle Centre

| opened = 3 August 2009

| closed =

| rebuilt =

| accessible = Yes

| architectural_style =

| code = {{url|translink.com.au/stop/000897|000897}} (platform 1)
{{url|translink.com.au/stop/000896|000896}} (platform 2)

| owned = Department of Transport & Main Roads

| operator = Transport for Brisbane

| zone = go card 1

| former =

| passengers =

| pass_year =

| pass_percent =

| pass_system =

| mpassengers =

| services = {{Adjacent stations

|system1=TransLink (Queensland)

|line3=Northern|left3=Herston|to-left3=King George Square|right3=Lutwyche

}}

| web = [{{Translink stop|rbwh-station}} Translink]

| route_map =

| map_state =

}}

RBWH busway station is located in Brisbane, Australia serving the suburb of Herston and Royal Brisbane & Women's Hospital from which its name is an acronym of. It opened on 3 August 2009 when the Northern Busway was extended from Herston.[https://www.busnews.com.au/industry-news/0907/busways-open-for-business-in-brisbane Busways open for business in Brisbane] {{Webarchive|url=https://web.archive.org/web/20170318085620/https://www.busnews.com.au/industry-news/0907/busways-open-for-business-in-brisbane |date=18 March 2017 }} Australasian Bus & Coach 24 July 2009[http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=65514 More than half a billion dollars worth of busway to open for business] {{Webarchive|url=https://web.archive.org/web/20110610020950/http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=65514 |date=10 June 2011 }} Queensland Government 2 August 2009"Busway ready to roll" mX 3 August 2009 page 2

The station has two platforms which can be accessed via an elevated concourse located below the platforms, while stairs and elevators also give passengers access to ground level just below the concourse.

It is served by 14 routes all operated by Transport for Brisbane.{{Queensland Timetables|Northern Busway Map}}

References

{{Reflist}}