Çanta Wind Farm
{{Short description|Wind farm in northwestern Turkey}}
{{Infobox power station
| name = Çanta Wind Farm
| name_official = Çanta Rüzgar Enerji Santrali
| image = ÇantaWindFarm06.JPG
| image_caption = The Çanta Wind Farm
| image_alt = Three windmills in a field at golden hour
| coordinates = {{coord|41|06|50|N|28|03|30|E|type:landmark|display=inline,title}}
| country = Turkey
| location = Çanta, Silivri, Istanbul Province
| status = O
| construction_began = 2012
| commissioned = {{start date and age|2014|05|31}}
| decommissioned =
| cost =
| owner = Boydak Enerji
| operator = Boydak Enerji
| ps_units_operational = 19
| ps_units_manu_model = Nordex N100/2500
| wind_hub_height =
| wind_rotor_diameter =
| wind_rated_speed =
| wind_farm_type = onshore
| ps_site_elevation =
| wind_site_usage =
| ps_site_area =
| ps_electrical_capacity = 19 X 2.5 MW
| ps_electrical_cap_fac =
| ps_annual_generation = 151 GWh
| website =
| extra =
}}Çanta Wind Farm is a 2014 wind power plant consisting of 19 wind turbines with a total installed capacity of 47.5 MW. The wind farm is in Çanta in the Silivri district of Istanbul Province, northwestern Turkey.
The wind farm was initially projected by Bora Wind Energy Company in 2011. After Boydak Energy Company took over Bora Co., construction began in 2012. The farm went into production in May 2014 with six turbines, each with a capacity to generate 2.5 MW. By the end of June 2014, eight more turbines were in service, increasing the total installed capacity to 35 MW.
Location
The wind farm is located on a {{convert|240|m|ft|abbr=on}}-high hill northwest of Çanta town, just east of the provincial border between Tekirdağ and Istanbul. It is at a distance of {{convert|27|km|mi|abbr=on}} to Çorlu, {{convert|17|km|mi|abbr=on}} to Silivri and {{convert|83|km|mi|abbr=on}} to Istanbul.
Technical details
Maximum power output of each of the 19 turbines supplied by Nordex in Germany is 2.5 MW, and the total annual energy production is about 151 GWh. The turbines of type N100/2500 have {{convert|100|m|ft|abbr=on}} rotor diameter.
Average annual wind speed at the site is given with {{convert|7.5|-|8.5|m/s|ft/s|abbr=on}}.
See also
{{stack|{{Portal|Turkey|Weather|Renewable energy}}}}
References
{{reflist|30em|refs=
}}
External links
{{commons category|Çanta Wind Farm}}
{{Power stations in Turkey}}
{{DEFAULTSORT:Canta Wind Farm}}
Category:Energy infrastructure completed in 2014
Category:2014 establishments in Turkey