Vorotan Cascade#Spandaryan Reservoir

{{infobox

| datastyle =border-top:darkblue 2px solid

| data1 = {{Infobox dam

| name = Vorotan Cascade

| name_official =

| image_caption = Locations of the Vorotan Cascade power plants in Armenia

| country = Armenia

| location = Syunik Province

| purpose = Hydroelectricity
Irrigation

| status = O

| construction_began = 1961

| cost =

| owner = ContourGlobal[http://www.hydroworld.com/articles/2014/01/contourglobal-buys-armenia-s-405-mw-vorotan-cascade-hydropower-project.html ContourGlobal buys Armenia's 405-MW Vorotan cascade hydropower project][https://armlur.am/401524/ Որոտանի ՀԷԿ-ի ակտիվների ձեռքբերման գործարքն ավարտվել է][https://www.reuters.com/article/us-armenia-energy-investment-idUSBREA0S1QG20140129 U.S. company buys Armenian power plants in $250 million deal]

| operator = ContourGlobal Hydro Cascade CJSC[https://www.bloomberg.com/research/stocks/private/snapshot.asp?privcapId=247691809 Company Overview of Contour Global Hydro Cascade CJSC]

| website = {{url|www.vorotancascade.am}}

|embed=yes

| image = {{Location map+|Armenia|float = center|border=infobox

|caption =

|places =

{{Location map~|Armenia

|label = Tatev

|position = bottom

|lat_deg=39|lat_min=25|lat_sec=39

|lon_deg=46|lon_min=22|lon_sec=15

|type = landmark

|region = AM

|name = Tatev

}}

{{Location map~|Armenia

|label = Shamb

|position = top

|lat_deg=39|lat_min=26|lat_sec=13

|lon_deg=46|lon_min=09|lon_sec=00

|type = landmark

|region = AM

|name = Shamb

}}

{{Location map~|Armenia

|label = Spandaryan

|position = top

|lat_deg=39|lat_min=38|lat_sec=59

|lon_deg=45|lon_min=51|lon_sec=11

|type = landmark

|region = AM

|name = Spandaryan

}}

}}

}}

| data2 = {{Infobox dam

| name = Spandaryan HPP

| coordinates = {{coord|39|34|25|N|45|54|47|E|type:landmark|display=inline}}

| location = Shaghat

| status = O

| construction_began =

| opening = 1989

| demolished =

| cost =

| dam_type = Embankment type, mixed rockfill and earthfill

| dam_crosses =

| dam_height_foundation= {{convert|89|m|abbr=on}}

| dam_height_thalweg = {{convert|83|m|abbr=on}}

| dam_length = {{convert|315|m|abbr=on}}

| dam_elevation_crest =

| dam_width_crest = {{convert|10|m|abbr=on}}

| dam_width_base =

| dam_volume =

| spillway_count =

| spillway_type =

| spillway_capacity =

| res_name = Spandaryan Reservoir

| res_capacity_total = {{convert|257000000|m3|acre feet|abbr=on}}

| res_capacity_active = {{convert|218000000|m3|acre feet|abbr=on}}

| res_capacity_inactive=

| res_surface = {{convert|10.8|km2|abbr=on}}

| res_max_length = {{convert|7|km|abbr=on}}

| res_max_width = {{convert|3|km|abbr=on}}

| res_max_depth = {{convert|73|m|abbr=on}}

| res_elevation = {{convert|2060|m|abbr=on}}

| res_tidal_range =

| plant_commission =

| plant_decommission =

| plant_type =

| plant_hydraulic_head =

| plant_turbines = 2 X 38 MW

| plant_capacity = 76 MW

| plant_capacity_factor=

| plant_annual_gen = 210 GWh

|embed=yes

| image = Spandaryan HPP (2).JPG

}}

| data3 = {{Infobox dam

| name = Shamb HPP

| coordinates = {{coord|39|26|13|N|46|09|00|E|region:AM_type:landmark_source:kolossus-nowiki|display=inline}}

| location = Shamb

| status = O

| construction_began =

| opening = 1978

| cost =

| dam_type = Concrete spillway dam (Angeghakot Dam)
Embankment dam, sandy gravel and soil (Tolors Dam)

| dam_crosses =

| dam_height_foundation=

| dam_height_thalweg = {{convert|23.4|m|abbr=on}} (Angeghakot Dam)
{{convert|69|m|abbr=on}} (Tolors Dam)

| dam_length = {{convert|188|m|abbr=on}} (Tolors Dam)

| dam_elevation_crest =

| dam_width_crest =

| dam_width_base =

| dam_volume =

| spillway_count =

| spillway_type =

| spillway_capacity =

| res_name = Angeghakot Reservoir
Tolors Reservoir

| res_capacity_total = {{convert|3400000|m3|acre feet}} (Angeghakot Reservoir)
{{convert|96000000|m3|acre feet|abbr=on}} (Tolors Reservoir)

| res_capacity_active = {{convert|80000000|m3|acre feet|abbr=on}} (Tolors Reservoir)

| res_capacity_inactive=

| res_catchment =

| res_surface =

| res_max_length =

| res_max_width =

| res_max_depth =

| res_elevation = {{convert|1651.1|m|abbr=on}}

| res_tidal_range =

| plant_commission =

| plant_decommission =

| plant_type =

| plant_hydraulic_head =

| plant_turbines = 2 X 85.5 MW

| plant_capacity = 171 MW

| plant_capacity_factor=

| plant_annual_gen = 320 GWh

|embed=yes

}}

| data4 = {{Infobox dam

| name = Tatev HPP

| coordinates = {{coord|39|25|39|N|46|22|15|E|type:landmark_region:AM|display=inline}}

| location = Tatev

| status = O

| construction_began =

| opening = 1970

| demolished =

| cost =

| dam_type = Embankment type, sandy gravel

| dam_crosses =

| dam_height_foundation=

| dam_height_thalweg = {{convert|41|m|abbr=on}}

| dam_length = {{convert|107|m|abbr=on}}

| dam_elevation_crest =

| dam_width_crest =

| dam_width_base =

| dam_volume =

| spillway_count =

| spillway_type =

| spillway_capacity = {{convert|312|m3/s|abbr=on}}

| res_name = Tatev Reservoir

| res_capacity_total = {{convert|13600000|m3|acre feet|abbr=on}}

| res_capacity_active = {{convert|1800000|m3|acre feet|abbr=on}}

| res_capacity_inactive=

| res_catchment =

| res_surface =

| res_max_length =

| res_max_width =

| res_max_depth =

| res_elevation = {{convert|1335.4|m|abbr=on}}

| res_tidal_range =

| plant_commission =

| plant_decommission =

| plant_type =

| plant_hydraulic_head = {{convert|568.8|m|abbr=on}}

| plant_turbines = 3 x 52.4 MW Pelton turbines

| plant_capacity = 157.2 MW

| plant_capacity_factor=

| plant_annual_gen = 670 GWh

|embed=yes

}}

}}

The Vorotan Cascade, or the ContourGlobal Hydro Cascade,{{Cite web |url=http://contourglobal.com/asset/vorotan |title=The Vorotan Cascade, or the ContourGlobal Hydro Cascade as it was indeed renamed after the acquisition |access-date=2016-12-02 |archive-url=https://web.archive.org/web/20161124143457/http://contourglobal.com/asset/vorotan |archive-date=2016-11-24 |url-status=dead }} is a cascade on the Vorotan River in Syunik Province, Armenia. It was built to produce hydroelectric power and provide irrigation water. The Vorotan Cascade consists of three hydroelectric power plants and five reservoirs with a combined installed capacity of 404.2 MW. It is one of the main power generation complexes in Armenia.

{{Cite web

| title = Vorotan HPPs Cascadе

| url = http://www.minenergy.am/en/page/450

| publisher = Ministry of Energy and Natural Resources of Armenia

| access-date = 2015-12-12}}

{{Cite web

| title = Vorotan Hydros. Environmental & Social Review Summary

| url = http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/651aeb16abd09c1f8525797d006976ba/e79e83b2de03575485257c7b00755835?OpenDocument

| publisher = International Finance Corporation

| access-date = 2016-03-06}}

History

The planning process of the Cascade began just after the Conference of the State Planning Commission held in 1951. In 1954, it was highlighted that with proper infrastructure and careful planning, Armenia's energetic hydro resources might allow it to become an electricity exporter to neighbouring energy deficit areas like Azerbaijan and Iran. It was anticipated that the activation of the Cascade would cut the import of oil products to the country by half. The design work of the Complex began in 1954 and it was constructed between 1961 and 1989. The Tatev hydroelectric power plant (HPP) was completed in December 1970, the Shamb HPP in 1978, and the Spandaryan HPP] in 1989.{{cite web

| title = The History of Vorotan Complex

| url = http://www.vorotancascade.am/en/history.html

| publisher = Vorotan Complex

| access-date = 9 December 2015

| archive-date = 22 December 2015

| archive-url = https://web.archive.org/web/20151222113225/http://www.vorotancascade.am/en/history.html

| url-status = dead

}} Despite the plans, Azerbaijan was against the import of electricity from Armenia, thus hindering the scheduled renovation and capacity expansion to take place at the end of the 1970s. The Vorotan Cascade continued to supply electricity mainly to non-ferrous metallurgy industry in nearby Agarak.{{citation needed|date=March 2016}}

After Armenia gained independence, the Voratan Cascade belonged to the state-owned energy company Armenergo. In 1997, the Vorotan cascade was separated from Armenergo into a separate state owned company.

{{Cite book

| first1 = Gevorg | last1 = Sargsyan

| first2 = Ani | last2 = Balabanyan

| first3 = Denzel | last3 = Hankinson

| title = From Crisis to Stability in the Armenian Power Sector: Lessons Learned from Armenia's Energy Reform Experience

| url = https://archive.org/details/fromcrisistostab00sarg

| url-access = registration | publisher = World Bank

| year = 2006

| page = [https://archive.org/details/fromcrisistostab00sarg/page/63 63]

| isbn = 9780821365908}}

Modernization of the cascade started in 2003 by help of the €2.7 million grant of the European Union which was used for rehabilitation of the Tatev HPP of the Vorotan Cascade, and the Argel HPP. Rehabilitation works were conducted by Voith Siemens Hydro Power Generation. Next rehabilitation project was launched in 2010, financed by the €51 million credit from the German development bank KfW.

{{Cite news

| title = German Bank Loans Armenia 51 Million Euros to Repair Vital Hydro-Electric Plant

| url = http://asbarez.com/87187/german-bank-loans-armenia-51-million-euros-to-repair-vital-hydro-electric-plant/

| agency = ARKA

| date = 2010-10-21

| access-date = 2016-03-06}}

Rehabilitation works started in 2012.

{{Cite news

| title = KfW's 51 million euro loan to be handed to new owner of Vorotan hydropower plant, minister

| url = http://arka.am/en/news/technology/kfw_s_51_million_euro_loan_to_be_handed_to_new_owner_of_vorotan_hydropower_plant_minister_/

| agency = ARKA

| date = 2015-06-10

| access-date = 2016-03-06}}

In 2015, ContourGlobal purchased the Vorotan Cascade operating company for US$180 million.{{Cite press release

| title = ContourGlobal and the Republic of Armenia Announce Purchase of the Vorotan Hydroelectric Facility

| url = http://www.contourglobal.com/press/1981

| publisher = ContourGlobal

| date = 2015-08-10

| access-date = 2015-12-12

| archive-date = 2015-12-22

| archive-url = https://web.archive.org/web/20151222130457/http://www.contourglobal.com/press/1981

| url-status = dead

}} ContourGlobal has started a six-year refurbishment program to modernize the plants and improve their operational performance, as well as safety, reliability, and efficiency, with the total investment of $70 million.

{{cite web

| title = Воротанский каскад ГЭС в Армении: ом стоительстбо до продажи...

| trans-title = Vorotan Cascade of HPPs in Armenia: from the construction to the sale ...

| url = http://www.kavkazoved.info/news/2015/08/12/vorotanskij-kaskad-ges-v-armenii-ot-stroitelstva-do-prodazhi.html

| publisher = Scientific Society of Caucasian studies

| date= 12 August 2015

| access-date=12 December 2015

| language = ru}}

This is the biggest investment US investment in Armenia. The International Finance Corporation, a member of the World Bank Group, did 20% of the total investment.

Specifications

The Vorotan River has length of {{convert|178|km}}, the fall of {{convert|1223|m}}, and the natural annual flow of {{convert|18.6|m3/s}} for the link of Tatev. The source of the river is on {{convert|3045|m}} of the height and starts like a stream, accepting numerous ponds and streams.

The Vorotan Cascade includes a system of three power plants which are Spandaryan, Shamb and Tatev, and five reservoirs which are Spandaryan, Angeghakot, Tolors, Tatev and a daily regulation reservoir. The Spandaryan Reservoir in the vicinity of Tsghuk and Gorhayq villages, is the starting point of the complex. From there water flows through a pressurized tunnel to the Spandaryan HPP. From the Spandaryan HPP water flows to the Angeghakot Reservoir and continues its journey to the Tolors Reservoir which is located in the area of Sisian and Ayri. From that reservoir the water flows to the Shamb HPP. From Shamb reservoir that was constructed beyond the Shamb HPP water reaches the regulation pool, from where it proceeds to the Tatev HPP via a turbine pipe.

class="wikitable"

|+Power plants of the Vorotan Cascade

Power PlantYearUnitsInstalled Capacity (MW)Coordinates
Spandaryan HPP19892 X 38 MW76{{Coord|39|39|00|N|45|51|00|E|display=inline}}
Shamb HPP19782 X 85.5 MW171{{Coord|39|26|13|N|46|09|00|E|display=inline}}
Tatev HPP19703 x 52.4 MW157.2{{Coord|39|25|39|N|46|22|15|E|display=inline}}
Total7404.2

The Vorotan Cascade is one of the main power generation complexes in Armenia. It provides both peak and base load power. It is used also for the grid stabilization. The Tatev HPP has installed capacity of 157.2 MW, the Shamb HPP has installed capacity of 171 MW, and the Spandaryan HPP has installed capacity of 76 MW. Total installed capacity of Vorotan Cascade is 404.2 MW and it generates 1.16 GWh of electricity annually.

The water stores of the Vorotan Complex are also used for irrigation in nearby village and town areas.

Power stations

===Tatev HPP===

The Tatev HPP is located near the Vorotan village on the left bank of the Vorotan River at the altitude of {{convert|730|m}}.

{{cite web

| url = https://ichd.org/download.php?f=339&fc=Energy_rus_eng.pdf

| title = Directions of Effective Integration of the Energy Systems of the South Caucasus Countries

| year = 2004

| publisher = International Center for Human Development

| pages = 222; 233; 238

| access-date = 2016-03-05}}

It is one of Armenia's largest hydroelectric power plants, with installed capacity of {{convert|157.2|MW}} and annual generation of 670 GWh. Power is generated by three Pelton turbines of {{convert|52.4|MW}} each.

{{cite news

| url = http://www.voithhydro.com/media/hypow_7_09.pdf

| title = Modernization of the Vorotan cascade

| publisher = Voith Hydro

| access-date = 29 January 2011

| archive-url = https://web.archive.org/web/20110717230530/http://www.voithhydro.com/media/hypow_7_09.pdf

| archive-date = 2011-07-17

| url-status = dead}}

The plant is unique has it is the highest-head hydroelectric power plant in the territory of the former Soviet Union and by using Pelton turbines.

The plant includes the Tatev Dam which is a {{convert|41|m|adj=on}} high and {{convert|107|m|adj=on}} embankment type dam of sandy gravel. It includes also the daily regulation reservoir. The dam creates the Tatev Reservoir.

The water intake on the left bank of the Vorotan River has capacity of {{convert|25|m3/s}} and the spillway has total capacity of {{convert|312|m3/s}}. Water runs from the water intake through the {{convert|18|km|adj=on}} long free-flow diversion tunnel to the delivery chamber. The {{convert|139.4|m|adj=on}} long and {{convert|4|m|adj=on}} high tail-water canal is connected with an irrigation water outlet. The pressure chamber has a diameter of {{convert|20|m}} and the threshold level of {{convert|1293.05|m}}. It is connected to the plant by a {{convert|1855|m|adj=on}} pressure conduit, and to the {{convert|80000|m3|acre feet|adj=on}} daily regulation reservoir by the sluice-feeder. The rated head of the plant is {{convert|568.8|m}}.

=Shamb HPP=

The Shamb HPP is located near the village of Shamb on the right bank of the Vorotan River at the altitude of {{convert|1328|m}}. It is one of the largest hydroelectric power plant having an installed capacity of {{convert|171|MW}} and annual generation of 320 GWh.

Shamb HPP includes the Angeghakot and Tolors dams which create the Angeghakot and Tolors reservoirs. The Angeghakot Dam is a {{convert|23.4|m|adj=on}} high concrete spillway dam. The Tolors Dam is a {{convert|69|m|adj=on}} high and {{convert|188|m|adj=on}} long embankment type dam of sandy gravel and soil. The Angeghakot and Tolors reservoirs are connected by a {{convert|10.5|km|adj=on}} free-flow tunnel which has throughput capacity of {{convert|23|m3/s}}. Water runs from the Tolors Reservoir to the plant through a {{convert|6.9|km|adj=on}} diversion pressure tunnel which turns into a {{convert|1260|m|adj=on}} single-lane penstock.

=Spandaryan HPP=

The Spandaryan HPP is located near Shaghat at the altitude of {{convert|1694|m}}. It is the upper hydroelectric power plant on the cascade commissioned in 1989. The plant has an installed capacity of 76 MW and a projected annual electricity generation of 210 GWh.

The Spandaryan Dam creates the cascade's upper reservoir, the Spandaryan Reservoir. The {{convert|83|m|adj=on}} high and {{convert|315|m|adj=on}} long Spandaryan dam is an embankment type, mixed rockfill and earthfill with clayey soiled bottom.

Its water intake infrastructures includes a pressure tunnel, a spillway culvert, and the Vorotan–Arpa tunnel for releasing water into Lake Sevan. The structures have {{convert|30.5|m3/s}}, {{convert|80|m3/s}} and {{convert|15|m3/s}} water outlays respectively. The last, the fourth structure is a surface spillway with a {{convert|160|m3/s}} installed capacity and inclining drop. The pressure tunnel is {{convert|8.2|km}} long and it ends with a surge tank with capacity of {{convert|1900|m3}}. The surge tank is connected to plant by {{convert|2168|m|adj=on}} penstock.

Reservoirs

=Spandaryan Reservoir=

File:Spandaryanresvoir.jpg

Spandaryan Reservoir is located southeast of Gorayk, in Spandaryan in the Vorotan River basin. It is connected to Arpa River and Arpa River basin by a {{convert|9|mi|adj=on}} long tunnel.{{cite book|title=Engineering news-record|url=https://books.google.com/books?id=CGBIAQAAIAAJ|access-date=15 October 2011|year=1981|publisher=McGraw-Hill}} It reportedly has a breeding colony of lesser kestrels, the only known in Armenia.{{cite web|url=http://www.armeniabirding.info/wwb.html|title=Where to Watch Birds in Armenia|publisher=Armenia Birding|access-date=15 October 2011}}

The reservoir's length is {{convert|7|km}}, its width varies from {{convert|2.5|to|3|km}}, and its depth is {{convert|73|m}}. The surface area of the reservoir is {{convert|10.8|km2}}.{{cite book|last1=Mkrtchyan|first1=Anzhela|title=RA Natural Resources|date=2013|publisher=ANAU|location=Yerevan|isbn=978-9939-54-613-1|page=95}} It has {{convert|218000000|m3|acre feet}} active and {{convert|257000000|m3|acre feet}} total capacities. The normal elevation of water level is {{convert|2060|m}} while {{convert|2030|m}} is the absolute minimum.

=Angeghakot Reservoir=

{{stack|File:Անգեղակոթ.JPG}}

The Angeghakot Reservoir has {{convert|3400000|m3|acre feet}} of total capacity. The reservoir has throughput capacity of {{convert|500000|m3/s}} and the spillway has capacity of {{convert|198|m3/s}}.

=Tolors reservoir=

The Tolors Reservoir has a total capacity of {{convert|96000000|m3|acre feet}} and active capacity of {{convert|80000000|m3|acre feet}}. The normal elevation of water level is {{convert|1651.1|m}} while {{convert|1625.5|m}} is the minimum.

=Tatev Reservoir=

The Tatev Reservoir has total capacity of {{convert|13600000|m3|acre feet}} and active capacity of {{convert|1800000|m3|acre feet}}. The normal elevation of water level is {{convert|1335.4|m}} while {{convert|1333.8|m}} is the minimum.

References

{{Reflist|25em}}