Waneta Dam Expansion
{{Infobox dam
| name = Waneta Dam Expansion
| image =
| image_caption =
| name_official =
| dam_crosses = Pend d'Oreille
| res_name =
| location =
| operator = FortisBC (Operator), Colombia Power Corporation (Owner), Colombia Basin Trust (Owner)
| dam_length =
| dam_height = {{convert|76|m|ft}}
| dam_width_base =
| construction_began =
| opening = 2015.[http://columbiapower.org/projects/waneta-expansion-project/ Columbia Power]
| cost =
| res_capacity_total =
| res_catchment =
| res_surface =
| coordinates = {{coord|49.0041|-117.6116|type:landmark|display=inline,title}}
| plant_capacity = 335 MW
| plant_annual_gen = 627.35 GWh{{cite web| url=https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/independent-power-producers-calls-for-power/independent-power-producers/ipp-supply-list-in-operation.pdf | access-date=2023-11-19 | title=Independent Power Producer (IPP) Supply List - In Operation}}
}}
Waneta Dam Expansion is a two-unit powerplant which started construction in winter of 2010/11 just downstream of the existing Waneta Dam on the Pend d'Oreille River. The dam generates power from water that would otherwise be spilled from the existing project, and is delivered to the BC Hydro grid via a separate 10 km long 230kV transmission line. The expansion project is a partnership, with Fortis Inc. holding a 51% share in the project and the two Crown agencies Columbia Power Corporation and Columbia Basin Trust holding a 32.5% and 16.5% share, respectively. SNC-Lavalin designed and built the project. In January 2019, Columbia Power and Columbia Basin Trust announced that they had agreed to purchase Fortis Inc.’s 51% interest in the facility. The purchase was concluded in April 2019.
The project started delivering power to the grid in 2015{{cite web |url=https://talkingenergy.ca/node/75#updates |title=Waneta Dam Expansion | Talking Energy |publisher=Talkingenergy.ca |date=2015-12-01 |accessdate=2018-04-29 |archive-date=2018-07-10 |archive-url=https://web.archive.org/web/20180710163431/https://talkingenergy.ca/node/75#updates |url-status=dead }} via its two Francis turbine-generator units{{cite web|url=http://www.snclavalin.com/en/waneta-expansion-project |title=Waneta Expansion Project |publisher=SNC-Lavalin |date= |accessdate=2018-04-29}}
See also
{{stack|{{Portal|Canada|Water|Renewable energy}}}}
References
{{reflist}}
External links
- [http://www.columbiapower.org/projects/wanetaexpansion.asp Waneta Expansion Project], Columbia Power Corporation
{{Pend Oreille River dams}}
{{DEFAULTSORT:Waneta}}
Category:Hydroelectric power stations in British Columbia
Category:Dams completed in 2015
Category:Dams in British Columbia
Category:Dams on the Pend Oreille River
{{Hydroelectric-power-plant-stub}}
{{BritishColumbia-struct-stub}}
{{BritishColumbiaInterior-geo-stub}}
{{Canada-powerstation-stub}}