Sundance Power Station
{{Infobox power station
|name = Sundance Power Station A & B
|image =
|image_caption =
|country = Canada
|location = Lake Wabamun, Alberta
| coordinates = {{coord|53|30|27|N|114|33|26|W|type:city_region:CA-AB|display=inline,title}}
|owner = TransAlta Corp.
|status = O
|th_fuel_primary = Coal
|th_combined_cycle =
|commissioned = 1970–1980
|decommissioned =
}}
Sundance Power Station is a gas fired station (previously a coal fired station) owned by TransAlta Corp., located 70 km west of Edmonton, Alberta, Canada on Lake Wabamun. It comprised six units (two 280 MW units and four larger units); both 280 MW units were taken out of service in mid-December 2010 and determined to be beyond economic repair.{{cite web |url=http://www.transalta.com/newsroom/news-releases/2011-02-08/transalta-issues-notice-termination-sundance-1-and-2-power-purchas |title=TransAlta issues notice of termination for Sundance 1 and 2 Power Purchase Arrangement {{!}} TransAlta |website=www.transalta.com |url-status=dead |archive-url=https://web.archive.org/web/20110214140549/http://www.transalta.com/newsroom/news-releases/2011-02-08/transalta-issues-notice-termination-sundance-1-and-2-power-purchas |archive-date=2011-02-14}} A legal battle between the owner of the PPA (TransCanada) ensued, which forced the two units to come back on line after replacement of the two boiler units. As of Dec 2013 both units had returned to production.
Units 1 and 2 operated under a 100% power purchase agreement with Alberta, known as 'Sundance A'. In August 2000 TransCanada purchased the rights to the production from Sundance A and B.[http://www.transcanada.com/pdf/power/sundance.pdf Data Sheet] {{Webarchive|url=https://web.archive.org/web/20110716024359/http://www.transcanada.com/pdf/power/sundance.pdf |date=2011-07-16 }} Coal for the station was sourced from the TransAlta Highvale Coal Mine that is adjacent to the power station.
Description
The Sundance Power Station consists of six units, of which four were upgraded during the 2001-2012 period. Several units went through upgrades in 2009.{{cite web|url=http://www.transalta.com/facilities/plants-operation/sundance |author=TransAlta |title=Sundance |date=March 10, 2011 |accessdate=February 28, 2012}}
Unit Commissioning dates consist of:[http://www.transcanada.com/pdf/power/sundance.pdf Plant Description] {{Webarchive|url=https://web.archive.org/web/20110716024359/http://www.transcanada.com/pdf/power/sundance.pdf |date=2011-07-16 }}
- Unit 1, 280 MW – 1970 (Retired January 1, 2018);
- Unit 2, 280 MW – 1973 (Retired July 31, 2018);
- Unit 3, 368 MW – 1976 (Retired July 31, 2020);
- Unit 4, 406 MW – 1977 (Converted to natural gas January 1, 2022);
- Unit 5, 406 MW – 1978 (Suspended September 28, 2021);
- Unit 6, 401 MW – 1980 (Converted to natural gas February 1, 2021);{{Cite web|url=https://transalta.com/plants-operation/sundance/|title=Sundance}}
The boilers are supplied by Combustion Engineering and the turbines/generator are supplied by AEI, GEC, or EE.{{usurped|1=[https://archive.today/20121205091754/http://www.industcards.com/st-coal-canada.htm Coal Fired Power Plants in Canada - Power Plants Around the World]}}
The plant features three large smokestacks each approximately 156 m (510 ft) in height.
Unit 3 has been mothballed, and was retired in 2020.{{cite web |title=First grid-scale battery storage project in Alberta, Canada, comes online this month |url=https://www.energy-storage.news/news/first-grid-scale-battery-storage-project-in-alberta-canada-comes-online-thi |website=Energy Storage News |language=en |date=6 August 2020}}
Unit 4 will be retired April 1, 2022.{{cite web |title=TransAlta Establishes Renewables Growth Targets and Declares Dividend Increase of 11% |url=https://transalta.com/newsroom/news-releases/transalta-establishes-renewables-growth-targets-and-declares-dividend-increase-of-11/ | language=en | date=28 September 2021}}