Train on Train

{{Short description|Japanese concept for train piggybacking}}

{{Use dmy dates|date=January 2021}}

{{Use British English|date=January 2015}}

{{update|inaccurate=y|date=October 2020}}

__NOTOC__

File:Train on Train.JPG

File:JRHokkaidoTrainOnTrain2.jpg

{{Nihongo|"Train on Train"|トレイン・オン・トレイン|Torein on Torein}} is a term used in Japanese rail transport. It refers to the concept of piggybacking, carrying narrow-gauge wagons on broader-gauge flat wagons. "Train on Train" uses a similar concept to Transporter wagons and Rollbocks.

The need for "Train on Train" arose when Japan's Hokkaido Railway Company (JR Hokkaido) was planning for standard-gauge Hokkaido Shinkansen high-speed trains to operate in the undersea Seikan Tunnel from 2016. The problem was that narrow-gauge freight trains did not operate at high speeds. Since the tunnel is 53.85 km (33.46 mi) long, incorporating the slower narrow-gauge trains into the timetable would significantly disrupt the planned high-speed services. It was also considered technically difficult to build new freight train shelters within the Seikan Tunnel. JR Hokkaido would investigate a solution of mounting narrow-gauge freight trains on to faster standard-gauge freight trains.{{cite news | script-title=ja:独自の研究開発 人と物流 高速化に活路 |trans-title=Own R&D leading to increased speed| newspaper = Hokkaido Shimbun | location = Japan | language = Japanese | publisher = The Hokkaido Shimbun Press | date = 20 December 2008 | url = http://www.hokkaido-np.co.jp/cont/shinkansen/45633.html | access-date = 30 September 2009}} JR Hokkaido applied for a patent for train-on-train on February 22, 2006, and has continued research and development to realize a Shinkansen freight train since then.{{Cite web |title=開発は凍結状態 貨車を新幹線に積む「トレイン・オン・トレイン」 - タタールのくにびき -蝦夷前鉄道趣味日誌- |url=https://ishikari210.blog.fc2.com/blog-entry-1377.html |access-date=2024-10-08 |website=ishikari210.blog.fc2.com}} The development of "Train on Train" was effectively frozen in 2015. And the Hokkaido Shinkansen opened on March 26, 2016, without "Train on Train" being put into practical use.

Development

When the Hokkaido Shinkansen opened between {{STN|Shin-Aomori|x}} and {{STN|Shin-Hakodate|x}} in 2016, high-speed Shinkansen trains shared the dual gauge tracks through the Seikan Tunnel which links the main island of Honshu with Hokkaido. While in the tunnel, freight trains on the narrow-gauge {{RailGauge|1067mm}} rails are limited to {{Convert|110|km/h|mph|abbr=on|round=5}}. The "Train on Train" concept involved loading narrow-gauge KoKi 100 container wagons on to specially built standard-gauge wagons to allow operation at speeds of up to {{Convert|200|km/h|mph|abbr=on}}. The speeds in the Seikan Tunnel were reported as having been increased to {{Convert|160|km/h|mph|abbr=on}} after extensive testing in 2014.{{Cite web |date=2014-04-16 |title=東京―新函館4時間10分 北海道新幹線、16年春開業 |url=https://www.nikkei.com/article/DGXNASDG16047_W4A410C1CC1000/ |access-date=2024-10-08 |website=日本経済新聞 |language=ja}}

File:Piggyback by the trainload rather than one wagon at a time is more efficient.gif

The "Train on Train" concept was announced in 2006{{cite news | script-title = ja:JR北海道坂本会長 在来線使い、札幌経由で | trans-title = JR Hokkaido chairman Sakamoto: Using conventional lines via Sapporo | newspaper = Tokachi Mainichi Newspaper | location = Japan | language = Japanese | date = 26 April 2006 | url = http://www.tokachi.co.jp/kachi/0604/04_26.htm | accessdate = 30 September 2009 | url-status = dead | archiveurl = https://web.archive.org/web/20090705133331/http://www.tokachi.co.jp/kachi/0604/04_26.htm | archivedate = 5 July 2009}} and a full-size mockup vehicle was built and demonstrated at {{Ill|Naebo Works|ja|北海道旅客鉄道苗穂工場}} in 2007. While the next phase was to build a prototype train for actual operation this plan was never followed through on.{{Cite web |title=開発は凍結状態 貨車を新幹線に積む「トレイン・オン・トレイン」 - タタールのくにびき -蝦夷前鉄道趣味日誌- |url=https://ishikari210.blog.fc2.com/blog-entry-1377.html |access-date=2024-10-08 |website=ishikari210.blog.fc2.com}} beginning in 2010, JR Freight started developing a new Electric Locomotive, the Class EH800 to run on 20/25 kV AC to operate through the Seikan Tunnel.{{Cite web |author=JR Hokkaido |lang=ja |script-title=ja:整備新幹線小委員会ヒアリング資料 |url=https://www.mlit.go.jp/common/000193032.pdf }} These locomotives would have hauled "Train on Train" services through the tunnel. A "Forum 2050" presentation by JR Hokkaido in 2010 stated that using a "double traverser" arrangement would allow an entire train to be transferred to and from the '"Train on Train" wagons in approximately 10 minutes.{{cite news |date=1 February 2010 |script-title=ja:在来線貨車を10分で新幹線に積み替え可能 |trans-title=Narrow-gauge wagons to be transferred to shinkansen in 10 minutes |url=http://www.hokkaido-np.co.jp/news/bullet_train/213317.html |archiveurl=https://web.archive.org/web/20100204011244/http://www.hokkaido-np.co.jp/news/bullet_train/213317.html |archivedate=4 February 2010 |accessdate=2 February 2010 |newspaper=Hokkaido Shimbun |publisher=The Hokkaido Shimbun Press |location=Japan |language=Japanese}} {{cite magazine| title = JR貨物 新幹線との供用走行専用の新型機関車を導入|trans-title=JR Freight to introduce new locomotives for inter-running with shinkansen|magazine=Tetsudō Daiya Jōhō Magazine | volume = 41| issue = 337| page =70| publisher = Kōtsū Shimbun | location = Japan | date = May 2012}} As of October 2024, the concept of "Train on Train" has not been implemented.

{{clear}}

See also

{{div col|colwidth=23em}}

{{div col end}}

References

{{reflist}}