:A465 road

{{Short description|Major road in England and south Wales}}

{{Use dmy dates|date=April 2022}}

{{Use British English|date=February 2013}}

{{Infobox road

|country=GBR

| maint = English local authorities and South Wales Trunk Road Agency

|type=A

|route=465

|image= The Heads of the Valleys Road A465 road (2012).jpg

|length_mi=66

|direction_a= West

|terminus_a = Llandarcy
{{coord|51.6492|-3.8486|type:landmark_region:GB|display=inline|name=A465 road (western end)}}

|direction_b= East

|terminus_b = Bromyard, Herefordshire
{{coord|52.1870|-2.5139|type:landmark_region:GB|display=inline|name=A465 road (eastern end)}}

|junction = {{jct|country=GBR|M|4|dab1=Great Britain}} Junction 43
{{jct|country=GBR|A|48|noshield1=|nolink1= }}
{{jct|country=GBR|A|474|name1= }}
{{jct|country=GBR|A|4230|name1= }}
{{jct|country=GBR|A|4109|name1= }}
{{jct|country=GBR|A|4061|name1= }}
{{jct|country=GBR|A|4059|name1= }}
{{jct|country=GBR|A|470|name1= }}
{{jct|country=GBR|A|4054|name1= }}
{{jct|country=GBR|A|4060|name1= }}
{{jct|country=GBR|A|469|name1= }}
{{jct|country=GBR|A|4048|name1= }}
{{jct|country=GBR|A|4046|name1= }}
{{jct|country=GBR|A|4047|name1= }}
{{jct|country=GBR|A|467|name1= }}
{{jct|country=GBR|A|4077|name1= }}
{{jct|country=GBR|A|4143|name1= }}
{{jct|country=GBR|A|4042|name1= }}
{{jct|country=GBR|A|40|noshield1=|nolink1= }}
{{jct|country=GBR|A|49|noshield1=|nolink1= }}

|destinations= Neath
Merthyr Tydfil
Abergavenny
Hereford

|previous_type = A

|next_type = A

|previous_route = 464

|next_route = 466

}}

The A465 is a trunk road that runs from Bromyard in Herefordshire, England to Llandarcy near Swansea in south Wales. The western half in Wales is known officially as the Neath to Abergavenny Trunk Road,{{cite web|url=http://www.a465brynmawr2tredegar.co.uk/content/docs/Arup%20Explanatory%20Statement-%20English%20Final.pdf |title=A465 HEADS OF THE VALLEYS DUALLING SECTION 3: BRYNMAWR TO TREDEGAR |publisher=Carillion plc |access-date=2015-03-10 |url-status=dead |archive-url=https://web.archive.org/web/20150402091605/http://www.a465brynmawr2tredegar.co.uk/content/docs/Arup%20Explanatory%20Statement-%20English%20Final.pdf |archive-date=2 April 2015 }} but the section from Abergavenny to the Vale of Neath is more commonly referred to as the Heads of the Valleys Road because it links the northern heads of the South Wales Valleys. This section was also the subject of a major upgrade programme to convert the road into a dual carriageway with two lanes in each direction, and the final completed section opened on 31st May 2025, bringing a 23-year long scheme to a close. Approximately following the southern boundary of the Bannau Brycheiniog National Park, the Ordnance Survey Pathfinder guide describes it as the unofficial border between rural and industrial South Wales.OS Pathfinder Guide, Brecon Beacons and Glamorgan. Ordnance Survey 1994. The A465 provides an alternative route between England and the counties in South West Wales and to the ferries to Ireland.[http://wales.gov.uk/topics/transport/roads/schemes/ewsouth/a465hov/?lang=en Welsh Government – A465 (Heads of the Valleys Road) – Dualling Scheme] {{webarchive |url=https://web.archive.org/web/20130516095331/http://wales.gov.uk/topics/transport/roads/schemes/ewsouth/a465hov/?lang=en |date=16 May 2013 }}

Route

The A465 runs south-west from Bromyard towards the River Lugg, from where it runs concurrently with the A4103 for a short distance before entering Hereford. After a short distance on the A49, it crosses the River Wye, the River Monnow and the border into Wales. The A465 meets the A40 trunk road in Abergavenny and continues west through the 'Heads of the Valleys' region past Brynmawr, Ebbw Vale, Tredegar, Rhymney, Merthyr Tydfil, Hirwaun, Glynneath and Aberdulais.

{{multiple image

| align = left

| direction = horizontal

| header =

| header_align = center

| header_background =

| footer =

| footer_align = left

| footer_background =

| caption_align = center

| total_width = 400px

| image1 = Dowlais Top Route of former Abergavenny - Merthyr railway being incorporated in new A465 Heads of Valley road 1736770 6a95992b.jpg

| alt1 =

| caption1 = The A465 runs over the former Merthyr, Tredegar and Abergavenny Railway line (1965)

| image2 = Highest point on the A465 Heads of the Valleys Road - geograph.org.uk - 7702314.jpg

| alt2 =

| caption2 = Highest point of the A465 road

}}

Even before the construction of the Heads of the Valleys road began in the 1960s, there were concerns and complaints regarding the capacity and safety of a single carriageway, three-lane design. The Abergavenny{{ndash}}Neath trunk road opened in 1964.{{Cite web|url=https://api.parliament.uk/historic-hansard/written-answers/1960/feb/17/heads-of-the-valleys-road#S5CV0617P0_19600217_CWA_25|date=17 February 1960|title=Heads of the Valleys Road |website=Parliamentary Debates (Hansard)}}

Until 1996, the A465 ran for most of its length between Glynneath and Aberdulais along a narrow single carriageway road, now redesignated as the B4242. The high collision rate on this stretch was the main factor in leading to the construction of the dual carriageway between these points. The section of the A465 from Hirwaun to Llandarcy is all dual carriageway.{{Cite web|url=https://api.parliament.uk/historic-hansard/written-answers/1992/jun/08/a465|date=8 June 1992|title=A465 |website=Parliamentary Debates (Hansard)}}{{Cite web|url=http://eclecs.blogspot.com/2006/07/where-is-resolfen.html|title=Cymdeithas Hanes Resolfen History Society: Where is Resolfen?}}

The highest point (signposted) of {{convert|1350|ft|m}} is on the Ebbw Vale section which is now dual carriageway and slip roads between Dowlais Top and Tredegar via Rhymney. At Dowlais Top there are link roads such as the A4060, which runs down to the south end of Merthyr Tydfil and links with the A470, and the A4054 which goes through Merthyr Vale and Aberfan. Another link is the A4102 which leads into Dowlais and Merthyr Tydfil town centre. The A465 passes Prince Charles Hospital in Merthyr Tydfil and then continues to Cefn-coed-y-cymmer and the A470 link. It then continues down the floor of the Vale of Neath, bypassing Resolven, Neath and Skewen, before terminating at junction 43 of the M4 at Llandarcy.

Major upgrade

In 1990, a regional traffic study identified the need for improvements to the A465. In 1994, alternatives were presented for public consultation for the improvement of the 25-mile length between Abergavenny and Hirwaun, connecting the existing A465 dual carriageway link from Swansea to the A40, which is an important part of the route to the M50. In July 1995 the then Secretary of State for Wales announced the preferred route. This mainly consisted of widening the existing road to provide a dual carriageway standard with grade-separated junctions (and extra climbing lanes on certain hills) between Abergavenny and Hirwaun. The design was developed and a draft line order was published in 1997. This was tested at public local inquiry in 1998 after which the Secretary of State for Wales announced the decision to proceed with the scheme in 1999.

Much of the land on the route is undulating, but despite this, the preferred route alignment is considered to be of high standard and as such allows most of the route to have the national speed limit.{{Cite web|url=http://www.highwaycodeuk.co.uk/3/post/2015/04/new-higher-speed-limits-for-lorries-in-england-and-wales.html|title=New higher speed limits for lorries in England and Wales|website=THE HIGHWAY CODE}}

{{wide image|A465 Road Duelling Phases.png|722px|Map of the A465 upgrade sections}}

Initially, the upgrade was split into seven sections. Later, sections 6 and 7 were combined into a single scheme for the purposes of construction. Construction of sections 5 and 6 has also been treated as a single scheme.

class="wikitable sortable"

|+ style="font-variant:small" | A465 upgrade sections are

! Section !! From / To !! Commencement date !! Completion date !! Status !! Final Cost !! Image

1Abergavenny to GilwernFebruary 2005May 2008Complete£57m{{cite web|url=https://www.gov.wales/sites/default/files/publications/2023-08/ATISN%2018667%20.pdf|publisher=Welsh Government|title=Request for Information - ATISN 18667|access-date=8 March 2024|date=26 July 2023}}120px
2Gilwern to BrynmawrDecember 2014{{cite web|url=http://a465gilwern2brynmawr.co.uk/2014/12/18/green-light-for-next-stage-of-widening-project/ |title=Green light for next stage of widening project | A465 Section 2 |access-date=2015-02-21 |url-status=usurped |archive-url=https://web.archive.org/web/20150221232227/http://a465gilwern2brynmawr.co.uk/2014/12/18/green-light-for-next-stage-of-widening-project/ |archive-date=21 February 2015 }}December 2021{{cite web|url=https://gov.wales/written-statement-a465-dualling-section-2-gilwern-brynmawr-project-update-0|publisher=Welsh Government|title=Written Statement: A465 Dualling Section 2 (Gilwern to Brynmawr) Project Update|access-date=1 March 2021}}Complete£336.2m120px
3Brynmawr to TredegarJanuary 2013September 2015Complete£163.3m120px
4Tredegar to Dowlais TopMarch 2002November 2004Complete£57.8m120px
5 & 6Dowlais Top to HirwaunMay 2021{{cite web|url=https://gov.wales/a465-section-5-and-6-dowlais-top-hirwaun-overview|publisher=Welsh Government|title=A465 section 5 and 6 Dowlais Top to Hirwaun |access-date=21 December 2019}}May 2025{{Cite web |date=2025-05-30 |title=A465 Heads of the Valleys road fully reopens after 23 years |url=https://www.bbc.com/news/articles/cpvkdvrm1wpo |access-date=2025-05-31 |website=BBC News |language=en-GB}}Complete£590m{{cite web|url=https://www.gov.wales/a465-section-5-and-6-dowlais-top-hirwaun|publisher=Welsh Government|title=A465 section 5 and 6 Dowlais Top to Hirwaun |access-date=8 March 2024|date=7 December 2023}}120px

= Sections 1 to 4 =

The A465 between Llandarcy and Hirwaun was initially constructed to dual carriageway standard, and as such will not see a major upgrade. Construction work began on section 4 (Tredegar to Dowlais Top) in early spring 2002, and was completed by November 2004.

Construction of Section 1 (Abergavenny to Gilwern) began in February 2005. This was primarily an on-line upgrade of the existing single-carriageway road, and was completed on 22 May 2008.

The contract for Section 3 (Brynmawr to Tredegar) was awarded to Carillion in March 2010. In August 2012, it was announced that approval for the scheme to commence had been given and that construction would commence by the end of 2012.{{Cite web |url=https://www.a465brynmawr2tredegar.co.uk/ |title=A465 Road Dualling Scheme Brynmawr to Tredegar |access-date=6 June 2020 |archive-url=https://web.archive.org/web/20160616161506/http://www.a465brynmawr2tredegar.co.uk/ |archive-date=16 June 2016 |url-status=dead }}

Planning for Section 2 (Gilwern to Brynmawr) started in June 2011, with construction beginning in January 2015.{{Cite web |url=http://www.a465gilwern2brynmawr.co.uk/ |title=A465 Section 2 Project Website |access-date=7 October 2012 |archive-url=https://web.archive.org/web/20130109020826/http://www.a465gilwern2brynmawr.co.uk/ |archive-date=9 January 2013 |url-status=usurped}} The project was due to be finished in 2018. However, this section saw several delays and cost overruns, and was completed in December 2021.{{Cite web|url=https://www.bbc.com/news/uk-wales-59796648|title=Heads of the Valleys road section opens three years late|date=30 December 2021|publisher=BBC}}

= Sections 5 and 6 =

On 10 November 2020, the Welsh Government announced that the contract for Section 5 & 6 (Dowlais Top to Hirwaun) had been awarded to Future Valleys Construction, a consortium which 'comprises large international construction companies alongside established financial investors'.{{Cite web|url=https://gov.wales/contract-awarded-a465-improvements|title=A465: Contract awarded for A465 improvements |date=10 November 2021|via=gov.wales}} Site clearance works began shortly thereafter, and major construction work commenced in May 2021. Completion of the scheme was programmed for mid-2025 and was completed 31 May 2025.{{Cite web|url=https://gov.wales/a465-section-5-and-6-dowlais-top-hirwaun-overview|title=A465: Section 5 & 6 Dowlais Top to Hirwaun Overview |date=8 July 2021|via=gov.wales}}

{{wide image|Taf Fawr on the A465.jpg|1000px|align-cap=center|Sections 5 & 6 (Dowlais Top to Hirwaun). The junction of the A470 and A465 during construction in 2023}}

See also

References

{{Reflist|refs=

}}