Trams in Barnaul

{{Expand Russian|topic=transport|Барнаульский трамвай|date=August 2024}}

{{Infobox tram network

| name = Barnaul Tram Network

| native_name = Барнаульский трамвай

| native_name_lang = rus

| system =

| logo =

| logo_width =

| logo_alt =

| image = Депо номер 1 Барнаул.jpg

| image_width = 250px

| image_alt =

| caption =

| locale = Barnaul, Russia

| open = 7 November 1948

| status = Operational

| lines = 8

| owner =

| operator =

| gauge = {{track gauge|1524 mm}}

| propulsion_system = Electricity

| electrification = {{600 V DC|conductor=overhead}}

| depot = 2

| stock =

| pass_year =

| passengers =

| map =

| map_state =

| website =

| era1_name =

| era1_start_year =

| era1_state =

| era1_system =

| era1_status =

| era1_lines =

| era1_owner =

| era1_operator =

| era1_gauge =

| era1_min_curve_radius =

| era1_propulsion_system =

| era1_electrification =

| era1_depot =

| era1_stock =

| era1_total_track_length =

| era1_route_length =

| era1_stops =

| era1_mpassengers =

| era1_map =

| era1_map_state =

| era1_website =

}}

The Barnaul tramway network ({{langx|ru|Барнаульский трамвай}}) is a tram system in the city of Barnaul in the Altai Krai. It was launched into operation on 7 November 1945. As of 2022, there are 8 tram routes in Barnaul, the total length of tracks is 125 km.

The daily transportation volume is about 250 thousand passengers. The fare from 1 May 2024 is 35 rubles (29 rubles via the electronic payment system).{{Cite web |url=https://tk-barn.ru/tarify |title=Тарифы |access-date=2019-01-22 |archive-date=2019-04-19 |archive-url=https://web.archive.org/web/20190419065410/https://tk-barn.ru/tarify |url-status=live }} The main brand of rolling stock is cars manufactured by the Czech ČKD. As of February 2022, partial modernization of Tatra T3 cars is underway.

References

{{reflist}}