Xiwei Bridge
{{short description|Bridge in Taichung, Taiwan}}
{{Infobox bridge|name=Xiwei Bridge|native_name=溪尾大橋|native_name_lang=zh-tw|image=|image_upright=|alt=|caption=|coordinates={{Coord|24|03|03.0|N|120|38|23.1|E|region:TW_type:landmark|display=inline;title}}|carries=Section 8 and 9, Huanzhong Road|crosses=Dadu River|locale=Wuri District, Taichung, Taiwan|owner=|maint=|heritage=|id_type=|design=Cable-stayed, tied-arch, and girder|length={{convert|2.088|km|abbr=on}}|width={{convert|12|m|abbr=on}}|height=|depth=|traversable=|towpath=|mainspan=|number_spans=|piers_in_water=|load=|clearance_above=|clearance_below=|lanes=2|life=|architect=|designer=|winner=|contracted_designer=|engineering=|builder=|fabricator=|begin={{start date|2014|07}}|cost={{currency|829000000|TWD}}|open={{start date|2016|11|21}}|traffic=|id=|capacity=}}
Xiwei Bridge ({{lang-zh|t=溪尾大橋|p=Xīwěi Dàqiáo}}) is a bridge across the Dadu River in Wuri District, Taichung City, Taiwan. The bridge connects Taichung with Xiwei Village, a pene-exclave on the southwest bank of the river. Another bridge, known as the Xiwei Second Bridge ({{lang-zh|t=溪尾二橋}}), serves as the road's westward extension into Fenyuan Township, Changhua County.
History
The Dadu River has historically been the boundary between Taichung and Changhua. On August 7, 1959, a major flood changed the course of the river and isolated Xiwei Village from the rest of Taichung. While there are multiple roads connecting Xiwei to Changhua County, there was no direct method for Xiwei residents to reach Taichung.{{cite news|author1=李鴻典|date=November 22, 2016|title=台中溪尾大橋通車!這地方不再是孤島|language=zh-tw|agency=SET News|url=https://www.setn.com/News.aspx?NewsID=200477|access-date=June 15, 2021}}
The groundbreaking ceremony for the main bridge was held on July 30, 2014,{{cite news|author1=林欣儀|date=July 30, 2014|title=爭取多年 溪尾大橋終動土|language=zh-tw|publisher=Yahoo News|agency=China Times|url=https://tw.news.yahoo.com/%E7%88%AD%E5%8F%96%E5%A4%9A%E5%B9%B4-%E6%BA%AA%E5%B0%BE%E5%A4%A7%E6%A9%8B%E7%B5%82%E5%8B%95%E5%9C%9F-215043274.html|access-date=June 15, 2021}} and the bridge's construction was completed on November 21, 2016. On the Xiwei end, the road stopped at a T-intersection with the one-lane, {{convert|2.5|m|abbr=on}} Qingguang Road, which led to frequent accidents as cars tried to pass each other in the narrow space. Three passing areas were built in 2017 as a temporary solution while the second bridge was under construction.{{cite news|author1=邱植培|author2=彭煥羣|date=April 13, 2019|title=烏日溪尾大橋車多 聯外道卻是狹窄農路|language=zh-tw|agency=PTS|location=Taichung|url=https://news.pts.org.tw/article/429751|access-date=June 15, 2021}}{{cite news|author1=蘇金鳳|date=March 7, 2018|title=烏日下溪尾大橋轉慶光路難會車 議員要求改善|language=zh-tw|agency=Liberty Times|url=https://news.ltn.com.tw/news/life/breakingnews/2358541|access-date=June 15, 2021}}
The groundbreaking ceremony for the Xiwei Second Bridge occurred on October 31, 2018,{{cite web|date=October 31, 2018|title=彰化魏明谷縣長與臺中市長林佳龍共同打通中彰交通 彰南路大肚溪橋(溪尾大橋延伸段)動土|url=https://publicworks.chcg.gov.tw/03bulletin/bulletin02_con.asp?bull_id=283307|access-date=June 15, 2021|website=Changhua County Department of Public Works|language=zh-tw}} and was completed on February 6, 2021.{{cite web|date=February 6, 2021|title=烏日到芬園變7分鐘 溪尾大橋延伸段通車 盧市長:促進兩地繁榮|url=https://www.taichung.gov.tw/1724748/post|access-date=June 15, 2021|website=Taichung City Government|language=zh-tw}}
Design
Xiwei Bridge is {{convert|2.088|km|abbr=on}} long and {{convert|12|m|abbr=on}} wide and carries two lanes of vehicular traffic. The road on the Wuri side is Huanzhong Road Section 8, while the Xiwei side is Huangzhong Road Section 9. The {{convert|1.3|km|abbr=on}} middle section is made of two steel tied-arch spans with two cable-stayed spans on each side. Girder bridges lead up to the middle section on both sides. The bridge cost {{currency|829000000|TWD}} to build.{{cite news|author1=盧金足|date=September 18, 2016|title=克服天候 溪尾大橋月底完工|language=zh-tw|agency=China Times|url=https://www.chinatimes.com/newspapers/20160918000362-260107?chdtv|access-date=June 15, 2021}}
Xiwei Second Bridge is located to the west of Xiwei Bridge, carrying two lanes of traffic over the Maoluo River. The prestressed girder bridge is {{convert|380|m|abbr=on}} long, connecting Xiwei to Fenyuan Township in Changhua County. The construction cost {{currency|530000000|TWD}} to build. The two bridges form a direct connection between National Freeway 3 and Provincial Highway 14.