VR2
{{Infobox road
| country = PRT
| type = VR
| route = 2
| alternate_name = {{langx|pt|Via Rápida 2}}
| map = Mapa Madeira com VR1 e VR2.png
| length_km = 3.7
| direction_a = South
| direction_b = North
| terminus_a = Câmara de Lobos
| terminus_b = Estreito de Câmara de Lobos
|e-road =
}}
The Via Rápida 2 or VR2 (Fast Road 2 in English) is the second motorway on the island of Madeira.
Construction started in 2008{{cite web |url=http://www.dnoticias.pt/impressa/hemeroteca/diario-de-noticias/52940-gr-abre-concurso-para-via-rapida-c-lobosestreito-por-60-milhoes-LXDN52940 |title=Concurso para Via Rápida Cm.ª de Lobos-Estreito por 60 milhoes}}
In 2011, this construction had to stop due to lands owners{{cite web |url=http://www.dnoticias.pt/impressa/hemeroteca/diario-de-noticias/106249-via-rapida-do-estreito-em-risco-de-parar-JLDN106249 |title=Via Rápida do Esteito em risco de parar}} and the financial crisis in Portugal{{cite web |url=http://arquivo.jm-madeira.pt/artigos/r%C3%A1pida-para-o-estreito-pronta-no-final-de-2016 |title=Via Rápida para o Estreito pronta no final de 2016}}
In 2015, the construction resumed with funding from the European Regional Development Fund and it was finally opened in 25 April 2017.{{cite web |url=http://www.dnoticias.pt/madeira/via-rapida-ao-estreito-de-camara-de-lobos-inaugurada-amanha-CK1279004 |title=Via Rápida ao Estreito de Câmara de Lobos inaugurada amanhã}}
With 3,7 km it goes from Câmara de Lobos to Estreito de Câmara de Lobos, providing a fast connection between the downtown of Câmara de Lobos and the North of the same municipality, Jardim da Serra, Estreito de Câmara de Lobos and Covão.
Junctions
{{RJL|date=December 2021}}
There are 4 Junctions and 3 tunnels in total.
class="wikitable"
! Junction ( Nó ) ! Km |
align="center" | 40x40px Fonte da Rocha (Cidade Nova)
| {{center|0,000}} |
align="center" | 56x56px Fonte da Rocha - Pedreira do Barradas
| align="center" | 1,200 |
align="center" | 40x40px Pedreira do Barradas
| {{center|1,300}} |
Fonte da Rocha ( 1 ) – Pedreira do Barradas
| align="center" | 1,300 |
align="center" | 56x56px Covão
| align="center" | 0,335 / 0,390 |
Pedreira do Barradas ( 2 ) – Vargem
| align="center" | 1,500 |
Vargem ( 3 ) – Covão
| align="center" | 1,000 |
Vargem ( 4 ) – Estreito de Câmara de Lobos
| align="center" | 0,900 |
References
{{reflist}}
[http://www.dnoticias.pt/impressa/hemeroteca/diario-de-noticias/59050-tres-obras-de-vulto-fora-da-lista-das-11-prioridades-de-jardim-DQDN59050]
[http://www.dnoticias.pt/hemeroteca/180489-ligacao-via-rapida-ao-centro-de-camara-de-lobos-terminada-no-final-do-ver-FDDN180489]
[http://www.dnoticias.pt/impressa/hemeroteca/diario-de-noticias/73640-camara-de-lobos-AYDN73640]
[http://www.dnoticias.pt/impressa/hemeroteca/diario-de-noticias/61884-cinco-adiamentos-e-tres-obras-novas-CXDN61884]