Unity Tower
{{short description|High-rise tower in Kraków, Poland}}
{{for|Unity Tower in Missouri|Unity Village, Missouri}}
{{Expand Polish|topic=struct|Unity Tower|date=April 2018}}
{{Infobox building
| name = Unity Tower
| native_name =
| native_name_lang = pl
| logo =
| logo_alt =
| logo_caption =
| image = Unity Tower, front, 2 Lubomirskiego street, Krakow, Poland.jpg
| image_alt =
| image_caption = Unity Tower (2020)
| map_type = Poland
| map_alt = Map
| map_caption = Location of Unity Tower in Poland
| map_size =
| map_dot_label = Unity Tower
| map_dot_mark =
| relief =
| former_names =
| alternate_names =
| etymology =
| status = Complete
| cancelled =
| topped_out =
| building_type = Headquarters of the Main Technical Organization
| architectural_style =
| classification =
| location =
| address = 16-24 Lubomirskiego Street
| location_city = Kraków
| location_country = Poland
| coordinates = {{coord|50|04|05|N|19|57|28|E|region:PL_source:dewiki|display=inline,title}}
| altitude =
| current_tenants =
| namesake =
| groundbreaking_date =
| start_date = 1975–1979 (original)
30 March 2016{{cite news|last1=Ogórek|first1=Piotr|title=Przebudowa "Szkieletora". To już oficjalnie plac budowy|url=http://www.gazetakrakowska.pl/wiadomosci/krakow/a/przebudowa-szkieletora-to-juz-oficjalnie-plac-budowy,9806325/|access-date=2 April 2018|work=Gazetakrakowska.pl|date=30 March 2016|language=pl}}
| stop_date =
| topped_out_date =
| opened_date =
| inauguration_date =
| relocated_date =
| renovation_date =
| closing_date =
| demolition_date =
| cost =
| ren_cost =
| client =
| owner = TreiMorfa
| landlord =
| affiliation =
| height =
| architectural =
| tip =
| antenna_spire =
| roof = {{convert|102.5|m|ft|abbr=on}}
| top_floor =
| observatory =
| diameter =
| circumference =
| weight =
| other_dimensions =
| structural_system =
| material =
| size =
| floor_count = 27
| floor_area =
| elevator_count =
| grounds_area =
| architect = Zdzisław Arct, Ewa Dworzak, Ludwik Konior and Krzysztof Leśnodorski (original)
| architecture_firm = DDJM Biuro Architektoniczne (rebuild)
| developer =
| engineer =
| structural_engineer =
| services_engineer =
| civil_engineer =
| other_designers =
| quantity_surveyor =
| main_contractor = Mostostal (original)
Strabag (rebuild)
| awards =
| designations =
| known_for =
| ren_architect =
| ren_firm =
| ren_engineer =
| ren_str_engineer =
| ren_serv_engineer =
| ren_civ_engineer =
| ren_oth_designers =
| ren_qty_surveyor =
| ren_contractor =
| ren_awards =
| rooms =
| parking =
| website = {{URL|http://www.unitycentre.pl/}}
| embed =
| embedded =
| references =
| footnotes =
}}
Unity Tower (commonly nicknamed the Skeletor ({{langx|pl|{{lang|pl|Szkieletor}}}} {{IPA|pl|ʂkʲɛˈlɛtɔr|}}) prior to completion) is a 102.5 metre high-rise building located in Kraków, Poland. Unity Tower is located near the Mogilskie Roundabout (Rondo Mogilskie) and Kraków University of Economics. It is the second-tallest building in Kraków after K1.
Due to the skeletal appearance of the unfinished building from 1970s to 2010s; the building gained the unofficial nickname Skeletor. The construction finally resumed in 2016 and the construction work of Unity Centre was completed on 30 September 2020.
History
Originally, it was intended to become the regional office of the Main Technical Organization (Naczelna Organizacja Techniczna, NOT) and be named the NOT Tower. The construction of the building was started in 1975, but stopped permanently in 1979 because of economic constraints and political unrest which later culminated in the imposition of martial law in Poland in 1981.{{cite news|url=https://www.fakt.pl/wydarzenia/polska/krakow/krakow-tak-wypieknial-szkieletor/749kkb0#slajd-6|title=Tak wypiękniał "Szkieletor". Wieżowiec jest już prawie gotowy!|access-date=27 August 2020|lang=pl}}
Due to the skeletal appearance of the unfinished building, it was dubbed the Skeletor ({{langx|pl|{{lang|pl|Szkieletor}}}}).{{cite news|url=https://wiadomosci.onet.pl/krakow/historia-krakowskiego-szkieletora-czyli-impotencja-po-polsku/77rekke|title=Historia krakowskiego "Szkieletora", czyli impotencja po polsku|access-date=27 August 2020|lang=pl|trans-title=The story of Kraków's "Szkieletor", or impotence in Polish}}
Investors expressed interest in renovating the building throughout the years. In the 1980s, the building was proposed to house apartments for employees at the Nowa Huta steelworks, and after the fall of communism, a large hotel chain became interested in the facility and wanted to complete the unfinished building, but all these efforts were discouraged by the complicated legal status of the land on which it stood and the high cost of its demolition or adaptation. In 2007, a new plan for the building was put forward, which postulated to increase its height from 92 to as high as 130 meters. German architect Hans Kollhoff was invited to take part in the reconstruction of the building, which was supposed to be completed by the time of UEFA Euro 2012 in Poland and Ukraine. However, the project was rejected by the Provincial Conservation Council on the grounds that the new building was located within a historical urban landscape.{{cite news|url=https://www.bryla.pl/bryla/1,85301,5975261,Szkieletor_jednak_nie_urosnie.html|title=Szkieletor jednak nie urośnie|author=Dawid Hajok|date=21 November 2008|access-date=27 August 2020|lang=pl}}
The building was partially owned by TreiMorfa Project. The long debate about its possible future use based on brand new plans was cut short by the courts in December 2011 because of legal improprieties by its new design team.{{cite web|url=http://krakow.gazeta.pl/krakow/1,35812,10804764,Szkieletor__Decyzja_o_warunkach_zabudowy_uchylona_.html|title=Szkieletor: Decyzja o warunkach zabudowy uchylona!|work=Gazeta.pl, Kraków|lang=pl|archive-url=https://web.archive.org/web/20130325203640/http://krakow.gazeta.pl/krakow/1,35812,10804764,Szkieletor__Decyzja_o_warunkach_zabudowy_uchylona_.html|archive-date=2013-03-25|author=Dawid Hajok|date=12 December 2011|trans-title=Szkieletor: The decision on the development conditions has been repealed!}}
Austrian engineering company Strabag was given the commission to rebuild. The building's floors were removed and replaced, but the steel frame retained and reused. The exterior architecture was inspired by the Art Deco architecture of the 1920s and 30s. The use of grey stone and the architecture was partially inspired by the Maccabees Building.{{cite web|url=http://unitycentre.pl/en/history/#|title=History|lang=en}}
In 2018, before the full reconstruction of the building was completed, the ArchDaily architecture website named Szkieletor as one of "History's Most Notorious Unfinished Buildings" alongside the Palace of the Soviets, Siena Cathedral and Ryugyong Hotel.{{cite news|url=https://www.archdaily.com/897792/historys-most-notorious-unfinished-buildings|title=History's Most Notorious Unfinished Buildings|access-date=27 August 2020}}
Gallery
File:Szkieletor, 2009.jpg|Szkieletor repurposed as a billboard display in 2009
File:Skeletor building in Krakow.jpg|Szkieletor in 2014, with the billboards removed
File:Unity Tower, 31 stycznia 2017.jpg|Under construction in January 2017
File:Unity Tower. 2 Lubomirskiego street, Krakow, Poland.jpg|Unity Tower in 2020
File:20200516 Unity Tower w Krakowie 0929 9982.jpg|Unity Tower upon completion, 2020
File:Unity Tower,, 2 Lubomirskiego street, Krakow, Poland.jpg|View from the Mogilskie Roundabout
See also
References
{{Reflist}}
External links
- {{commons category-inline}}
- {{commons category-inline|Skeletor in Kraków}}
Category:Buildings and structures in Kraków
Category:Office buildings completed in 2020