Red Line (Namma Metro)
{{Short description|Proposed line of Bengaluru's Namma Metro}}
{{Use dmy dates|date=November 2021}}
{{Use Indian English|date=November 2021}}
{{Infobox rail line
| box_width =
| name = Red Line
| color = {{rcr|Namma Metro|Red}}
| logo = Namma metro.svg
| logo_width =
| logo_alt =
| image =
| image_width =
| image_alt =
| caption =
| other_name =
| native_name =
| native_name_lang =
| type = Metro
| system = Namma Metro
| status = Approved from Karnataka Cabinet and waiting from Union Cabinet
| locale = Bangalore, Karnataka, India
| start = {{stl|Namma Metro|Hebbala}}
| end = Sarjapura
| connectinglines = Operational (1) {{rcb|Namma Metro|Purple|croute}}
Upcoming (3):
{{rcb|Namma Metro|Blue|croute}} {{rcb|Namma Metro|Orange|croute}} {{rcb|Namma Metro|Pink|croute}}
Proposed (1):
{{rcb|Namma Metro|Aqua|croute}}
| stations = 28
| routes =
| daily_ridership =
| ridership2 =
| linenumber =
| website = [https://english.bmrc.co.in/ bmrc.co.in]
| yearcommenced =
| planopen = {{start date and age|2030|df=y}} (TBC)
| open =
| yearcompleted =
| close =
| owner = Bangalore Metro Rail Corporation Limited (BMRCL)
| operator =
| character = (TBC)
| stock =
| event1label =
| event1 =
| event2label =
| event2 =
| event3label =
| event3 =
| linelength_km = 37
| linelength =
| tracklength_km =
| tracklength =
| tracks = 2
| gauge = {{RailGauge|sg|allk=on}}
| load_gauge =
| minradius =
| electrification = 750 V DC third rail
| speed_km/h =
| speed_mph =
| speed =
| signalling =
| elevation_m =
| elevation_ft =
| elevation =
| racksystem =
| routenumber =
| map = {{BMR Red Line}}
| map_state = collapsed
| map_name = Red Line map (TBC)
}}
The Red Line or Hebbal-Sarjapura Line is a proposed metro rail line that will become part of Namma Metro's network in the city of Bangalore, Karnataka, India. Phase-3A of Namma Metro has been planned to become operational around the year 2030.{{Cite news |last=H.S |first=Shreyas |date=2023-07-07 |title=Karnataka Budget proposes new 37 km of Namma Metro line from Hebbal to Sarjapur in Bengaluru |url=https://www.thehindu.com/news/cities/bangalore/karnataka-budget-proposes-new-37-km-of-namma-metro-line-from-hebbal-to-sarjapur-in-bengaluru/article67054282.ece |access-date=2024-04-02 |work=The Hindu |language=en-IN |issn=0971-751X}}{{Cite web |date=2024-01-17 |title=Bengaluru Metro: Sarjapur To Hebbal 37-km Line is Ready, Set to Reduce City's Traffic |url=https://www.news18.com/auto/bengaluru-metro-sarjapur-to-hebbal-37-km-line-is-ready-set-to-reduce-citys-traffic-8743512.html |access-date=2024-04-02 |website=News18 |language=en}}{{Cite web |date=2024-10-11 |title=Namma Metro: Phase 3-A Gets Green Light, Full Details Inside |url=https://www.news18.com/auto/namma-metro-phase-iii-a-gets-green-light-full-details-inside-9082580.html |access-date=2024-10-15 |website=News18 |language=en}}
As per latest news updates, the Karnataka Cabinet had approved the Phase 3A of this metro line, linking Sarjapur in southeastern Bengaluru with Hebbal in the north on December 6, 2024. The approval from the Union Cabinet is awaited, as the Centre holds a 50% equity stake in Namma Metro.{{Cite news |date=2024-12-06 |title=Bengaluru’s Metro Phase 3A gets Cabinet nod |url=https://www.thehindu.com/news/cities/bangalore/bengalurus-metro-phase-3a-gets-cabinet-nod/article68956563.ece |access-date=2024-12-07 |work=The Hindu |language=en-IN |issn=0971-751X}}{{Cite news |date=2024-12-06 |title=Cabinet approval for Metro’s Rs28k-cr Sarjapur-Hebbal line |url=https://timesofindia.indiatimes.com/city/bengaluru/bengaluru-cabinet-approves-rs28405-crore-sarjapur-hebbal-metro-line-project/articleshow/116053904.cms |access-date=2024-12-07 |work=The Times of India |issn=0971-8257}}
Funding
Estimated at Rs 16,543 crore, including land acquisition charges, the 37-km line is outlined in the Comprehensive Mobility Plan 2020. This proposed metro line is expected to ease travel for public commuting to and from tech zones.{{Cite news |date=2024-01-14 |title=DPR ready for Sarjapur-Hebbal line |url=https://timesofindia.indiatimes.com/city/bengaluru/namma-metro-connectivity-dpr-ready-for-sarjapurhebbal-line-in-bengaluru/articleshow/106826406.cms |access-date=2024-04-02 |work=The Times of India |issn=0971-8257}} The alignment involves an elevated corridor near the IT corridor in Sarjapur, transitioning underground at Koramangala, traversing the central business district through tunnels, and emerging on Ballari Road with elevated stations at Ganganagar and Hebbal.
Stations
The Red Line (Hebbal-Sarjapura Line) is planned to have 28 stations.{{Cite web |title=Bangalore Metro readies DPR of ₹16,543 crore Sarjapur-Hebbal Metro Corridor {{!}} Metro Rail Today |url=https://metrorailtoday.com/news/bangalore-metro-readies-dpr-of-16543-crore-sarjapur-hebbal-metro-corridor |access-date=2024-04-02 |website=Metro Rail Today: Gateway to Rail & Metro Industry}}{{Cite web |date=11 October 2024 |title=UDD approves Namma Metro's Phase 3A project, from Hebbal to Sarjapura. |url=https://x.com/brandBLR/status/1844602598441046215/photo/1 |access-date=13 October 2024 |website=moneycontrol through X (formerly Twitter) |language=en}}
= Interchanges =
Passenger interchange facilities, connecting to other metro and railway lines, will be provided at the following stations:
- {{stl|Namma Metro|Hebbala}} (Connects to the Orange Line, which runs between JP Nagar 4th Phase and Kempapura and to the Blue Line, which runs from {{stl|Namma Metro|Central Silk Board}} to KIAL Terminals)
- Krishna Rajendra circle (Connects to the Purple Line, which runs between Whitefield (Kadugodi) to Challaghatta)
- Dairy Circle (Connects to the Pink Line, which runs between Nagawara and Kalena Agragara)
- Agara (Connects to the Orange Line, which runs between JP Nagar 4th Phase and Kempapura and to the Blue Line, which runs from {{stl|Namma Metro|Central Silk Board}} to KIAL Terminals)
- Ibbaluru (Connects to the Orange Line, which runs between JP Nagar 4th Phase and Kempapura and to the Blue Line, which runs from {{stl|Namma Metro|Central Silk Board}} to KIAL Terminals)
class="wikitable" style="text-align: center;" width="65%" |
colspan="5" align="center" style="background:#{{rcr|Namma Metro|Red}};" |Red Line |
---|
rowspan="2"|#
! colspan="2"|Station name ! rowspan="2"|Connections |
English||Kannada |
1
|{{stl|Namma Metro|Hebbala }} |ಹೆಬ್ಬಾಳ |{{rint|bengaluru|metro}} {{rcb|Namma Metro|Blue|croute}} |Elevated |
2
|Ganganagar |ವೆಟರ್ನರಿ ಕಾಲೇಜು | |Elevated |
3
|Veterinary College |ಗಂಗೇನಹಳ್ಳಿ | |Underground |
4
|Mekhri Circle |ಮೇಖ್ರಿ ಸರ್ಕಲ್ | |Underground |
5
|Palace Guttahalli |ಗುಟ್ಟಹಳ್ಳಿ ಅರಮನೆ |Underground |
6
|Bengaluru Golf Course |ಬೆಂಗಳೂರು ಗಾಲ್ಫ್ ಕೋರ್ಸ್ | |Underground |
7
|Basaveshwara Circle |ಬಸವೇಶ್ವರ ವೃತ್ತ | |Underground |
8
|Krishna Rajendra circle |ಕೃಷ್ಣ ರಾಜೇಂದ್ರ ವೃತ್ತ |{{rint|bengaluru|metro}} {{rcb|Namma Metro|Purple|croute}} |Underground |
9
|Town Hall |ಟೌನ್ ಹಾಲ್ | |Underground |
10
|Shanthinagara |ಶಾಂತಿನಗರ |Underground |
11
|NIMHANS |ನಿಮ್ಹಾನ್ಸ್ | |Underground |
12
|ಡೈರಿ ಸರ್ಕಲ್ |{{rint|bengaluru|metro}} {{rcb|Namma Metro|Pink|croute}} (under construction) |Underground |
13
|Koramangala II Block |ಕೋರಮಂಗಲ II ಬ್ಲಾಕ್ | |Underground |
14
|Koramangala III Block |ಕೋರಮಂಗಲ III ಬ್ಲಾಕ್ | |Elevated |
15
|Jakkasandra |ಜಕ್ಕಸಂದ್ರ | |Elevated |
16
|{{stl|Namma Metro|Agara}} |ಅಗರ |{{rint|bengaluru|metro}} {{rcb|Namma Metro|Blue|croute}} (under construction) |Elevated |
17
|{{stl|Namma Metro|Ibbaluru}} |ಇಬ್ಬಲೂರು |{{rint|bengaluru|metro}} {{rcb|Namma Metro|Blue|croute}} (under construction) |Elevated |
18
|Bellanduru Gate |ಬೆಳ್ಳಂದೂರು ಗೇಟ್ | |Elevated |
19
|Kaikondrahalli |ಕೈಕೊಂಡ್ರಹಳ್ಳಿ | |Elevated |
20
|Doddakannelli |ದೊಡ್ಡಕನ್ನೆಲ್ಲಿ | |Elevated |
21
|Carmelaram |ಕಾರ್ಮೆಲರಾಮ್ |{{RouteBox|Kanaka|Kanaka line|#de5e33|white}} (Under Construction) |Elevated |
22
|Ambedkar Nagara |ಅಂಬೇಡ್ಕರ್ ನಗರ | |Elevated |
23
|Kodathi Circle |ಕೋಡತಿ ವೃತ್ತ | |Elevated |
24
|Muthanalluru Cross |ಮುತ್ತನಲ್ಲೂರು ಕ್ರಾಸ್ | |Elevated |
25
|Dommasandra |ದೊಮ್ಮಸಂದ್ರ | |Elevated |
26
|Sompura |ಸೋಂಪುರ | |Elevated |
27
|Kada Agrahara Road |ಕಡ ಅಗ್ರಹಾರ ರಸ್ತೆ | |Elevated |
28
|Sarjapura |ಸರ್ಜಾಪುರ | |Elevated |
See also
References
{{Reflist}}
{{Namma Metro|red line=yes}}