Vantage Bridge

{{Use mdy dates|date=January 2025}}

{{Infobox Bridge

|bridge_name = Vantage Bridge

|image = Vantage Bridge Scenic View.jpg

|caption =

|carries = {{jct|state=WA|I|90}}

|crosses = Columbia River

|locale = Vantage, Washington

|maint = Washington State DOT

|id = 0006533A0000000

|design = Through arch bridge

|mainspan = {{convert|160|m|ft|abbr=on}}

|length = {{convert|2504|ft|m|1|abbr=on}}{{Cite web|url=https://www.wsdot.wa.gov/publications/manuals/fulltext/M23-09/BridgeList.pdf |title=Bridge List M 23-09 |publisher=Washington State Department of Transportation |page=191 |date=June 2011 |access-date=March 13, 2013}}

|width =

|height = {{convert|22.9|m|ft|abbr=on}}{{Citation needed |date=March 2013 }}

|traffic = 11,916 (2002)

|begin =

|complete = 1962

|dedicated = November 9, 1962

|coordinates = {{coord|46|56|37|N|119|58|02|W|region:US_type:landmark|display=inline,title}}

}}

The Vantage Bridge is a bridge in the U.S. state of Washington. It carries Interstate 90 across the Columbia River, near Vantage and George, Washington. This section of the river is named Wanapum Lake; it is the reservoir formed by Wanapum Dam. The bridge separates the Ginkgo Petrified Forest and Wanapum Recreational Area State Park on the western bank of the Columbia.

The current bridge is the second Vantage Bridge. The first was built in 1927 as part of the Sunset Highway (later US 10), a precursor to I-90. In 1962 the second bridge was built because the reservoir pool backing up behind the new Wanapum Dam would soon overwhelm the old bridge; it was dedicated by the state on November 9, 1962.{{cite news |date=November 9, 1962 |title=State Dedicates Vantage Bridge |page=5 |work=The Seattle Times |agency=Associated Press}} The first bridge was dismantled for reuse. The steel cantilever truss was reused for the Lyons Ferry Bridge, which opened in 1968 to carry SR 261 across the Snake River.{{cite book |last= Dorpat |first= Paul |author2=Genevieve McCoy |title= Building Washington: A History of Washington State Public Works |year= 1998 |publisher= Tartu Publications |isbn= 0-9614357-9-8 |pages= 114}}

The bridge deck is scheduled to be replaced between 2024 and 2027 with seasonal lane closures. It is the first major overhaul since 1982.{{cite press release |date=March 11, 2024 |title=Work to replace I-90 Vantage Bridge deck set to get underway |url=https://wsdot.wa.gov/about/news/2024/work-replace-i-90-vantage-bridge-deck-set-get-underway |publisher=Washington State Department of Transportation |accessdate=March 13, 2024}}

References

{{reflist}}