Tete Province
{{short description|Province of Mozambique}}
{{Infobox settlement
| name = Tete
| native_name =
| native_name_lang =
| settlement_type = Province
| image_skyline = Cahorra bassa.jpg
| imagesize =
| image_alt =
| image_caption =
| image_flag =
| flag_size =
| flag_alt =
| image_seal =
| seal_size =
| seal_alt =
| image_shield =
| shield_size =
| shield_alt =
| image_blank_emblem =
| blank_emblem_type =
| blank_emblem_size =
| blank_emblem_alt =
| nickname =
| motto =
| image_map = Tete Province in Mozambique 2018.svg
| mapsize = 250px
| map_alt =
| map_caption = Tete, Province of Mozambique
| image_map1 =
| mapsize1 =
| map_alt1 =
| map_caption1 =
| subdivision_type = Country
| subdivision_name = Mozambique
| subdivision_type1 =
| subdivision_name1 =
| subdivision_type2 =
| subdivision_name2 =
| established_title =
| established_date =
| founder =
| named_for =
| seat_type = Capital
| seat = Tete
| government_footnotes =
| government_type =
| leader_party =
| leader_title = Governor
| leader_name = Unknown
| leader_title1 =
| leader_name1 =
| total_type =
| unit_pref =
| area_magnitude =
| area_footnotes =
| area_total_km2 = 98417
| area_total_sq_mi =
| area_total_dunam =
| area_land_km2 =
| area_land_sq_mi =
| area_water_km2 =
| area_water_sq_mi =
| area_water_percent =
| area_note =
| elevation_footnotes =
| elevation_min_m =
| elevation_max_m =
| population_footnotes =
| population_total = 2648941
| population_as_of = 2017 census
| population_density_km2 = auto
| population_density_sq_mi =
| population_est =
| pop_est_as_of =
| population_demonym =
| population_note =
| timezone1 =
| utc_offset1 =
| timezone1_DST =
| utc_offset1_DST =
| postal_code_type = Postal code
| postal_code = 23xx
| area_code = (+258) 252
| blank_name_sec1 = HDI (2019)
| blank_info_sec1 = 0.407{{Cite web|url=https://hdi.globaldatalab.org/areadata/shdi/|title=Sub-national HDI - Area Database - Global Data Lab|website=hdi.globaldatalab.org|language=en|access-date=2018-09-13}}
{{color|#900|low}} · 10th of 11
| website = {{URL|http://www.tete.gov.mz/}}
| footnotes =
| official_name =
}}
Tete is a province of Mozambique, located in the northwest of the country. It has an area of 98,417 km2 and a population of 2,648,941 (2017 census).{{cite web|url=http://www.ine.gov.mz/Ingles/o_pais/populacao_total_prov |title=Total Population By Provinces - 2006 |access-date=2008-06-15 |work=Instituto Nacional de Estatística |url-status=dead |archive-url=https://web.archive.org/web/20071124164020/http://www.ine.gov.mz/Ingles/o_pais/populacao_total_prov |archive-date=November 24, 2007 }}
Tete is the capital of the province. The Cahora Bassa Dam is situated in this province.
Districts
On March 21, 2013, Mozambique's Assembly of the Republic authorized the creation of 13 new districts throughout the nation. Two were added to Tete.{{cite web|work=allafrica.com|date=21 March 2013|title=Mozambique Bill Creating New Districts Passed|url=http://allafrica.com/stories/201303211346.html}} Tete Province's districts include:
Demographics
{{Historical populations|1980|831,000 |1997|1,226,008|2007|1,807,485|2017|2,648,941|align=none|percentages=pagr|footnote=source:[http://www.citypopulation.de/Cameroon-Cities.html Cameroon: Administrative Division population statistics]}}
Tete Fossil Forest
A fossil site of global significance covers almost 1500 square km of the region. Well-preserved fossil wood from the Late Permian provides an insight into the flora of the area just prior to the end-Permian mass extinction. Many species are recorded, notably of conifers, all within the Matinde Formation which comprises sandstones, siltstones and coal beds. Marking its importance, the International Union of Geological Sciences has included the site within its 'First 100 IUGS Geological Heritage Sites' list, published in October 2022.{{cite web |title=Late Permian Tete Fossil Forest |url=https://iugs-geoheritage.org/videos-pdfs/iugs_first_100_book_v2.pdf |website=IUGS International Commission on Geoheritage |publisher=IUGS |access-date=2 November 2022}} The forest is located in the district of Magoé, between Cahora Bassa and Magoé and approximately 250 km west of the city of Tete.
Coal resources
= History of coal discovery =
In 1859 Richard Thornton completed the first studies of coal occurrence in the Tete Province as part of an exhibition under Dr. David Livingstone.Hatton & Fardell (2011) ' 'New discoveries of coal in Mozambique: development of the coal resource estimation methodology for international resource reporting standards' '. International Journal of Coal Geology. Article in Press. In his report from the trip, Mr. Thornton stated that the coal, which was dug by natives from an outcropping seam on the bank of the River Muntizi, showed no tendency to cake; was free-burning; contained very little sulphur or iron although a large proportion of ash along with a small amount of gaseous matter Richard Thornton (1859, February 23). ' 'On the coal found by Dr. Livingstone at Tete, on the Zambesi, South Africa' '. Proceedings of the Geological Society. Lyell Collection.
= Coal reserves =
File:Moatize Coal Mine, Tete Province, Mozambique.jpg
The Tete Province is reported to host coal reserves of approximately 6.7 billion tons, of which 3 billion tons represent sub-economic or economic grades.ENRC (2009) ' 'Exploration Report on Licenses in the Tete Province, Cahora Bassa District, Mozambique' '. ENRC Internal Company Report. Tete, Mozambique. The province was then regarded geologically as the largest undiscovered coal province in the world and it is estimated that the Province could be producing 25% of the world's coking coal by 2025.{{cite news|work=The International Resource Journal|year=2011|title=Talking Tete - Mozambique's new mining epicentre|access-date=October 27, 2011|url=http://www.internationalresourcejournal.com/mining/mining_july_11/mozambique_s_new_mining_epicentre.html|archive-date=August 4, 2016|archive-url=https://web.archive.org/web/20160804111813/http://www.internationalresourcejournal.com/mining/mining_july_11/mozambique_s_new_mining_epicentre.html|url-status=dead}}
== Moatize coal deposit ==
The largest coal reserve presently discovered in the Tete Province is the Moatize metallurgical and thermal coal deposit which contains 2.4 billion tons of coal and is located with the Moatize sub-basin.ENRC (2009) ' 'Exploration Report on Licenses in the Tete Province, Cahora Bassa District, Mozambique' '. ENRC Internal Company Report. Tete, Mozambique. Vale SA bid US$122.8 million for exploration and development rights of the project in 2008.International Finance Corporation (2008). ' 'Mozambique: Moatize Coal Deposit' '. International Finance Corporation Infrastructure Advisory Success Stories Report. Washington, DC. Today, the project is a working mine which has now doubled its original output and is producing 22 million metric tons of coal per year{{cite web|work=vale.com|year=2010|title=Expansion of Moatize, Mozambique|access-date=February 2, 2012|url=http://www.vale.com/en-us/o-que-fazemos/mineracao/carvao/projetos/Pages/default.aspx|url-status=dead|archive-url=https://web.archive.org/web/20120203130220/http://www.vale.com/en-us/o-que-fazemos/mineracao/carvao/projetos/pages/default.aspx|archive-date=February 3, 2012}}
= Local coal geology =
Most coal resources are located within the remnants of the Ecca Rock Group, member of the Karoo Supergroup, and are hosted within the Zambezi graben.Cairncross, B. (2001). An overview of Permian (Karoo) coal deposits of Southern Africa. Journal of African Earth Sciences, 33 (3-4), 529-562. The coal seams were formed during the early and late Permian and deposits are associated with non-marine terrestrial clastic sedimentary sequences of the Karoo Supergroup.Cairncross, B. (2001). An overview of the Permian (Karoo) coal deposits of southern Africa. African Earth Sciences, 33, 529-562. Depositional environments were primarily fluvial and deltaic but also included some minor lacustrine and shoreline settings.Cairncross, B. (2001). An overview of the Permian (Karoo) coal deposits of southern Africa. African Earth Sciences, 33, 529-562.
= Coal licenses =
In Mozambique, 95% of coal licenses issued have been granted to forty different companies operating within the Tete Province.{{Cite journal | last1 = Hatton | first1 = William | last2 = Fardell | first2 = Anna | title = New discoveries of coal in Mozambique — Development of the coal resource estimation methodology for International Resource Reporting Standards | journal = International Journal of Coal Geology | publisher = Elsevier | location = Amsterdam | volume = 89 | issue = 1 | pages = 2–12 | year = 1999 | doi = 10.1016/j.coal.2011.02.010 | issn = 0166-5162}} On 29 September 2011 the Mozambican government suspended the issuing of new coal licenses in the Tete Province in order to assess to what extent companies currently hold licenses in the Province and whether they are complying with contracts signed by the government.{{cite web|work=clubofmozambique.com|year=2011|title=Mozambican government suspends granting of coal mining licenses in Tete Province|access-date=26 January 2012|url=http://www.clubofmozambique.com/solutions1/sectionnews.php?secao=mining&id=22943&tipo=one|url-status=dead|archive-url=https://web.archive.org/web/20140826160855/http://www.clubofmozambique.com/solutions1/sectionnews.php?secao=mining&id=22943&tipo=one|archive-date=26 August 2014}}
= Investment in coal development =
A large amount of investment has been made portending to the development of coal resources and infrastructure required for mining and development. The International Finance Corporation, member of the World Bank Group has announced that it will invest up to US$5 million in Baobab Resources Plc's exploration projects with the intention of fostering economic development.{{cite web|work=International Finance Corporation|year=2009|title=ICF Finances Mining Exploration in Mozambique to foster economic growth, Maputo, Mozambique|access-date=January 26, 2012|url=http://appablog.wordpress.com/2009/01/15/mozambique-ifc-finances-mining-exploration-to-foster-economic-growth/}}
File:Queue to cross Tete Suspension Bridge, Mozambique.jpg
In 2011 Vale approved a US$6 billion expansion of its Moatize coal project in order to increase output from 11 million tons per year mined initially to 22 million tons per year.{{cite news|first=Agnieszka|last=Flak|date=November 2011|title=Vale plans $6 billion expansion of Mozambique coal mine, Maputo, Mozambique|newspaper=Reuters|access-date= 25 January 2012|url=https://www.reuters.com/article/us-mozambique-coal-vale-idUSTRE7AL1MH20111122}}
The Mozambican government have undertaken a US$375 million refurbishment of the 600 km rail link between Moatize and BeiraENRC (2009) Exploration Report on Licenses in the Tete Province, Cahora Bassa District, Mozambique. ENRC Internal Company Report. Tete, Mozambique. which was severely damaged during the Mozambican Civil War. Furthermore, a deep-water international port facility is being constructed in Beira. In addition to this port at Beira, a coal terminal at Chinde, north of Beira is being planned by coal producers that will have a 20 million tonne terminal and whose opening will coincide with the beginning of production at the Zambeze Project, owned by Rio Tinto, in 2015.{{cite web|last=Els|first= F.|date=November 22, 2011|title=Coal and ports investments set to transform Mozambique|access-date= January 26, 2012 |url=http://www.mining.com/2011/11/22/new-coal-and-ports-investments-set-to-transform-mozambique/}} The link between Beira Port and the Tete Province is being referred to as the 'Beira Corridor', along which there are now plans to upgrade all major rail freight routes so that they have the capacity to transport coal resources.{{cite news|first=Egon |last= Cossou |date=July 23, 2010|title=Mozambique gambles on trade super highway|work= BBC World Business News|access-date=January 29, 2012 |url=https://www.bbc.co.uk/news/business-10713095}}
= Community impacts =
Local communities have been relocated from their land in order for the development of coal resources to commence. Vale relocated 5,000 people into new 'settlements' in order to develop its projects.{{cite web|last=Murphy|first= A. |year=2011 |title=Mozambique Coal Mine Brings Jobs, Concerns|access-date=January 25, 2012|work=NPR|url=https://www.npr.org/2011/04/27/135629821/mozambique-coal-mine-brings-jobs-concerns}} The 'settlements' offered new housing and infrastructure however, people must pay for any energy which they consume.
Rio Tinto have established the 'Riversdale Training Centre', Tete, where currently 28,300 candidates are registered and 1,172 people have been trained in various civil trades and building.{{cite web|last=Woodley|first= A. |year=2010|title=Riversdale: A new supply of hard coking and thermal coal|access-date=January 26, 2012|work=riotinto.com|url=http://www.riotinto.com/documents/110605_Andrew_Woodley_Riversdale_Mozambique_Coal_Conference_slides.pdf}} At the Moatize Coal Mine, 90% of Vale's employees and contractors are Mozambicans.{{cite web|work=vale.com|year=2010|title=Expansion of Moatize, Mozambique|access-date=February 2, 2012|url=http://www.vale.com/en-us/o-que-fazemos/mineracao/carvao/projetos/Pages/default.aspx|url-status=dead|archive-url=https://web.archive.org/web/20120203130220/http://www.vale.com/en-us/o-que-fazemos/mineracao/carvao/projetos/pages/default.aspx|archive-date=February 3, 2012}}
See also
References
{{reflist}}
External links
- {{in lang|pt}} {{official|http://www.tete.gov.mz/ }}
{{MZ Provinces}}
{{Authority control}}
{{coord|15|30|S|32|30|E|display=title}}