:Eisenhower Tunnel

{{short description|Vehicular tunnel in Colorado}}

{{Use mdy dates|date=March 2023}}

{{good article}}

{{Infobox tunnel

| name = Eisenhower–Johnson
Memorial Tunnel

| image = {{mapframe |frame=yes |plain=yes |frame-width=300 |frame-height=240 |frame-align=center |type=point |text=Eisenhower Tunnel |frame-coordinates={{coord|38.9972|-105.5478}} |zoom=6}}

| caption = Eisenhower Tunnel

| route = {{jct|state=CO|I|70}}

| crosses = Continental Divide

| location = Approx. {{convert|60|mi|-1}} west of Denver, Colorado

| operator = Colorado Department of Transportation

| character = Twin-bore tunnel

| length = {{convert|1.693|mi|2|abbr=on}} westbound
{{convert|1.697|mi|2|abbr=on}} eastbound

| width = {{convert|40|ft|1|abbr=on}} each

| height = {{convert|13.92|ft|abbr=on}}

| vpd = 32,260 vehicles (2007)

| opened = 1973 Eisenhower (westbound)
1979 Johnson (eastbound)

| coordinates = {{coord|39.6785|N|105.9200|W|region:US-CO_type:landmark_dim:2000|display=inline,title}}

| grade = 1.64%

| lowelevation = {{convert|11013|ft|abbr=on}}
east portal

| hielevation = {{convert|11158|ft|abbr=on}}
west portal

}}

The Eisenhower Tunnel, officially the Eisenhower–Edwin C. Johnson Memorial Tunnel, is a dual-bore, four-lane vehicular tunnel in the western United States, approximately {{convert|60|mi|km}} west of Denver, Colorado. The tunnel carries Interstate 70 (I-70) under the Continental Divide in the Rocky Mountains. With a maximum elevation of {{convert|11158|ft|m}} above sea level, it is one of the highest vehicular tunnels in the world. The tunnel is the longest mountain tunnel and highest point on the Interstate Highway System. Opened in 1973, the westbound bore is named after Dwight D. Eisenhower, the U.S. President for whom the Interstate system is also named. The eastbound bore was completed in 1979 and is named for Edwin C. Johnson, a Colorado governor and U.S. Senator who lobbied for an Interstate Highway to be built across Colorado.

Description

File:Johnson Tunnel, Colorado.jpg

The Eisenhower Memorial Bore (westbound tunnel) is {{convert|1.693|mi|km|2}} long, while the Edwin C. Johnson Memorial Bore (eastbound tunnel) is {{convert|1.697|mi|km|2}} long. The tunnels are sloped with a 1.64% grade, with an elevation of {{convert|11013|ft|m}} at the east portal and {{convert|11158|ft|m}} at the west portal.

At its dedication, the Eisenhower Tunnel was the highest vehicular tunnel in the world.{{cite web |url = http://www.coloradodot.info/travel/eisenhower-tunnel/description.html |title = Eisenhower Tunnel Description |publisher = Colorado Department of Transportation |access-date = January 16, 2010 }} While it remains the highest vehicular tunnel in the US, and longest mountain tunnel and highest point on the Interstate Highway System, higher tunnels have since been constructed elsewhere, such as the Fenghuoshan Tunnel, a rail tunnel in China.{{cite magazine |url = http://www.highbeam.com/doc/1G1-95954148.html |archive-url = https://web.archive.org/web/20121025190400/http://www.highbeam.com/doc/1G1-95954148.html |url-status = dead |archive-date = October 25, 2012 |title = China Completes World's Highest Railroad |magazine = Railway Track and Structures |date = December 1, 2002 |access-date = June 13, 2009 }}

The tunnel bores measure {{convert|48|x|40|ft|m|abbr=on}}. The traveled portion is a rectangular shape just over {{convert|16|ft|m|abbr=on}} tall. The space above is used for forced air ventilation while the space below the roadway is used for drainage.

{{As of|2023|3}}, more than 434 million vehicles had passed through the tunnel. This figure includes a significant number of visitors to Colorado's ski resorts.{{cite press release |url = http://www.coloradodot.info/news/news-releases/30-years-for-johnson-tunnel |archive-url = https://web.archive.org/web/20100906192147/http://www.coloradodot.info/news/news-releases/30-years-for-johnson-tunnel |archive-date = September 6, 2010 |url-status = dead |title = 30 Years for Johnson Tunnel |date = December 21, 2009 |publisher = Colorado Department of Transportation |access-date = January 16, 2010 }}

=Height restriction=

File:Eisenhower Tunnel2.JPG

Due to additional height restrictions from variable-message signs and lighting systems, the original posted clearance of the tunnels was {{convert|13|ft|6|in|m|abbr=on|2}}. The trucking industry lobbied the Colorado Department of Transportation (CDOT) to increase the vertical clearance. In 2007, the tunnel was retrofitted with lower-profile lighting and signs, increasing its clearance by {{convert |5 |in |cm |abbr=on}} to {{convert|13|ft|11|in|m|abbr=on|2}}.{{cite web |publisher=Commercial Carrier Journal |url=https://www.ccjdigital.com/business/article/14908198/colorado-raises-height-limit-on-i-70-tunnel |title=Colorado raises height limit on I-70 tunnel |date=November 19, 2007 |access-date=April 1, 2023}}

A height detector near each tunnel entrance sounds a siren and turns traffic signals red, stopping all traffic, if an overheight vehicle attempts to enter the tunnel. The entrance will remain closed until the vehicle is removed from the freeway, which can cause severe delays. CDOT noted that prior to the retrofit, about 20,000 vehicles per year tripped the alarm. The trucking industry argued that many of these trucks were under the height requirement but tripped the alarm due to their air suspensions (which can be lowered during their journey through the tunnel) or due to snow and ice atop the trailer. During this time, the trucking industry estimated the number of alarms would drop by as much as 80% if the clearance could be raised even a few inches.{{cite news |url = http://m.rockymountainnews.com/news/2007/Nov/13/inches-to-spare-for-trucks/ |first = Kevin |last = Flynn |title = Inches to Spare for Trucks |work = Rocky Mountain News |location = Denver |date = November 13, 2007 |access-date = January 16, 2010 |url-status = dead |archive-url = https://web.archive.org/web/20110715195907/http://m.rockymountainnews.com/news/2007/Nov/13/inches-to-spare-for-trucks/ |archive-date = July 15, 2011 }}

The 2007 retrofit also added a weigh-in-motion system that calculates a safe speed for trucks on the 7% grades and curves on the departures from the tunnels and displays it to each driver.{{cite web |url = http://www.irdinc.com/showcase/5_safety_systems.php |publisher = International Road Dynamics |title = IRD Safety Systems: Showcase |access-date = January 16, 2010 |url-status = dead |archive-url = https://web.archive.org/web/20081028114103/http://www.irdinc.com/showcase/5_safety_systems.php |archive-date = October 28, 2008 }}

=Alternate route=

File:Eisenhower-Johnson Memorial Tunnel.jpg

While the tunnel has largely supplanted the older route of U.S. Highway 6 over Loveland Pass, hazardous material carriers (hazmats), bicycles, and pedestrians are prohibited from the tunnel and must use the pass, which is longer, steeper, and {{convert|834|ft|m|abbr=on}} higher at {{convert|11992|ft|m|abbr=on}}. And while the tunnel's route is less formidable than the pass, its approaches are steep nonetheless and have runaway truck ramps.{{cite news |url=https://www.vaildaily.com/news/runaway-truck-ramps-near-silverthorne-are-the-most-frequently-used-in-colorado/ |publisher=Summit Daily News |date=May 9, 2019 |first=Sawyer |last=D'Argonne |access-date=April 1, 2023 |title=Runaway truck ramps near Silverthorne are the most frequently used in Colorado}}

If Loveland Pass is closed—such as for construction or storms—the hazmat prohibition is temporarily lifted and the tunnel is closed to regular traffic once per hour to allow hazmats to be escorted through the tunnel in a convoy.{{cite news |url = http://www.highbeam.com/doc/1G1-67417489.html |archive-url = https://web.archive.org/web/20121102221531/http://www.highbeam.com/doc/1G1-67417489.html |url-status = dead |archive-date = November 2, 2012 |title = Paving Project to Halt Loveland Pass Traffic: Eisenhower Tunnel Also May Be Snarled |first = Katie |last = Kerwin |work = Rocky Mountain News |location = Denver |date = July 30, 1999 }}

History

File:Eisenhower Tunnel Colorado West Entrance.jpg

The idea for a tunnel under Loveland Pass existed since at least the 1950s.{{cite news |url = https://news.google.com/newspapers?nid=897&dat=19570121&id=El5PAAAAIBAJ&sjid=wE8DAAAAIBAJ&pg=5483,885958 |newspaper = Prescott Evening Courier |agency = Associated Press |title = Long Tunnel in Colorado Wins Support |date = January 21, 1957 |page = 7 |via = Google News }} William A.H. Loveland had an idea of a tunnel under the divide in 1867, but instead got the wagon road now known as Loveland Pass built. {{cite news |last = Jordan |first = Kathy |url = https://www.gjsentinel.com/lifestyle/columns/notion-of-tunnel-under-divide-predates-reality-by-100-plus-years/article_48b8217c-48ca-5c28-83fc-d704f729d0ce.html |title = Notion of tunnel under Divide predates reality by 100-plus years |date = December 30, 2011 |work = The Grand Junction Daily Sentinel |access-date = March 28, 2021 |url-status = |archive-url = https://web.archive.org/web/20210328222948/https://www.gjsentinel.com/lifestyle/columns/notion-of-tunnel-under-divide-predates-reality-by-100-plus-years/article_48b8217c-48ca-5c28-83fc-d704f729d0ce.html |archive-date = March 28, 2021 }} Serious discussion began when the state of Colorado lobbied for the Interstate Highway System to route a transcontinental highway across Colorado. After a round of negotiations with Utah officials, it was decided the best option was to follow the US Route 6 corridor. Engineers recommended tunneling under the pass, rather than attempt to build a route across conforming to Interstate Highway standards.

The Eisenhower–Johnson Memorial Tunnel was known as the Straight Creek Tunnel during construction,{{cite news |url = https://news.google.com/newspapers?nid=2209&dat=19710714&id=6pkrAAAAIBAJ&sjid=BfkFAAAAIBAJ&pg=6909,1420038 |newspaper = Nashua Telegraph |last = Ripley |first = Anthony |title = Straight Creek Tunnel Project Hit by Soaring Costs |date = July 14, 1971 |page = 10 }} named for the waterway that runs along the western approach to the tunnel. Before the tunnel was dedicated, it was renamed to honor Dwight D. Eisenhower and Edwin C. Johnson. The original Pioneer bore to access the two larger bores was "holed through" in late 1964, after fourteen months.{{cite news |url = https://news.google.com/newspapers?id=SHxfAAAAIBAJ&sjid=3i8MAAAAIBAJ&pg=6245%2C926886 |work = Lewiston Morning Tribune |agency = Associated Press |title = Tunnel holed through in Rockies |date = December 6, 1964 |page = 12 }} Construction on the first bore of the tunnel was started on March 15, 1968. Construction efforts suffered many setbacks and the project went well over time and budget. One of the biggest setbacks was the discovery of fault lines in the path of the tunnel that were not discovered during the pilot bores. The first construction contractor went bankrupt excavating rock in this fault zone.{{cite news |last = Murray |first = Jon |date = March 7, 2021 |title = The Eisenhower Tunnel transformed transportation in Colorado — but now it needs serious upgrades |url = https://www.denverpost.com/2021/03/08/eisenhower-tunnel-repairs-history/ |work = The Denver Post |access-date = March 20, 2021 |archive-url = https://web.archive.org/web/20210309040322/https://www.denverpost.com/2021/03/08/eisenhower-tunnel-repairs-history/ |archive-date = March 9, 2021 }} These faults began to slip during construction and emergency measures had to be taken to protect the tunnels and workers from cave-ins and collapses.{{cite book |url = http://www.coloradodot.info/programs/environmental/archaeology-and-history/highways-to-the-sky |author = Associated Cultural Resource Experts |publisher = Colorado Department of Transportation |title = Highways to the Sky: A Context and History to Colorado's Highway System |year = 2002 |access-date = May 22, 2009 }} Despite the best efforts of engineers, three workers were killed boring the first tube and four in boring the second.{{Cite web |url = https://www.codot.gov/travel/eisenhower-tunnel/eisenhower-tunnel-interesting-facts.html |title = Eisenhower Tunnel Interesting Facts |publisher = Colorado Department of Transportation |access-date = July 14, 2015 |archive-date = July 16, 2022 |archive-url = https://web.archive.org/web/20220716193057/https://www.codot.gov/travel/eisenhower-tunnel/eisenhower-tunnel-interesting-facts.html |url-status = dead }}

Further complicating construction, the boring machines could not work as fast as expected at such high elevations and so the productivity was significantly less than planned. The frustration prompted one engineer to comment, "We were going by the book, but the damned mountain couldn't read." Though the project was supposed to take three years, the tunnel was not opened to traffic until a March 8, 1973, dedication ceremony by Governor John Love.{{cite web |last = Jordan |first = Kathy |url = https://www.gjsentinel.com/lifestyle/columns/eisenhower-tunnel-a-moving-target-during-construction/article_b2e2bfae-5879-51ec-85a1-e6c1e62dab9f.html |title = Eisenhower Tunnel a moving target during construction |date = January 2, 2012 |work = The Grand Junction Daily Sentinel |access-date = March 28, 2021 |url-status = |archive-url = https://web.archive.org/web/20210328230838/https://www.gjsentinel.com/lifestyle/columns/eisenhower-tunnel-a-moving-target-during-construction/article_b2e2bfae-5879-51ec-85a1-e6c1e62dab9f.html |archive-date = March 28, 2021 }} Initially, the northern Eisenhower bore was used for two-way traffic, with one lane for each direction. The amount of traffic through the tunnel exceeded predictions, and efforts soon began to expedite construction on the southern bore. Construction began on the eastbound Edwin C. Johnson tunnel on August 18, 1975, and finished on December 21, 1979. The initial engineering cost estimate for the Eisenhower bore was $42 million, but the actual cost was $108 million (equivalent to ${{inflation|US|108|1973}} million in {{CURRENTYEAR}}). Approximately 90% of the funds were paid by the federal government, with the state of Colorado paying the rest. At the time, it set a record for the most expensive federally aided project. The excavation cost for the Johnson bore was $102.8 million (equivalent to ${{inflation|US|102.8|1979}} million in {{CURRENTYEAR}}). Not included in the figures is about $50 million in non-boring expenses during the construction of both tunnels.{{cite web |url = http://www.coloradodot.info/travel/eisenhower-tunnel/eisenhower-memorial-bore.html |title = Eisenhower Memorial Bore |publisher = Colorado Department of Transportation |access-date = January 20, 2010 }}{{cite web |url = http://www.coloradodot.info/travel/eisenhower-tunnel/edwin-c-johnson-memorial-bore.html |title = Edwin C Johnson Bore |publisher = Colorado Department of Transportation |access-date = July 25, 2009 }}

Upon opening, it became the highest-elevation tunnel in the world, taking the title from the Salang Tunnel in Afghanistan.{{cite news |url=https://www.npr.org/sections/thetwo-way/2010/12/07/131879364/high-up-in-afghanistan-a-ghostly-ride-through-the-salang-tunnel |publisher=National Public Radio |date=December 7, 2010 |first=Nishant |last=Dahiya |title=High Up In Afghanistan, A 'Ghostly' Ride Through The Salang Tunnel |access-date=April 1, 2023}}

Image:Eisenhower Tunnel 1978.jpg

The tunnel's construction highlighted issues relevant to the feminist movement. When Janet Bonnema applied for a position as an engineering technician with the Colorado Department of Transportation she was given an assignment on the Straight Creek Tunnels project. Her supervisor misread her resume and thought that he was hiring "James." When the supervisor discovered that the department had hired a woman, she was tasked with doing support work from the office. There was opposition to a woman entering the construction site. One supervisor stated that if she entered, "Those workers would flat walk out of that there tunnel and they'd never come back." The workers, most of whom had a mining background, expressed a common superstition that a woman brought bad luck to a mine.{{cite news |url = https://news.google.com/newspapers?nid=1798&dat=19721005&id=8_YeAAAAIBAJ&sjid=Io0EAAAAIBAJ&pg=4827,875160 |newspaper = Sarasota Journal |agency = United Press International |title = Superstition Bars Women from Straight Creek Mine |date = October 5, 1972 |page = 4A |via = Google News }} One worker insisted, "It's a jinx. I've seen too many die after a woman was in the tunnel."{{cite web |url = https://www.fhwa.dot.gov/infrastructure/covefort.cfm |title = Ask the Rambler: Why Does I-70 End in Cove Fort, Utah? |publisher = Federal Highway Administration |access-date = June 7, 2009 |last = Weingroff |first = Richard }}

Bonnema sued the department for the right to work inside the tunnel. She countered she was in better shape and more agile than most of the men who were working on the tunnel. Emboldened by the passage of an equal rights law in Colorado, she finally entered the tunnel, with an entourage of reporters, on November 9, 1972. Some workers walked off the job, and at least one of them yelled, "Get those women out of here." She remained determined and re-entered the tunnel a few days later. The next time, she dressed in coveralls and was even assigned tasks on the roof of the tunnel overlooking the men below. Surprised that nobody had apparently noticed that she was a woman, she stated, "I had a good disguise." Bonnema continued to dress in coveralls during her subsequent work in the tunnel so as not to attract attention.{{cite encyclopedia |url = https://coloradoencyclopedia.org/article/eisenhower-tunnel |title = Eisenhower Tunnel |first = Ryan |last = Rebhan |date = August 21, 2015 |access-date = June 7, 2017 |encyclopedia = Colorado Encyclopedia }}

In November 2023, CDOT opened an updated operations center and new garage bays at the tunnels.{{cite press release|title=CDOT, CDPS and CSP celebrate opening of new, updated Eisenhower Johnson Memorial Tunnels Traffic Operations Center|author=Colorado Department of Transportation|url=https://www.codot.gov/news/2023/november/cdot-cdps-csp-celebrate-new-ejmt-traffic-operations-center|date=November 7, 2023|access-date=November 30, 2023}}

=Plane crash during construction=

{{Main article|Wichita State University football team plane crash}}

On Friday, October 2, 1970, during the tunnel's construction, workers constructing the tunnel were among the first on scene of a plane crash that had occurred less than {{convert|2|mi|km|spell=in}} northeast of the east portal.{{cite news |url = https://news.google.com/newspapers?id=AronAAAAIBAJ&sjid=ckoDAAAAIBAJ&pg=7016%2C577700 |newspaper = Deseret News |location = Salt Lake City |agency = Associated Press |title = Grid Plane Crash Kills 29 En Route to Logan |date = October 3, 1970 |page = 1A |via = Google News }} A Martin 4-0-4 charter aircraft, one of two carrying the college football team of Wichita State University, crashed just north of the highway ({{coord|39.6935|-105.8825}}). Of the 40 passengers and crew on board, only nine survived.{{cite book |author = National Transportation Safety Board |date = December 24, 1970 |url = http://www.airdisaster.com/reports/ntsb/AAR71-04.pdf |archive-url = https://web.archive.org/web/20051029134544/http://www.airdisaster.com/reports/ntsb/AAR71-04.pdf |archive-date = October 29, 2005 |title = Aircraft Accident Report: Martin 404M, N464M 8 Statute Miles West of Silver Plume, Colorado, October 2, 1970 |publisher = National Transportation Safety Board |id = NTSB-AAR-71-4, SA-421, File No. 3-1127 |url-status = usurped }} The team was on its way to a game with Utah State University in Logan and had recently refueled at Denver's Stapleton International Airport. The plane carrying the team's starters departed Denver and traveled a poorly planned scenic route. The other plane, carrying reserve players, followed the original route and landed safely in Logan.{{cite news |url = https://news.google.com/newspapers?id=8psgAAAAIBAJ&sjid=GWgFAAAAIBAJ&pg=1594%2C3600204 |newspaper = Lewiston Daily Sun |agency = Associated Press |last = Hilliard |first = Carl R. |title = Plane Crash Cripples Wichita St. Grid Team |date = October 3, 1970 |page = 1 |via = Google News }}

Water diversion

While the Eisenhower Tunnel was primarily intended as a transportation tunnel, it also serves as a water tunnel for water diversion from the western side of the Continental Divide to the eastern side. Water from the Straight Creek watershed (a tributary of the Blue River), along with all seepage entering the tunnel, is discharged into Clear Creek for delivery to the Coors Brewing Company. Typically, the tunnel delivers over {{convert|300|acre ft|m3}} of water per year.{{Cite book |first = John N. |last = Winchester |url = http://westernriversinstitute.org/wp-content/uploads/2012/12/USCID-Transmountain-Paper-.pdf |title = A Historical View: Transmountain Development in Colorado |archive-url = https://web.archive.org/web/20150807061159/http://westernriversinstitute.org/wp-content/uploads/2012/12/USCID-Transmountain-Paper-.pdf |archive-date = August 7, 2015 |year = 2000 |access-date = May 3, 2020 }}

See also