Wuhu Rail Transit

{{Short description|Rapid transit system in Wuhu, Anhui, China}}

{{Use dmy dates|date=October 2022}}

{{Infobox public transit

| name = Wuhu Rail Transit

| locale = Wuhu, Anhui, China

| transit_type = Rapid transit

| lines = 2

| stations = 36

| ridership =

| began_operation = {{Start date and age|df=yes|2021|11|3}}{{cite web|url=http://www.ahwang.cn/anhui/20211102/2304502.html|date=2021-11-02|title=11月3日11时起,芜湖市民可乘坐地铁1号线了}}

| operation_will_start =

| operator =

| vehicles =

| system_length = {{Convert|46.2|km|abbr=on}}

| track_gauge =

| map = 250px

| map_state = collapsed

| image = 芜湖轨道交通1号线.png

| imagesize = 300px

| alt =

| caption = Wuhu Rail Transit Line 1 Monorail

| owner =

| area served =

| line_number =

| start =

| end =

| annual_ridership =

| chief_executive =

| website =

| character =

}}

Wuhu Rail Transit is a two-line monorail rapid transit system in Wuhu, Anhui, China. Both lines use Bombardier Innovia Monorail 300 trains manufactured under a joint venture with CRRC.{{Cite web|url=http://news.wh.house365.com/zx/20170707/027411974.html|title=高清{{!}}芜湖轨道交通1、2号线无人驾驶列车居然长这样?-芜湖365淘房|last=江苏三六五网络有限公司|website=news.wh.house365.com|access-date=2018-04-08}} Line 1 opened on 3 November 2021, with Line 2 opening on 28 December 2021.

History

In 2013, Wuhu initiated plans for the development of rail transit infrastructure. Subsequently, on 9 June 2015, the official website of the Wuhu Municipal Government unveiled the "Wuhu Urban Rail Transit Construction Plan (2016-2020)" to seek public feedback on the environmental impact assessment. By December that year the Wuhu Rail Transit Plan received approval from the National Development and Reform Commission.

On 2 February 2016 the State Council of the People's Republic of China sanctioned the "Wuhu City Rail Transit Construction Plan (2016-2020)." Concurrently, the National Development and Reform Commission greenlit the "Wuhu City Rail Transit Phase I Construction Plan (2016-2020), Anhui Province." Subsequent milestones included the acceptance of the "Environmental Impact Report of the Phase I Project of Wuhu Rail Transit Line 2" by the Anhui Provincial Environmental Protection Department in March, with the publication of the "Environmental Impact Report of the Wuhu Urban Rail Transit Line 1 Project."

From July to September, the Anhui Provincial Development and Reform Commission successively approved the feasibility study reports for the first phase of Rail Transit Line 2 and Line 1 respectively. A pivotal survey event for the initial phase of the Wuhu Rail Transit Project Lines 1 and 2 was conducted on 24 December, leading to the commencement of construction at Xilu Station. Following this, on 26 December, the Wuhu Municipal Government organized a construction survey initiative for the first phase of Wuhu Rail Transit Lines 1 and 2.

Progress continued as Wuhu Rail Transit Line 2 initiated drilling operations on 20 April 2017, while on 26 June that year the first pile of Wuhu Rail Transit Line 1 commenced drilling activities.

Lines in operation

class="wikitable sortable" style="cell-padding:1.5; text-align:center;"

! Line

! class="unsortable" colspan="2" | Terminals

! Commencement

! Newest
Extension

! Length
km

! Stations

{{rint|wuhu|1}}

| Baoshunlu

| Baimashan

| {{Start date|df=yes|2021|11|3}}

| {{n/a}}

| 30.46

| 25

{{rint|wuhu|2}}

| Jiuziguangchang

| Wanchunhulu

| {{Start date|df=yes|2021|12|28}}

| {{n/a}}

| 15.787

| 11

class="sortbottom"

! colspan="5" | Total

! 46.25

! 36

=Line 1=

{{Main|Line 1 (Wuhu Rail Transit)}}

File:鸠兹广场站.jpg

Line 1 started construction in December 2016.{{Cite web|url=http://news.wh.house365.com/zx/20171027/027628018.html|title=高清{{!}}墩柱有了"身份证" 芜湖轨道交通1号线建设正酣-芜湖365淘房|last=江苏三六五网络有限公司|website=news.wh.house365.com|access-date=2018-04-08}} Line 1 opened on 3 November 2021.

On 25 September 2021, Wuhu Rail Transit Line 1 launched a monthly long trial with 10,000 passengers per week expected to test the line for free.{{cite news |title=安徽"第二城",即将进入轨道交通时代 |publisher=Sina |url=https://finance.sina.com.cn/tech/2021-09-24/doc-iktzqtyt7748832.shtml |access-date=2021-09-27 |date=24 September 2021}}

=Line 2=

{{Main|Line 2 (Wuhu Rail Transit)}}

The first phase of Line 2 started construction in 2018.{{Cite web|url=http://news.wh.house365.com/zx/20180114/027772639.html|title=芜湖轨道交通2号线建设又有新进展,"轨道交通时代"即将到来!-芜湖365淘房|last=江苏三六五网络有限公司|website=news.wh.house365.com|access-date=2018-04-08}} Line 2 opened on 28 December 2021.{{cite web|url=https://mp.weixin.qq.com/s/BN48C5v2d25Y24mDXy_cHA|title=芜湖官宣!单轨2号线开通时间定了!}}

Future development

=Line 2 (Phase 2)=

The second phase of Line 2 is under planning and will be completed by 2025. It will extend Line 2 to Wuhubei railway station.{{cite web|url=http://zjw.wuhu.gov.cn/xwzx/jsdt/8253322.html|date=2020-10-10|title=芜湖市城市轨道交通建设规划(2021-2025年)环境影响评价公众参与第一次公示}}

=Other plans=

The system is planned to comprise five lines.

References