Traffic Bridge

{{Short description|Bridge in Saskatoon, Saskatchewan, Canada}}

{{Use Canadian English|date=January 2022}}

{{Use mdy dates|date=January 2022}}

{{Infobox Bridge

|bridge_name = Traffic Bridge

|image = Traffic Bridge November 2018.jpg

|caption = Replica Traffic Bridge over the South Saskatchewan River

|official_name = Traffic Bridge

|other_name = Victoria Bridge
19th Street Bridge
3rd Avenue Bridge
Iron Bridge
Black Bridge
Short Hill Bridge

|carries = 2 lanes of Victoria Avenue/3rd Avenue South

|crosses = South Saskatchewan River

|locale = Saskatoon, Saskatchewan, Canada

|maint = City of Saskatoon

|id =

|designer = Saskatchewan Department of Public Works

|builder = (original) John D. Gunn and Sons Ltd.; (replica) Graham Construction & Engineering Inc.

|fabricator = Canadian Bridge Company/McDiarmid Company

|design = Parker truss bridge

|material = Steel, wood, concrete

|spans = (original) 5; (replica) 4

|pierswater = 3

|mainspan =

|length = {{convert|289.8|m|ft}}

|width = {{convert|5.95|m|ft}}

|height =

|load =

|clearance =

|below =

|traffic =

|begin = (original) August 1906; (replica) August 2016

|complete = (original) October 10, 1907; (replica) October 2, 2018

|open = (original) October 10, 1907; (replica) October 3, 2018

|closed = (original) August 24, 2010

|toll =

|preceded = Senator Sid Buckwold Bridge

|followed = Broadway Bridge

|map_cue =

|map_image =

|map_text =

|map_width =

|coordinates = {{coord|52|7|18|N|106|39|48|W|region:CA|display=inline,title}}

|lat =

|long =

}}

The Traffic Bridge is the name given to two truss bridges constructed across the South Saskatchewan River, connecting Victoria Avenue to 3rd Avenue South and Spadina Crescent in Saskatoon, Saskatchewan, Canada. The original bridge opened on October 10, 1907, and was the first bridge to carry motor vehicle traffic in Saskatoon, replacing an unreliable ferry service. The promised construction of the bridge was considered a prime factor in the amalgamation of the towns of Saskatoon, Nutana and Riversdale into one city named Saskatoon. The Traffic Bridge was the only road bridge in Saskatoon until 1916, when the University Bridge was completed.{{cite web

|url = http://www.tpcs.gov.sk.ca/TrafficBridge

|title = Statement of Heritage Significance – Traffic (Victoria or 19th Street) Bridge, Saskatoon

|last = Herrington

|first = Ross

|publisher = Ministry of Tourism, Parks, Culture and Sport

|format = PDF

|date = 2008-03-02

|accessdate = 2012-04-03}} In 2010, the bridge was permanently closed due to severe corrosion and was demolished by 2016.{{cite news |url=http://www.cbc.ca/news/canada/saskatoon/saskatoon-old-traffic-bridge-torn-down-1.3854390 |title=Teardown begins on last section of old Traffic Bridge |work=CBC News |date=2016-11-17 |accessdate=2017-03-08}}

A new truss bridge, a near-replica of the original except with fewer steel spans and a wider road bed, was constructed on the same site after the original bridge was closed.{{cite news |url=http://www.cbc.ca/news/canada/saskatoon/new-span-set-to-go-up-at-site-of-old-traffic-bridge-in-saskatoon-1.3739868 |title=New span set to go up at site of old Traffic Bridge in Saskatoon |work=CBC News |date=2016-08-29 |accessdate=2017-03-08}} It opened on October 3, 2018.{{cite news |url=https://www.cbc.ca/news/canada/saskatoon/bundle-up-for-bridge-opening-celebrations-today-1.4846683 |title=Traffic Bridge opens to vehicles tomorrow morning |publisher=CBC News |date=2018-10-02 |accessdate=2018-10-02}}

Names

The bridge is known both popularly and in official correspondence as the Traffic Bridge, originally distinguishing it from the QLLS/CN railway bridge just upstream and later becoming a proper noun in its own right (the railway bridge was built in 1890 and demolished in 1965 when the rail line and downtown yards were removed; the Senator Sid Buckwold Bridge now crosses the river at its former location). Although it is Saskatoon's oldest bridge, it was never formally named until it was nearly a century old. On January 22, 2007, Saskatoon City Council voted to officially name it the "Traffic Bridge", on the recommendation of the Municipal Heritage Advisory Committee, as a way to acknowledge its historic character and the vital role it played in the city's early history. This name was retained for the replacement bridge that opened in October 2018.

The original bridge was referred to by various other names since its construction (see infobox). The most popular name is Victoria Bridge, given that Victoria Avenue runs right up to the bridge's south end. It has been called the 19th Street Bridge, although 19th Street actually passes two blocks north of the bridge and connects with the northwest end of Broadway Bridge (this name made more sense prior to the construction of Broadway Bridge, when the streetcar line came down 19th street before turning onto the bridge) and the 3rd Avenue Bridge, as that is its continuation on the north end of the bridge. Due to its colour, it was also called the Black Bridge, although a later paint scheme was a rather dark grey. It was also sometimes called the Iron Bridge and even the Short Hill Bridge after the Short Hill, down which Victoria Avenue comes (as opposed to "Long Hill" which was a longer route down the same hill originally used by street cars.

File:2024 08 25 IMG 6668.JPG

History

File:VictoriaBridgeSaskatoon.jpg

The Traffic Bridge came into being when residents of Nutana agreed to merge with the town of Saskatoon and the village of Riversdale to form a city. As a condition of their joining with the other two communities, they demanded that a bridge be built for foot and vehicular traffic. Up to then, the only way to cross the river was on an unreliable ferry, or a difficult and sometimes dangerous walk across the QLLS railway bridge.{{cite news |url=http://cjme.com/article/194343/historic-anniversary-last-train-crossing-main-saskatoon-bridge |title=Historic anniversary of last train crossing main Saskatoon bridge |last=Kolojay |first=Trelle |work=980 CJME |date=2014-10-05 |accessdate=2016-10-28 |archive-url=https://web.archive.org/web/20161029045624/https://www.cjme.com/article/194343/historic-anniversary-last-train-crossing-main-saskatoon-bridge |archive-date=2016-10-29}} The province provided funding and John Gunn and Sons was selected as the contractor.{{cite web |url = http://www.tpcs.gov.sk.ca/BridgeInventory |title = Saskatchewan Road and Railway Bridges to 1950: Inventory |last = Herrington |first = Ross |publisher = Ministry of Tourism, Parks, Culture and Sport |format = PDF |date = 2007-03-31 |accessdate = 2011-04-03 |archive-url=https://web.archive.org/web/20110716150150/http://www.tpcs.gov.sk.ca/BridgeInventory |archive-date=2011-07-16}} On October 10, 1907, the Traffic Bridge officially opened.{{cite web

|url = http://www.scs.sk.ca/saskatoon100/students/crosswords/PDF%20SUpport%20Docs/SaskatoonHistoryto1914.pdf

|title = A History of Saskatoon to 1914

|last = Jeff

|first = O'Brien

|publisher = City of Saskatoon – Archives

|date = July 2005

|accessdate = 2011-04-03}}

Less than a year after it opened, on June 7, 1908, the bridge became the site of Saskatoon's only shipping disaster, when a steamboat called the SS City of Medicine Hat crashed into one of the bridge's piers and sank; all aboard managed to make it to safety.{{cite web |url = http://www.saskatoon.ca/DEPARTMENTS/Community%20Services/Communitydevelopment/Documents/cc_south.pdf |title = The South Saskatchewan River and the Development of Early Saskatoon 1881–1908: A Historical Narrative |last = Delainey |first = William P. |date = April 23, 2007 |accessdate = 2012-04-03 |archive-url=https://web.archive.org/web/20110409085556/http://www.saskatoon.ca/DEPARTMENTS/Community%20Services/Communitydevelopment/Documents/cc_south.pdf |archive-date=2011-04-09}} This accident marked the end of steamboat traffic on the river. An anchor presumed to be the SS City of Medicine Hat's was located in August 2006 by divers training just downstream, near the Broadway Bridge.{{Cite news |date=September 14, 2006 |title=Anchor believed to have come from historic wreck |url=https://www.cbc.ca/news/canada/saskatchewan/anchor-believed-to-come-from-historic-wreck-1.584042 |work=CBC News}} This discovery led to a full-scale, five-day underwater excavation, which was conducted from September 8 to 12, 2008. A number of artifacts were uncovered from the water. A documentary film, titled "The Last Steamship: The Search for the SS City of Medicine Hat" was created in 2010 about the wreck and the search. More artifacts were unearthed in 2012 underneath Rotary Park, where the river used to run until it was covered by landfill to create the park in the 1960s.{{cite news

|url = http://www.newstalk650.com/story/artifacts-historical-shipwreck-found-south-sask-river/83788

|title = Artifacts from historical shipwreck found in South Sask. River

|last = McAdam

|first = Bre

|work = News Talk 650 CKOM

|publisher = Rawlco Communications

|date = November 15, 2012

|accessdate = 2012-11-15}}{{cite news

|url = https://thestarphoenix.com/life/City+Saskatoon+announces+discovery+City+Medicine+remains/7553468/story.html

|title = City announces discovery of S.S. City of Medicine Hat remains

|last = Hutton

|first = David

|work = The StarPhoenix

|publisher = Postmedia Network

|date = November 15, 2012

|accessdate = 2012-11-15}}{{cite news

|url = https://www.cbc.ca/news/canada/saskatchewan/wreckage-from-lost-saskatoon-steamship-unveiled-1.1238350

|title = Wreckage from lost Saskatoon steamship unveiled

|publisher = CBC News

|date = November 15, 2012

|access-date = 2015-11-15}}

Two roadways cut out of the riverbank are often associated with the Traffic Bridge. Short Hill referred to the steep rise up the east bank from the foot of the bridge along Victoria Avenue. The grade was too steep for most wagon teams, as well as the streetcars that began operation in 1913.{{cite web

|url = http://www.city.saskatoon.sk.ca/org/city_history/river/short.asp

|title = Riveredge – The Short Hill, 1914

|work = City History

|publisher = City of Saskatoon

|accessdate = 2007-10-18

|archiveurl = https://web.archive.org/web/20050319062600/http://www.city.saskatoon.sk.ca/org/city_history/river/short.asp

|archivedate = 2005-03-19

}} Long Hill referred to the more gradual slope up the east riverbank from the foot of the bridge to the end of 12th Street, around where the end of the Broadway Bridge is today. This road followed the old ferry road up the bank along what is now Saskatchewan Crescent. Even the Long Hill was difficult for streetcars; in March 1922, a streetcar derailed when it slid off ice-covered tracks while attempting to turn onto the bridge.{{cite web

|url = http://www.city.saskatoon.sk.ca/org/city_history/river/long.asp

|title = Riveredge – The Long Hill, 1915

|work = City History

|publisher = City of Saskatoon

|accessdate = 2007-10-18

|archiveurl = https://web.archive.org/web/20050319092608/http://www.city.saskatoon.sk.ca/org/city_history/river/long.asp

|archivedate = 2005-03-19}}

The 2 metre-wide pedestrian walkway was added on the upstream side of the bridge in 1908. In 1961, the southern end of the bridge was raised to reduce the slope on the Short Hill and to improve traffic flow, allowing Saskatchewan Crescent to pass underneath the bridge. The bridge carried approximately 10,000 vehicles per day.

The bridge was repainted in 1979, albeit as little or no surface preparation was done the work was of dubious structural benefit. Beginning in the 1980s, the bridge started to show its age and needed to be closed periodically for refurbishment. Some adjustments were also made to widen the roadway, as many modern motorists were experiencing difficulty crossing the bridge. It was also closed for extended periods of time in the early 1990s when City of Saskatoon work crews damaged the bridge twice by driving over the bridge with vehicles too heavy or too large for the bridge specifications.

Closures

=Temporary (2005–2006)=

On September 6, 2005, the City of Saskatoon closed the bridge for inspection, in preparation for planned upgrades to the roadway (including the installation of the city's first roundabout (since the removal of the "traffic circle" on 8th Street a decade earlier) just off the north end of the bridge) in anticipation of an adjacent riverfront development (River Landing). On November 2, the bridge was closed indefinitely to vehicular traffic upon completion of the inspection, due to corrosion and other factors. The bridge was re-opened on September 8, 2006, following repairs that cost $500,000. The bridge remained open to pedestrian and bicycle traffic for most of this period. Replacing the bridge instead of repairing it would have cost between $24 and $45 million.{{cite news |url=http://www.canada.com/saskatoonstarphoenix/story.html?id=12bf9854-cfba-46a2-8ec1-444e93ef4ed1&k=44925 |title=Victoria Bridge may reopen |last=Coolican |first=Lori |work=The StarPhoenix |publisher=CanWest |date=February 9, 2006 |accessdate=2012-04-03 |archive-url=https://web.archive.org/web/20120406103543/http://www.canada.com/saskatoonstarphoenix/story.html?id=12bf9854-cfba-46a2-8ec1-444e93ef4ed1&k=44925 |archive-date=2012-04-06}}

Without major repairs, engineers had given the bridge a 20 year life expectancy (either as a vehicle or a pedestrian crossing). The job of sandblasting the bridge to bare metal and re-painting it was made very expensive by the need to keep all sandblasting debris out of the river as the existing paint was lead-based.

The bridge's arches were equipped with several series of decorative LED lights in the summer of 2007. They included a programmable controller that made the lights change colour and move in different patterns. However, the lights proved controversial; they cost the city $462,000, which was almost twice the city's original estimate. They also broke down frequently, fueling further complaints from the public about their high price tag.{{cite news |url=http://www.canada.com/saskatoonstarphoenix/story.html?id=59f83c8b-d21f-4432-8e3a-a1de68888721 |title=Two Traffic Bridge arches strung with lights have gone dark |last=Nickel |first=Rod |work=The StarPhoenix |publisher=CanWest |date=2008-07-07 |accessdate=2012-04-03 |archive-url=https://web.archive.org/web/20160303192033/http://www.canada.com/saskatoonstarphoenix/story.html?id=59f83c8b-d21f-4432-8e3a-a1de68888721 |archive-date=2016-03-03}}

=Permanent closure (2010)=

On August 24, 2010, the City of Saskatoon closed the original Traffic Bridge to vehicles, bicycles and pedestrians following a preliminary inspection which could not conclude that the bridge was safe.

: "When the preliminary inspection results came back this afternoon, the inspectors were not able to certify that the lower steel structural members inspected so far were safe," explained Infrastructure Services General Manager Mike Gutek. "We knew there was corrosion under there, but based on the limits and the extent of the deterioration, and in the interest of public safety, we are closing the bridge indefinitely."{{cite web

|url = http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/TrafficBridgetobeClosedImmediatelyUntilFurtherNotice.aspx

|title = Traffic Bridge Closed Immediately Until Further Notice

|publisher = City of Saskatoon

|date = August 24, 2010

|accessdate = 2012-04-03

|url-status = dead

|archiveurl = https://web.archive.org/web/20100829051441/http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/TrafficBridgetobeClosedImmediatelyUntilFurtherNotice.aspx

|archivedate = August 29, 2010

}}

According to Mayor Don Atchison on August 25, 2010, "The bridge is going to collapse. It's imminent that is going to collapse," further comparing it to the I-35W Mississippi River bridge collapse of 2007.{{cite web

|url = http://www.globalnews.ca/uncertain+future+for+traffic+bridge/82702/story.html

|title = Uncertain future for Traffic Bridge

|last = Hutton

|first = David

|work = The StarPhoenix

|publisher = Postmedia Network

|date = 2010-08-27

|accessdate = 2012-04-03}} The bridge's closure initially led to traffic tie-ups leading into the downtown, which were feared to be long-term if the bridge was not repaired or replaced.{{cite web

| url = http://www2.canada.com/story.html?id=3444507

| title = Frustrated by bridge backlogs?

| last = Warren

| first = Jeremy

| work = The StarPhoenix

| publisher = Postmedia Network

| date = August 26, 2010

| accessdate = 2012-04-03}} A 2010 poll conducted by Insightrix Research showed that the public was split over to repair or replace the bridge.{{cite web

| url = http://www.globalsaskatoon.com/public+split+options+traffic+bridge+poll/3694309/story.html

| title = Public split on options for Traffic Bridge: poll

| last = Hutton

| first = David

| work = The StarPhoenix

| publisher = Postmedia Network

| date = October 19, 2010

| accessdate = 2012-04-03}}

Replacement

=Proposals=

File:Traffic Bridge 2016.jpg

The city commissioned Stantec Consulting to consider options for the future of the Traffic Bridge. The report came up with a number of recommendations, ranging from rehabilitating the existing bridge to replacing it with a new structure.{{cite web|url= http://www.saskatoon.ca/DEPARTMENTS/Infrastructure%20Services/Transportation/TransportationPlanning/Pages/TrafficBridgeReplacement.aspx|title = Traffic Bridge Study|publisher = City of Saskatoon|accessdate = 2012-04-03|url-status = dead|archiveurl = https://web.archive.org/web/20120312091415/http://www.saskatoon.ca/DEPARTMENTS/Infrastructure%20Services/Transportation/TransportationPlanning/Pages/TrafficBridgeReplacement.aspx|archivedate = 2012-03-12}} City council voted to eliminate any options that removed vehicle traffic from the bridge. After a series of public meetings and online surveys, the city administration recommended that the bridge be demolished and replaced with a modern steel truss bridge, but one of similar design to the original.{{cite web| url = http://www.globalsaskatoon.com/tear+down+traffic+bridge+build+modern+replica+report/88658/story.html| title = Tear down Traffic Bridge, build modern replica: city report recommends| last = Hutton| first = David| work = The StarPhoenix| publisher = Postmedia Network| date = November 18, 2010| accessdate = 2012-04-03}} On December 6, 2010, city council voted 8–3 to proceed.{{cite web| url = http://www.globalsaskatoon.com/bridge+to+be+replaced/90233/story.html| title = Bridge to be replaced| last = Hutton| first = David| work = The StarPhoenix

| publisher = Postmedia Network| date = December 7, 2010| accessdate = 2012-04-03}} Although the final design, funding and timeline for construction for the new bridge are yet to be determined, it will be wider and possibly shorter than the existing structure.{{cite web|url = http://www.newstalk650.com/story/20101221/44752|title = Shorter, wider Traffic bridge pondered for Saskatoon

|last = Bosch|first = Jeremy|work = News Talk 650|publisher = Rawlco Radio|date = December 21, 2010|accessdate = 2010-12-21}}{{Citation broken|date=April 2012}} Proposals to salvage sections of the original bridge and its LED lights were scrapped due to cost, as decided by an executive committee in May 2011.{{cite web|url = http://www2.canada.com/saskatoonstarphoenix/news/localstory.html?id=5da25109-ecd3-44e6-8eb4-d66f04c52547|title = Traffic Bridge, $500K lights to be scrapped|last = Hutton|first = David|work = The StarPhoenix|publisher = Postmedia Network|date= May 3, 2011|accessdate = 2012-05-28}}

Funding for the replacement of the Traffic Bridge was announced in 2014.{{cite web |url=http://www.p3canada.ca/~/media/english/press-releases/files/nr-saskatoon%20final%20formatted.pdf |title=Government of Canada and Province of Saskatchewan Announce P3 Funding to Support the North Commuter Parkway and Traffic Bridge Replacement Project |publisher=Infrastructure Canada |date=2014-06-09 |accessdate=2015-06-19}} In 2015, the city's administration said it could save money on the project if restrictions on the design were relaxed.{{cite news |url=http://www.cbc.ca/news/canada/saskatoon/saskatoon-council-to-consider-changes-to-traffic-bridge-design-1.3119794 |title=Saskatoon council to consider changes to Traffic Bridge design |publisher=CBC News |date=2015-06-19 |accessdate=2015-06-19}} Graham Commuter Partners was selected as the contractor, and illustrations of the new bridge were released in October 2015. The new bridge will have four spans instead of the original's five, built on the existing piers which will be reinforced.{{cite web|url = https://thestarphoenix.com/news/traffic+bridge+plan+looks+similar+iconic+original/11438010/story.html

|title = The new Traffic Bridge plan has been released, and looks similar to the iconic original|last = Tank|first = Phil|work = The StarPhoenix|publisher = Postmedia Network|date = 2015-10-14

|accessdate = 2015-10-19}} Construction on the new bridge began in 2016.

=Deconstruction=

Demolition of the bridge first began on May 28, 2012. The pedestrian access ramp on the south side of the bridge was removed first to enable load testing on the piers.{{cite news

|url = http://ckom.com/story/victoria-bridge-deconstruction-begins-monday/58352

|title = Victoria bridge deconstruction begins Monday

|last = Burdeniuk

|first = Trelle

|work = News Talk 650 CKOM

|publisher = Rawlco Communications

|date = May 8, 2012

|accessdate = 2012-05-28}} Work began to tear down the first span on the east bank of the river on October 12, 2012.{{cite news

|url = https://thestarphoenix.com/news/saskatoon/Demolition+begins+parts+Saskatoon+Traffic+Bridge/7382809/story.html

|title = Demolition begins on parts of Saskatoon's Traffic Bridge

|last = Hutton

|first = David

|work = The StarPhoenix

|publisher = Postmedia Network

|date = October 12, 2012

|accessdate = 2012-10-12}} By October 18th, the first span had been severed from the rest of the bridge.{{cite news

|url = https://www.cbc.ca/news/canada/saskatchewan/tear-down-begins-of-rusty-traffic-bridge-in-saskatoon-1.1282457

|title = Tear-down begins of rusty Traffic Bridge in Saskatoon

|publisher = CBC News

|date = October 18, 2012

|access-date = 2012-10-19}} On January 10, 2016, two spans of the bridge were imploded.{{cite web|title=Saskatoon Traffic Bridge explosion felt across the city|url=http://www.cbc.ca/news/canada/saskatoon/saskatoon-traffic-bridge-explosion-felt-across-city-1.3397547|website=CBC News|accessdate=10 January 2016}} The northernmost span was removed by explosives on February 7.{{cite news |url=https://thestarphoenix.com/news/local-news/next-span-of-traffic-bridge-comes-down |title=Next span of Traffic bridge comes down |last=Warick |first=Jason |work=The StarPhoenix |publisher=Postmedia Network |date=2016-02-01 |accessdate=2016-02-07}} The final span of the original bridge was torn down by machinery on November 17, 2016.{{cite news |url=https://thestarphoenix.com/news/local-news/video-last-span-of-saskatoons-historic-traffic-bridge-comes-tumbling-down |title=Video: Last span of Saskatoon's historic Traffic Bridge comes tumbling down |work=The StarPhoenix |date=2016-11-17 |accessdate=2016-11-17}}

=Completion=

The replacement bridge was scheduled to be opened in the fall of 2018.{{cite news

| url = http://www.cbc.ca/news/canada/saskatoon/2-new-saskatoon-bridges-open-fall-2018-1.4078587

| title = 2 new Saskatoon bridges on track to open in fall 2018, city says| publisher = CBC News|date= 2017-04-20| accessdate = 2017-05-02| quote = At the Traffic Bridge site, three of four bridge spans have been installed, and work on the trusses for the final span is expected to be finished over the next two months.}} In late April, 2017, the replacement bridge was half complete. City officials warned thrill-seekers that construction made the water near the bridge extra hazardous.{{cite news | url = http://globalnews.ca/news/3264048/city-of-saskatoon-warns-of-hazards-to-kayakers-underneath-new-traffic-bridge/|title= City of Saskatoon warns of hazards to kayakers underneath new Traffic Bridge|publisher = Global News|last=Kessler|first= Ryan

| date = February 2, 2017| accessdate = 2017-05-02|quote= The construction of the new Traffic Bridge has created a narrow channel with a fast current and people are asked not travel underneath it on the South Saskatchewan River.}}

The new bridge was completed on time and had a public opening ceremony on October 2, 2018. Vehicular traffic was allowed as of October 3, one day after the opening of the Chief Mistawasis Bridge at the north end of Saskatoon.