Soviet destroyer Silny

{{Short description|Soviet Storozhevoy-class destroyer}}

{{good article}}

{{Infobox ship begin}}

{{Infobox ship image

|Ship image=Unidentified Project 7U in the Black Sea.jpg

|Ship caption=An unidentified Storozhevoy-class destroyer in the Black Sea

}}

{{Infobox ship career

|Hide header=

|Ship country=Soviet Union

|Ship flag={{shipboxflag|Soviet Union|naval-1935}}

|Ship name=Silny ({{lang|ru|Сильный}} (Strong))

|Ship renamed=TsL-43, 20 February 1959

|Ship ordered=2nd Five-Year Plan

|Ship reclassified=As a target ship, 20 February 1959

|Ship builder=Shipyard No. 190 (Zhdanov), Leningrad

|Ship original cost=

|Ship yard number=520

|Ship way number=

|Ship laid down=31 March 1938

|Ship launched=8 April 1939

|Ship completed=31 October 1940

|Ship commissioned=12 April 1941

|Ship fate=Scrapped, 21 January 1960

|Ship notes=

}}

{{Infobox ship characteristics

|Hide header=

|Header caption=(Storozhevoy, 1941)

|Ship class ={{sclass|Storozhevoy|destroyer}}

|Ship displacement=*{{cvt|1727|t|LT}} (standard)

|Ship length= {{convert|112.5|m|ftin|abbr=on}} (o/a)

|Ship beam={{convert|10.2|m|ftin|abbr=on}}

|Ship power=*4 water-tube boilers

  • {{cvt|54000|shp|kW|lk=in}} (trials)

|Ship draft={{convert|3.98|m|ftin|abbr=on}}

|Ship propulsion=2 shafts, 2 steam turbine sets

|Ship speed= {{convert|40.3|kn|lk=in}} (trials)

|Ship endurance={{convert|2700|nmi|lk=in|abbr=on}} at {{convert|19|kn}}

|Ship complement=207 (271 wartime)

|Ship sensors=Mars hydrophones

|Ship armament=*4 × single 130 mm/50 B13 Pattern 1936

|Ship notes=

}}

Silny ({{langx|ru|Сильный|lit=Strong}}) was one of 18 {{sclass|Storozhevoy|destroyer}}s (officially known as Project 7U) built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 {{sclass|Gnevny|destroyer|2}}, Silny was completed in 1940 to the modified Project 7U design.

Serving with the Baltic Fleet, she participated in minelaying and escort operations after the start of the German invasion of the Soviet Union (Operation Barbarossa) in June 1941. Silny engaged German minesweepers in the Irbe Strait on 6 July without result, and was taken out of action by propeller damage later that month. Returning to service in late August, she conducted shore bombardments during the Siege of Leningrad. Bomb damage from an air raid in late September caused her to spend the rest of the year under repair. The destroyer saw little action for the rest of the war, aside from firing shore bombardments during the Krasnoye Selo–Ropsha and Vyborg–Petrozavodsk Offensives in 1944. Postwar, she continued to serve in the Baltic and was briefly converted to a target ship before being scrapped in the early 1960s.

Design and description

{{Main|Storozhevoy-class destroyer}}

Originally built as a Gnevny-class ship, Silny and her sister ships were completed to the modified Project 7U design after Joseph Stalin, General Secretary of the Communist Party of the Soviet Union, ordered that the latter be built with their boilers arranged en echelon, instead of linked as in the Gnevnys, so that a ship could still move with one or two boilers disabled.Rohwer & Monakov, p. 52; Balakin, p. 8

Like the Gnevnys, the Project 7U destroyers had an overall length of {{convert|112.5|m|ftin|sp=us}} and a beam of {{convert|10.2|m|ftin|sp=us}}, but they had a reduced draft of {{convert|3.98|m|ftin|sp=us}} at deep load. The ships were slightly overweight, displacing {{convert|1727|MT|LT}} at standard load and {{convert|2279|MT|LT}} at deep load. The crew complement of the Storozhevoy class numbered 207 in peacetime, but this increased to 271 in wartime, as more personnel were needed to operate additional equipment.Balakin, pp. 30, 44; Yakubov & Worth, p. 101 Each ship had a pair of geared steam turbines, each driving one propeller, rated to produce {{convert|54000|shp|lk=on}} using steam from four water-tube boilers, which the designers expected would exceed the {{convert|37|kn|adj=on}} speed of the Project 7s because there was additional steam available. Some fell short of it, although specific figures for most individual ships have not survived. Variations in fuel oil capacity meant that the range of the Project 7Us varied between {{convert|1380|to|2700|nmi|lk=in}} at {{convert|19|kn}}, that upper figure demonstrated by Storozhevoy.Yakubov & Worth, pp. 101, 106–107

The Project 7U-class ships mounted four 130 mm/50 B13 Pattern 1936 in two pairs of superfiring single mounts fore and aft of the superstructure. Anti-aircraft defense was provided by a pair of 76.2 mm anti-aircraft gun Model 1935 (34-K) AA guns in single mounts and three 45 mm anti-aircraft gun (21-K) AA guns,Hill, p. 42 as well as four {{convert|12.7|mm|adj=on|sp=us}} DK or DShK machine guns. They carried six {{cvt|533|mm|in}} torpedo tubes in two rotating triple mounts amidships. The ships could also carry a maximum of 58 to 96 mines and 30 depth charges. They were fitted with a set of Mars hydrophones for anti-submarine work, although these were useless at speeds over {{convert|3|kn}}.Yakubov & Worth, pp. 101, 105–106

= Modifications =

During repairs in July and August 1941, Silny received a pair of 37 mm automatic air defense gun M1939 (61-K) AA guns. While under repair in May 1942, her 45 mm guns were replaced, one for one, by more 70-K guns. She was also equipped with two Oerlikon 20 mm cannon AA guns and a quadruple mount for Vickers .50 machine gun AA machineguns. A {{cvt|1.5|m|ftin|adj=on|sp=us}} DM rangefinder was also installed at that time. During a refit from 14 September to 16 October, Silny was fitted with a Lend-Lease British Type 128 ASDIC system. In November 1943 the ship received a British Type 286 search radar and the Oerlikons were replaced by a pair of 70-K guns in January 1944. The Type 286 radar was replaced by a Type 291 search radar in April 1945.Platonov, pp. 211–212 by the end of the war, she had been fitted with a Type 284 fire-control radar. After the war, all of her AA guns were replaced by eight water-cooled V-11M versions of the 70-K gun in twin mounts.Hill, p. 36; Yakubov & Worth, pp. 105–106

Construction and World War II

Silny was laid down in Shipyard No. 190 (Zhdanov) in Leningrad with the yard number 520 on 26 October 1936 as a Gnevny-class destroyer. She was relaid down as a Project 7U destroyer on 31 January 1938, and launched on 1 November 1938.Rohwer & Monakov, p. 234 Accepted by a state commission on 31 October 1940, Silny officially joined the Baltic Fleet Light Forces Detachment on 12 April 1941 when the naval jack of the Soviet Union was raised aboard her. Along with her sister ships {{Ship|Soviet destroyer|Stoyky|1938|2}}, {{Ship|Soviet destroyer|Storozhevoy||2}}, and {{Ship|Soviet destroyer|Serdity|1940|2}}, she relocated from Tallinn to Ust-Dvinsk on 14 June. In the days following the beginning of Operation Barbarossa, the German invasion of the Soviet Union, on 22 June, the destroyer participated in minelaying operations in the Irbe Strait, escorting the cruiser {{Ship|Soviet cruiser|Kirov||2}} between 27 and 28 June despite German aerial attacks.Balakin, p. 64

On the morning of 6 July, Silny, Serdity, the old destroyer {{Ship|Soviet destroyer|Engels||2}}, and the Uragan-class guard ships Tucha and Sneg departed for minelaying operations in the Irbe Strait; Silny carried 70 mines on her deck. Upon reaching the entrance to the strait at 12:29, German ships, reported as torpedo boats and an auxiliary cruiser, were spotted and both Type 7Us moved to attack, with Serdity leading. Although their gunners reported explosions on the German ships, which were actually the minesweeping support ship Minenräumschiff-11 (the former Osnabrück) and an attached minesweeper, Silny{{'}}s captain ordered the dropping of the mines stored on her deck due to the danger of explosion. This latter was not completely fulfilled as at 13:19 she received a {{cvt|105|mm}} hit on her stern that killed four and wounded seven sailors, damaging one 130 mm gun. A splinter also set fire to a mine, which was thrown overboard by three nearby wounded sailors who received the Order of the Red Banner for their action a week later. The hit caused Silny to reverse course behind a smoke screen, and Serdity did likewise two minutes later. After Silny finished jettisoning her mines at 13:35, both destroyers were ordered to pursue the German ships an hour later, but instead returned to base as they had lost contact with the latter. In the battle, Silny expended thirty-three 130 mm shells without result.Balakin, p. 65

In July, Silny made several more sorties to Moonsund and the Gulf of Riga, but had her screw damaged by grounding or contact with a shipwreck near shoals in Moonsund. She was sent to Kronstadt for repairs, leaving the dock on 23 August. Two days later, she bombarded Finnish positions on the coast of Vyborg Bay alongside Stoyky, expending more than 500 shells from her main guns over the next three days. The destroyer laid minefields in the Gulf of Finland during early September, setting 196 mines and 130 mine protectors in five sorties, before moving to Oranienbaum on 15 September to conduct shore bombardments of advancing German troops with the assistance of a fire correction post. There, Silny fired five hundred 130 mm shells until 20 September, when increased shelling and air raids on the exposed harbor of Oranienbaum forced her to withdraw to Kronstadt.{{refn|Platonov gives a total of 653 shells fired throughout all of 1941; he agrees with Balakin except for the shells fired during September.Platonov, p. 211|group=Note}}

The port was hit by a series of large German air raids beginning on 21 September. On the next day, the destroyer was attacked by nine Junkers Ju 87 dive bombers. Although one of the latter was hit by anti-aircraft fire, a {{cvt|100|kg}} bomb hit the aft superstructure and several more exploded close to the ship, showering her with fragments. The aft portion of the hull was severely damaged by the bomb, which started a fire; seven crewmen were killed and twenty-seven wounded. To prevent an explosion, the aft ammunition magazines were flooded, after which the fire was extinguished. Late in the day, the destroyer put into the Kronstadt Marine Plant for repairs. In October, she went to Leningrad on one engine for complete repairs at the Baltic Shipyard. While at the shipyard, a hit from a medium-sized artillery shell killed seven and wounded another seven crew members, in addition to damaging one of her 130 mm guns. The repairs were completed on 30 December, but the destroyer spent the remainder of the war in Leningrad and Kronstadt.Balakin, p. 66

Damaged by shelling on 20, 24 April and 14 May 1942, she was quickly repaired, downing a German aircraft with fire from a 37 mm gun on 24 April. After relocating to Kronstadt on the night of 25 July, Silny was refitted in September–October.Platonov, p. 212 From late 1942 to 1943, her only combat firing occurred on 1 June 1943 with the expenditure of eighteen 130 mm shells on Axis positions. She conducted shore bombardments in support of the Krasnoye Selo–Ropsha Offensive in January 1944, firing either 146 or about 400 main-gun shells.{{refn|Platonov says 146 shells.|group=Note}} Assisted by forward observers, the destroyer fired her last forty-four 130 mm shells of the war from Kronstadt in a 10 June bombardment of Finnish positions on the Karelian Isthmus during the Vyborg–Petrozavodsk Offensive. From November to the end of the war, Silny was refitted at the Baltic Shipyard.

Postwar

After the end of the war, Silny continued to serve with the Baltic Fleet, becoming part of the 4th Fleet between 25 February 1946 and 4 January 1956 when the latter was split. She underwent a major refit and modernization at Shipyard No. 890 in Tallinn, Estonia, between 19 November 1948 and 10 December 1954. The destroyer was removed from the combat fleet and reclassified as target ship TsL-43 on 20 February 1959. After being removed from the Soviet Navy on 21 January 1960, the former destroyer was transferred for scrapping at Paljassaare in Tallinn on 27 March when her crew was disbanded.Balakin, p. 189Berezhnoy, pp. 351–352

Notes

{{reflist|group=Note}}

Citations

{{Reflist|30em}}

Sources

  • {{Cite book|title=Легендарные "семёрки" Эсминцы "сталинской" серии|last=Balakin|first=Sergey|publisher=Yauza/Eksmo|year=2007|isbn=978-5-699-23784-5|location=Moscow|language=ru|trans-title=Legendary Sevens: Stalin's Destroyer Series}}
  • {{Cite book|title=Крейсера и миноносцы. Справочник|last=Berezhnoy|first=Sergey|publisher=Voenizdat |year=2002|isbn=5-203-01780-8|location=Moscow|language=ru|trans-title=Guide to Cruisers and Destroyers}}
  • {{cite book | last = Hill | first = Alexander | year = 2018 | title = Soviet Destroyers of World War II | place = Oxford, UK| publisher = Osprey Publishing| isbn = 978-1-4728-2256-7|series=New Vanguard|volume=256}}
  • {{cite book |last1=Platonov |first1=Andrey V.|title=Энциклопедия советских надводных кораблей 1941–1945 |trans-title=Encyclopedia of Soviet Surface Ships 1941–1945 |date=2002 |publisher=Poligon |location=Saint Petersburg |isbn=5-89173-178-9 |language=ru}}
  • {{cite book|last1=Rohwer|first1=Jürgen|last2=Monakov|first2=Mikhail S.|title=Stalin's Ocean-Going Fleet|publisher=Frank Cass|location=London|year=2001|isbn=0-7146-4895-7|name-list-style=amp |author-link=Jürgen Rohwer}}
  • {{cite book|last1=Yakubov|first1=Vladimir|last2=Worth |first2=Richard |chapter=The Soviet Project 7/7U Destroyers|editor1-last=Jordan |editor1-first=John |editor2-last=Dent |editor2-first=Stephen |publisher=Conway|location=London|year=2008|title=Warship 2008|pages=99–114 |isbn=978-1-84486-062-3 |name-list-style=amp}}

Further reading

  • {{cite book|title=Conway's All the World's Fighting Ships 1922–1946|editor-last=Chesneau|publisher=Conway Maritime Press|location=Greenwich, UK|year=1980 |isbn=0-85177-146-7|last=Budzbon|first=Przemysaw|pages=318–346|chapter=Soviet Union|editor-first=Roger}}

{{Storozhevoy-class destroyer}}

{{DEFAULTSORT:Silny (1938)}}

Category:Storozhevoy-class destroyers

Category:1938 ships

Category:Ships built at Severnaya Verf

Category:Cold War destroyers of the Soviet Union