Styal line

{{Short description|Railway line in Greater Manchester and Cheshire, England}}

{{Use dmy dates|date=November 2017}}

{{Use British English|date=November 2017}}

{{refimprove|date=June 2021}}

{{Infobox rail line

| box_width = auto

| color = 00cdfe

| name = Styal line
Airport line

| logo =

| logo_width =

| image = File:NT 195105 East Didsbury.jpg

| image_width = 300px

| caption = A Northern {{brc|195}} passing {{rws|East Didsbury}} in April 2025

| type =

| system = National Rail

| status = Operational

| locale = Greater Manchester
Cheshire
North West England

| start = {{rws|Manchester Piccadilly}}

| end = {{rws|Wilmslow}}

| stations = 9

| routes =

| ridership2 = 7.4 million per year

| open = 1909

| close =

| owner = Network Rail

| operator =

| character =

| depot =

| stock = Primarily:
Class 185
Class 195
Class 197
Class 323
Class 331
Class 397

| linelength =

| tracklength =

| gauge = {{RailGauge|sg|allk=on}}

| speed = 70 mph speed restriction

| electrification = 25 kV AC overhead

| elevation =

| map = 300px
(Click to expand)

| map_state = expanded

}}

{{Styal Line|collapse=y}}

The Styal line is a suburban commuter railway line which runs through south Manchester, England; it commences at Slade Lane Junction, {{convert|1.2|mi}} south of {{rws|Manchester Piccadilly}}, and ends {{convert|12|mi}} south at {{rws|Wilmslow}}.

Opened in 1909, by the London and North Western Railway company,{{sfn|Haywood|2009|p=237}} it takes its name from the Cheshire station of {{rws|Styal}}, the last stop before the junction at Wilmslow. A branch line to {{rws|Manchester Airport}} was built in 1993, accessed via a triangular junction between {{rws|Heald Green}} and Styal; it is also referred to as the Airport line.{{Cite web |title=Commons Transport Select Committee - Memorandum by the Greater Manchester Branch of the Institute of Logistics and Transport (REN 40) |quote="Increased TransPennine services to Manchester Airport: these presently reverse out of bay platforms on the eastern side of Piccadilly, with consequent waiting delays for through passengers from the west, and then cross West Coast Main Line and local tracks to reach the Styal (Airport) line approach to Slade Lane junction, on the extreme west of the layout." |url=https://publications.parliament.uk/pa/cm200203/cmselect/cmtran/782/782ap47.htm |work=HM Government |date=11 July 2003 |access-date=2018-12-09}}

Journeys into Manchester on the line have risen sharply since the 1990s and the opening of Manchester Airport station in 1993 fuelled an increase in express services from Northern England and beyond. As a result, it is now one of the most congested lines on the National Rail network, with services frequently susceptible to delays and cancellations.{{Cite web |title=Timetable recast: too much, too quickly |url=https://www.railwaygazette.com/news/news/uk/single-view/view/too-much-too-quickly.html |work=Railway Gazette |date=4 June 2018 |access-date=2018-08-13}}

Between May 2018 and December 2022, the line operated on a skip-stop basis, with each station having a dedicated express service to Liverpool Lime Street, Preston, Blackpool North and Windermere. This was to maximise the number of train slots between Manchester Piccadilly and Manchester Airport; however, due to poor performance and falling passenger numbers, the service reverted to half-hourly calling at all stations in December 2022, with one service running between {{rws|Crewe}} and Manchester Piccadilly and the other running between Manchester Airport and Liverpool Lime Street.{{Cite web |title=Manchester Recovery Task Force Public Consultation |url=https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1024623/manchester-recovery-task-force-public-consultation-response.pdf |work=Department for Transport |date=September 2021}} The three busiest stations (Heald Green, {{rws|Gatley}} and {{rws|East Didsbury}}) retain a third hourly express service in addition to the stopping services. As only one train per hour runs between Manchester Airport and Wilmslow, Styal station is served hourly.

History

File:Gatley station - up side - geograph.org.uk - 827101.jpg, the line was served by Class 304 electric multiple units]]

In the early twentieth century, the line between Manchester London Road (now called Piccadilly station) and Stockport became unable to cope with the increasing traffic. To solve the problem, a new route avoiding Stockport was constructed by the London and North Western Railway; it ran from Slade Lane Junction, located in Longsight, to Wilmslow through what was then mainly a rural area. The primary purpose was to provide a bypass for express trains, but a few wooden stations were built on the line to encourage suburban development. In practice, very few expresses latterly used the line, as it was necessary for most trains to serve the important station at Stockport. The line opened in 1909 and, from 1923, was operated by the London Midland and Scottish Railway.

In the 1950s, as part of British Rail's Modernisation Plan, the British Transport Commission identified the Styal line as a suitable test track to prove its new electrification scheme; the line was electrified in 1959. Some of the stations were rebuilt using the Mod-X system at this time.{{Cite news |date=2022-02-14 |title=Station to station: a spotter’s guide to prefab design on the railways |language=en-GB |work=The Guardian |url=https://www.theguardian.com/artanddesign/2022/feb/14/station-to-station-a-spotters-guide-to-prefab-design-on-the-railways |access-date=2023-07-12 |issn=0261-3077}} Following the Styal line tests, it was decided to adopt the 25 kV system across the electrified Great Britain rail network, outside the Southern Region.{{cite book |last1=Gourvish |first1=T. R. |last2=Blake |first2=N. |title=British Railways 1948-73: A Business History |date=1986 |publisher=Cambridge University Press |isbn=9780521264808 |pages=625–6 |url=https://books.google.com/books?id=_HaaS3Q7jAcC&dq=Styal%20Line&pg=PA626 |access-date=19 June 2018 |language=en}} There was a half-hourly electric service (Monday - Saturday) between {{rws|Manchester Oxford Road}} and {{rws|Alderley Edge}}, operated by Class 304 EMUs.{{sfn|Haywood|2009|p=261}} Services were extended to {{rws|Altrincham}} when the MSJAR was re-electrified at 25 kV AC in 1971 and operated in this way until the line between Altrincham and Manchester was transferred to Manchester Metrolink in 1990.

In the 1970s, the Styal line was included in a proposal to create an underground railway across Manchester City Centre. The Picc-Vic tunnel was planned to connect the two major mainline railway termini, Manchester Piccadilly and {{rws|Manchester Victoria}}; it would have enabled Styal line trains to run directly across the city to {{rws|Bolton}} and {{rws|Bury}}. The Picc-Vic scheme was abandoned in 1977, due to funding difficulties.{{cite book |last1=Brook |first1=Richard |last2=Dodge |first2=Martin |title=Infra_MANC |url=http://personalpages.manchester.ac.uk/staff/m.dodge/Infra_MANC_catalogue.pdf |publisher=CUBE Gallery |page=131 |date= 2012|access-date=27 January 2016}}

In 1993, a short spur line to Manchester Airport was opened, branching away the Styal line between Heald Green and Styal. Initially, services ran via Heald Green only, until a triangular junction was added a few years later which provided a link towards Styal.{{sfn|Haywood|2009|p=210}} Many services were then diesel powered until 2014. The introduction of Class 350s by First TransPennine Express on the Edinburgh-Manchester Airport line in December 2013 and Class 319s by Northern Rail in early 2015 curtailed the use of diesel trains on the line; this allowed for a 100 mph service compared with 75 mph limit for many diesel trains, such as the Class 156 and the now-retired Class 142 Pacer trains.{{cn|date=June 2021}}

In 2006, the platforms at Mauldeth Road, Burnage, East Didsbury and Gatley stations were all reconstructed, as well as access improvements at Heald Green; patronage on the line increased after this investment. At the time, most platforms were future-proofed and extended to allow six carriage operation; however, it was not until 2019, with the arrival of the Class 195 and Class 331 units, that this platform capacity was fully utilised on Northern routes to Liverpool (Mauldeth Road) and Blackpool North (Burnage, East Didsbury and Gatley) which operate with six coaches.{{cn|date=June 2021}}

In recent years, usage of the line has surged with growing commuter patronage, along with non-stopping services which use the line between Manchester Piccadilly and Manchester Airport. Nowadays, most services on the line operate via the airport. There are a couple of services each day (mainly long-distance trains) which take the direct route from Styal to Heald Green; that is to say, from Heald Green South Junction to Heald Green North Junction, for train crew route knowledge retention purposes northbound. However, the only services on the junction southbound are either freight or a Transport for Wales service which doesn't stop at either station and only operates on Sundays. This route can also be used for diversions if the Stockport route is closed for engineering work or is blocked due to an operational incident.{{cn|date=June 2021}}

{{-}}

Stations

class="wikitable sortable"

|+Styal line stations (with 5 year patronage statistics)

Station

! class="unsortable" |Image

! Location

! National services

! Annual
entry/exit
(millions)
1997/98{{cite web | url=http://www.rail-reg.gov.uk/server/show/nav.1529 | title=Station usage | publisher=Office of Rail Regulation | access-date=13 December 2016}}

! Annual
entry/exit

1999/00

! Annual
entry/exit

2004/05

! Annual
entry/exit

2009/10

! Annual
entry/exit

2014/15

! Annual
entry/exit

2019/20

Mauldeth Road

| 75px

| Ladybarn

| Northern Trains

| 87,054

| {{decrease}} 82,723

| {{increase}} 118,566

| {{increase}} 239,796

| {{increase}} 321,878

| {{decrease}} 305,762

Burnage

| 75px

| Burnage

| Northern Trains

| 71,774

| {{decrease}} 70,803

| {{increase}} 92,908

| {{increase}} 158,674

| {{increase}} 186,778

| {{increase}} 213,780

East Didsbury

| 75px

| Didsbury

| Northern Trains
Transport for Wales

| 87,893

| {{decrease}} 86,832

| {{increase}} 124,511

| {{increase}} 272,656

| {{decrease}} 254,256

| {{increase}} 296,966

Gatley

| 75px

| Gatley

| Northern Trains
TransPennine Express

| 121,459

| {{increase}} 130,086

| {{increase}} 151,681

| {{increase}} 238,096

| {{increase}} 309,926

| {{decrease}} 338,506

Heald Green

| 75px

| Heald Green

| Northern Trains

| 191,537

| {{increase}} 204,190

| {{increase}} 245,950

| {{increase}} 379,956

| {{increase}} 497,988

| {{decrease}} 482,318

Manchester Airport

| 75px

| Ringway

| Northern Trains
TransPennine Express
Transport for Wales

| 1,132,740

| {{increase}} 1,259,513

| {{increase}} 1,576,260

| {{increase}} 2,620,252

| {{increase}} 3,460,854

| {{increase}} 5,747,000

Styal

| 75px

| Styal

| Northern Trains

| 679

| {{increase}} 1,332

| {{increase}} 3,719

| {{decrease}} 2,206

| {{increase}} 5,668

| {{decrease}} 21,670

Total

|

|

|

| 1,693,136

| {{increase}} 1,835,479

| {{increase}} 2,313,595

| {{increase}} 3,911,609

| {{increase}} 5,037,348

| {{increase}} 7,406,002

Services

= Stopping services =

All stations on the line are served by two stopping services per hour operated by Northern Trains: one runs between Liverpool Lime Street and Manchester Airport and the other runs between Manchester Piccadilly and Crewe. On Sundays, this is reduced to one train per hour which runs between Liverpool Lime Street and Wilmslow. These services are usually operated by a {{brc|323}} electric multiple unit (EMU).

The busier stations (East Didsbury, Gatley and Heald Green) are served by an additional third express train every hour.

Early morning, late evening and peak services sometimes make additional stops to provide additional services; for example, Gatley is served by a Blackpool North train at 07:43 on Sunday mornings.

Mauldeth Road, Burnage and Heald Green are served exclusively by Northern Trains.

East Didsbury is also served by Transport for Wales Rail and Gatley is also served by TransPennine Express services.{{NRtimes|December 2022|85}}

class="wikitable"

|+ Styal line off-peak services (as of December 2021)

Station{{abbr|tph|trains per hour}}Stopping servicecolspan="2"|Express servicecolspan="2"|Additional express service
{{rws|Mauldeth Road}}2rowspan="7"|Half hourly 'stopping' service
{{rws|Crewe}} to {{rws|Manchester Piccadilly}}
{{rws|Manchester Airport}} to {{rws|Liverpool Lime Street}}
calling at all stations on the Styal line
|
{{rws|Burnage}}2|
{{rws|East Didsbury}}3style="background:#{{National Rail colour|Transport for Wales Rail}}; color:white; width:10px;"|{{rws|Manchester Airport}} to {{rws|Llandudno}}
(Transport for Wales)
style="background:#{{Northern colour|Barrow-Manchester Airport}}; color:white; width:10px;"|{{rws|Manchester Airport}} to {{rws|Barrow-in-Furness}}/{{rws|Windermere}}
{{rws|Gatley}}3style="background:#{{Northern colour|Barrow-Manchester Airport}}; color:white; width:10px;"|{{rws|Manchester Airport}} to {{rws|Barrow-in-Furness}}/{{rws|Windermere}}style="background:#{{National Rail colour|TransPennine Express}}; color:white; width:10px;"|{{rws|Manchester Airport}} to {{rws|Saltburn}}
(TransPennine Express)
{{rws|Heald Green}}3style="background:#{{Northern colour|Blackpool-Manchester Airport}}; color:white; width:10px;"|{{rws|Manchester Airport}} to {{rws|Blackpool North}}style="background:#{{Northern colour|Barrow-Manchester Airport}}; color:white; width:10px;"|{{rws|Manchester Airport}} to {{rws|Barrow-in-Furness}}/{{rws|Windermere}}
{{rws|Manchester Airport}}7style="background:#{{National Rail colour|Northern Trains}}; color:white; width:10px;" |to {{rws|Barrow-in-Furness}}, {{rws|Blackpool North}} and {{rws|Llandudno}}style="background:#{{National Rail colour|TransPennine Express}}; color:white; width:10px;"|to {{rws|Redcar Central}}, Edinburgh and {{rws|Glasgow Central}}
{{rws|Styal}}1||

= Express services =

TransPennine Express run through services, via Manchester Piccadilly, from across the north of England; these include to {{rws|Redcar Central}}, via {{rws|Leeds}} and {{stnlnk|York}}, operated by Class 185s. Their trains also operate from {{stnlnk|Glasgow Central}}/{{rws|Edinburgh Waverley}} (both two-hourly) via Preston and Manchester Piccadilly.{{cite web |title = Timetables {{vbar}} Download timetables {{vbar}} TransPennine Express |url = https://www.tpexpress.co.uk/travel-updates/timetables |publisher = TransPennine Express |access-date = 10 February 2025}} These were operated by Class 185 diesel multiple units until December 2013, when they were replaced with Class 350 EMUs.{{cite web |title = New Rolling Stock for London Midland and for First TransPennine Express |url = http://www.londonmidland.com/about-us/latest-news/news-archive/2011/09/new-rolling-stock-for-london-midland-and-for-first-transpennine-express/|publisher = London Midland | archive-url=https://web.archive.org/web/20130927142442/http://www.londonmidland.com/about-us/latest-news/news-archive/2011/09/new-rolling-stock-for-london-midland-and-for-first-transpennine-express/ |access-date = 15 December 2022| archive-date=27 September 2013 }} which were transferred to London Northwestern Railway in 2020, following replacement by Class 397 EMUs.

Transport for Wales Rail run an hourly service between the Airport and {{stnlnk|Llandudno}} via {{rws|Chester}}, using Class 197 units.{{cite web|url=https://tfw.wales/sites/default/files/2024-12/8_Holyhead-Llandudno-Chester-Manchester_December-2024_V1.pdf|title=Transport for Wales North Wales services December 2024-June 2025}}

See also

References

=Citations=

{{reflist}}

=Sources=

  • {{cite book |last1=Haywood |first1=Russ |title=Railways, Urban Development and Town Planning in Britain: 1948-2008 |date=2009|publisher=Ashgate Publishing Ltd. |isbn=9780754673927 |url=https://books.google.com/books?id=vWhpkyrFvjAC&dq=Manchester%20Airport%20station%201993&pg=PA237 |access-date=19 June 2018 |language=en}}