| foundation = {{Start date and age|2008}}
| founder =
| defunct = 2020
| location_city = Santa Monica, California
| location_country = U.S.
| location =
| locations =
| area_served =
| key_people = Tom Georgis (CEO)
Bill Gould(CTO)
| industry = Solar thermal power
| products =
| services =
| revenue =
| operating_income =
| net_income =
| equity =
| owner =
| num_employees =
| parent =
| divisions =
| subsid =
| homepage = [https://web.archive.org/web/20190906095125/http://www.solarreserve.com/ SolarReserve.com (archived)]
| footnotes =
}}
SolarReserve was a developer of utility-scale solar power projects which include Concentrated Solar Power (CSP) and Photovoltaic (PV) technology. The company has commercialized solar thermal energy storage technology that enables solar power tower CSP plants to deliver electricity day and night. In this technology, a molten salt is used to capture the energy from the sun and store it. When electricity is needed, the stored liquid salt is used to turn water into steam to turn a turbine and generate electricity.WIRED, The Window, [https://www.youtube.com/watch?v=J3DylmjBPvo Crescent Dunes Solar Energy Project Part 1: The Facility-The Window-WIRED]Grunwald, Mike. [https://time.com/2826289/the-green-revolution-is-here/ The Green Revolution is Here], TIME, June 5, 2014. (Subscription required)
As of May 2015, SolarReserve has developed and secured long-term power contracts for 482 megawatts (MW) of solar projects representing $2.8 billion of project capital, with a development pipeline of more than 6.6 gigawatts (GW) globally.Dipaola, Anthony. [https://www.bloomberg.com/news/articles/2014-05-09/solarreserve-seeks-south-african-plants-expansion-into-mideast SolarReserve Seeks South African Plants, Expansion Into MidEast], Bloomberg, May 9, 2014 SolarReserve reached its lowest price yet at ¢6.3/kWh for the 2019 Copiapó Solar Project. By 2020, the company had ceased operations. An affiliate of SolarReserve filed a lawsuit to inspect the books of Tonopah Solar Energy LLC, a power plant project SolarReserve invested but ended losing control.{{Cite web |last=Deign |first=Jason |title=America's Concentrated Solar Power Companies Have All but Disappeared |url=https://www.greentechmedia.com/articles/read/americas-concentrated-solar-power-companies-have-all-but-disappeared |website=America’s Concentrated Solar Power Companies Have All but Disappeared}} A Delaware judged rule rejected SolarReserve's affiliate claim.{{Cite web |last=Leonard |first=Mike |title=SolarReserve Loses Second Suit Over Failed Nevada Energy Venture |url=https://news.bloomberglaw.com/esg/solarreserve-loses-second-suit-over-failed-nevada-energy-venture?context=search&index=8 |website=Bloomber Law}}
History
SolarReserve was formed in early 2008 with seed capitalLunsford, Lynn. [https://www.wsj.com/articles/SB119924708042261755 Solar Venture Will Draw on Molten Salt]. The Wall Street Journal. January 2, 2008. from US Renewables Group, in partnership with United Technologies Corporation (UTC), to commercialize advanced molten salt technology for utility-scale concentrated solar thermal power.Silver, Edward, [http://latimesblogs.latimes.com/money_co/2008/09/money-may-be-ev.html Solar-to-Salt Energy Start up gets $140 Million in Financing] LA Times, September 19, 2008 This technology was first developed and tested by Rocketdyne for two decades and had more than 100 US and international patents.Karuh, Carri. [http://breakingenergy.com/2013/04/03/concentrated-solar-power-tower-technology-hits-milestone/ Concentrated Solar Power Tower Technology Hits Milestone], Breaking Energy, April 3, 2013Woody, Todd. [https://www.forbes.com/forbes/2012/0423/technology-halotechnics-justin-raade-molten-salt-making-solar-viable.html Secret Ingredient to Making Solar Energy Work: Salt], Forbes, April 4, 2012Litwin, RZ, [http://patentimages.storage.googleapis.com/pdfs/US8365529.pdf High Temperature Molten Salt Receiver], Patent Images, June 20, 2006. In September 2008, the company raised an additional $140 million in a Series B funding.Kho, Jennifer. [http://www.greentechmedia.com/articles/solarreserve-raises-140m-for-solar-thermal-projects-1419.html SolarReserve Raises $140M for Solar-Thermal Projects], GreenTechMedia.com website, September 16, 2008.
In 2014, SolarReserve acquired ownership from Rocketdyne of its intellectual property rights and patents specifically for molten salt technology for concentrated solar-thermal power and electricity storage, heliostat designs and collector field control systems.Yang, Melissah. [http://www.labusinessjournal.com/news/2014/oct/27/solarreserve-buys-aerojet-rocketdyne-division/ SolarReserve Buys Aerojet Rocketdyne Division], Los Angeles Business Journal, October 27, 2014 By 2020, the website was no longer active.{{cite web |last1=Deign |first1=Jason |title=America's Concentrated Solar Power Companies Have All but Disappeared |url=https://www.greentechmedia.com/articles/read/americas-concentrated-solar-power-companies-have-all-but-disappeared |website=www.greentechmedia.com |date=20 January 2020}}
Projects
=Crescent Dunes Solar Energy Project=
The 110 MW Crescent Dunes Solar Energy Project is the world’s first utility-scale facility to use molten salt power tower energy storage. It has 10,347 tracking mirrors Kraemer, Susan. {{usurped|1=[https://web.archive.org/web/20160207205227/http://social.csptoday.com/technology/csp-2015-plant-data-highlight-output-costs-against-tech-risk CSP 2015 plant data to highlight output costs against tech risk]}}, CSP Today, May 22, 2015 (heliostats) that follow the sun and reflect and concentrate sunlight onto a heat exchanger, a receiver, atop a {{convert|640|ft|adj=on}} tower. Crescent Dunes has 10 hours of storage and was to deliver 500,000 MW hours of electricity per year, day and night, to 75,000 homes.{{cite news|url= http://america.aljazeera.com/watch/shows/techknow/blog/2014/1/23/need-to-know-howsolarreservegeneratesenergyaroundtheclock.html |title= Need to Know: How SolarReserve generates energy around the clock | first1= Meredith |last1= Kile |first2= Chanelle Berlin |last2= Johnson |website= america.aljazeera.com |date= 2014-01-23 |access-date= 2017-01-11}} In September, 2011, SolarReserve received a $737 million loan guarantee from the U.S. Department of Energy (DOE) for the project and broke ground.[http://energy.gov/articles/energy-department-finalizes-737-million-loan-guarantee-tonopah-solar-energy-nevada-project Energy Department Finalizes $737 Million Loan Guarantee to Tonopah Solar Energy for Nevada Project] (Press release). Loan Programs Office (LPO), Dept. of Energy (DOE). September 28, 2011. Retrieved 2 July 2014. The project had a 25-year agreement with NV Energy for 100 percent of the electricity, but after multiple failures of its molten salt storage tanks, one resulting in an eight month outage,{{Cite web|date=2020-08-03|title=Post bankruptcy, Crescent Dunes CSP plant owner wants project back online by year's end|url=https://pv-magazine-usa.com/2020/08/03/post-bankruptcy-and-doe-loan-owner-of-crescent-dunes-wants-csp-plant-online-by-years-end/|access-date=2021-01-29|website=pv magazine USA|language=en-US}} it was terminated by NV Energy in October 2019 due to the project having "failed to produce."{{Cite web|url=https://thenevadaindependent.com/article/nv-energy-sends-termination-notice-to-massive-tonopah-solar-project-developer-accuses-energy-department-of-taking-over|title=NV Energy sends termination notice to massive Tonopah solar project, developer accuses Energy Department of taking over|date=6 October 2019}} Alleging a takeover by the DOE, SolarReserve has raised the possibility of this project filing for bankruptcy.{{Cite web|url=https://pv-magazine-usa.com/2019/10/07/will-doe-take-the-crescent-dunes-solar-project-into-bankruptcy/|title=Will DOE take the Crescent Dunes solar project into bankruptcy?|date=7 October 2019}} The company canceled another Nevada project in 2019.{{cite web |title=SolarReserve nixes Nevada plans for world's largest solar project |url=http://www.cspfocus.cn/en/market/detail_1634.htm |website=www.cspfocus.cn}}
=Redstone Solar Thermal Power Project=
The Redstone Solar Thermal Power Project is a planned 100 MW solar project located at Postmasburg, near Kimberly, South Africa. The project will have 12 hours of storage to deliver to more than 200,000 South African homes.{{cite web
|title= SolarReserve Wins Bid to Build South African Solar Plus Storage Plant
|date=8 January 2015
|url=http://www.renewableenergyworld.com/news/2015/01/solarreserve-acwa-win-bid-to-build-south-african-solar-plus-storage-plant.html
|access-date=8 June 2015}} In May 2019, it was reported that financing for Redstone was almost complete.{{cite web | title = Morocco's Ourazazate Noor III CSP Tower Exceeds Performance Targets | first = Susan | last = Kraemer | website = solarpaces.org | date = 2019-05-27 | url = https://www.solarpaces.org/moroccos-ourazazate-noor-iii-csp-tower-exceeds-performance-targets/ | access-date = 2019-06-14}}
=Aurora Solar Thermal Power Project=
The Aurora Solar Thermal Power Project was a 150MW solar thermal plant proposed to be built about {{convert|30|km}} north of Port Augusta in South Australia.{{cite news|last1=Geuss|first1=Megan |title=South Australia okays giant solar thermal plant from SolarReserve|url= https://arstechnica.com/information-technology/2017/08/south-australia-okays-giant-solar-thermal-plant-from-solarreserve/ |access-date=14 August 2017|publisher=Ars Technica|date=14 August 2017}} The project was expected to cost AUD $650 million and was to be completed by 2020. The promised power delivery price is noted to be competitive with combined-cycle natural-gas plants.{{cite news|last1=Lacey|first1=Stephen |title=SolarReserve Inks Deal With South Australia to Supply Solar Thermal Power With Storage for 6 Cents|url= https://www.greentechmedia.com/articles/read/solarreserve-inks-deal-with-south-australia-to-supply-solar-thermal-power-w |access-date=14 August 2017|publisher=GreenTech Media|date=14 August 2017}}
On 5 April 2019, South Australian Energy Minister Dan van Holst Pellekaan announced the cancellation of the project.{{cite news |url=https://www.abc.net.au/news/2019-04-05/solar-thermal-plant-will-not-go-ahead-in-port-augusta/10973948 |title=Port Augusta solar thermal power plant scrapped after failing to secure finance |work=ABC News |date=5 April 2019 |access-date=5 April 2019}} The project may continue with other companies.{{cite web |title=New hope for Port Augusta's failed SolarReserve Concentrated Solar Power project |url=http://www.cspfocus.cn/en/market/detail_2413.htm |website=www.cspfocus.cn}}
=Copiapó Solar Project=
The Copiapó Solar Project near Copiapó, Atacama Region, Chile is a 260 MW hybrid solar power project consisting of CSP and PV energy. It will have 14 hours of storage to deliver to more than 560,000 homes in Atacama. The project is the first of its kind in Chile and will be the largest solar power plant in the world.[http://www.cnnchile.com/programa/agenda-economica/capitulo/2538 “Copiapo Solar”: La primera planta hibrida en el pais que operaria las 24 horas]. CNN, March 04, 2015 At the 2017 auction, SolarReserve bid $63/MWh (¢6.3/kWh) for 24-hour CSP power with no subsidies, competing with other types such as LNG gas turbines.{{cite web|url= https://cleantechnica.com/2017/03/13/solarreserve-bids-24-hour-solar-6-3-cents-chile/ |title=SolarReserve Bids 24-Hour Solar At 6.3 Cents In Chile |first=Susan |last=Kraemer |website=CleanTechnica |date=13 March 2017|access-date=14 March 2017}}
=Photovoltaic=
See also
References
{{reflist|30em}}
Further reading
- Wald, Matthew L. [https://www.nytimes.com/2013/10/18/business/energy-environment/arizona-utility-tries-storing-solar-energy-for-use-in-the-dark.html?_r=0 Arizona Utility Tries Storing Solar Energy for Use in the Dark], The New York Times, October 18, 2013, p. B1 (New York edition); also published online at NYTimes.com on October 17, 2013. Retrieved October 18, 2013. Discusses BrightSource Energy, Electric Power Research Institute, Ivanpah Solar Power Facility project, and the Solana Generating Station project
External links
- [https://web.archive.org/web/20121121103944/http://www.solar-reserve.com/ Official SolarReserve website]
{{United Technologies Corporation}}
{{Pratt & Whitney}}
Category:Solar energy companies of the United States
Category:Solar energy in California
Category:Technology companies based in Greater Los Angeles