Starfish Hill Wind Farm

{{Use dmy dates|date=January 2015}}

{{Use Australian English|date=January 2015}}

{{Infobox power station

| name = Starfish Hill Wind Farm

| name_official =

| image = Starfish Hill windfarm, Cape Jarvis.JPG

| image_caption =

| image_alt =

| coordinates = {{coord|35.5843|S|138.1402|E|type:landmark|display=inline,title}}

| coordinates_ref =

| country = Australia

| location =

| status =

| construction_began =

| commissioned = {{Start date|df=yes|2003|09}}

| decommissioned =

| cost = $65 million

| owner = RATCH-Australia

| operator =

| ps_units_operational = 22

| ps_units_manu_model = NEG Micon: NM64C

| wind_hub_height = {{Convert|68|m|ft|0|abbr=on}}

| wind_rotor_diameter = {{Convert|64|m|ft|0|abbr=on}}

| wind_rated_speed =

| wind_farm_type = Onshore

| wind_site_elevation =

| wind_site_usage =

| wind_site_area =

| ps_electrical_capacity = 35 MW

| ps_electrical_cap_fac =

| ps_annual_generation = 100 GWh

| website =

| extra =

}}

Starfish Hill Wind Farm is a wind power station spread over two hills near Cape Jervis, South Australia. It has 22 wind turbines, eight on Starfish Hill itself and 14 on Salt Creek Hill, with a combined generating capacity of 33 MW of electricity.

Starfish Hill Wind Farm was commissioned in September 2003, making it the first major wind farm in the state.{{Cite web|title = RATCH - Australia Corporation|url = http://www.ratchaustralia.com/starfish/about_starfish.html|website = www.ratchaustralia.com|accessdate = 2015-12-28}} On 30 October 2010, one of the original 23 turbines caught fire and was destroyed. It was not replaced, leaving the wind farm with 22 turbines.[https://www.wind-watch.org/news/2010/11/20/cant-fight-the-fire/ Can't fight the fire] National Wind Watch 4 November 2010

Starfish Hill Wind Farm was developed by Tarong Energy at a cost of $65 million. RATCH-Australia (at that time part of Transfield Services) acquired the wind farm in December 2007.[https://web.archive.org/web/20200427075106/https://www.asx.com.au/asxpdf/20071129/pdf/3164njhvc4mcyp.pdf TSI Fund acquires Five Wind Firms] Transfield Services 29 November 2007

See also

{{stack|{{Portal|South Australia|Weather|Renewable energy}}}}

References

{{reflist}}

{{Wind farms in Australia}}

{{EnergySA}}

Category:Fleurieu Peninsula

Category:Wind farms in South Australia

Category:2003 establishments in Australia

{{SouthAustralia-struct-stub}}

{{Australia-powerstation-stub}}

{{wind-farm-stub}}