Arad–Szeged pipeline

{{Infobox pipeline

| name = Arad–Szeged pipeline

| type = natural gas

| photo =

| caption =

| map =

| map_caption = Location of Arad–Szeged pipeline

| country = Romania and Hungary

| coordinates =

| operator = MOL and Transgaz

| partners = MOL and Transgaz

| length_km = 109

| discharge = 4.4 billion cubic meters (0.15 Tcf) per year

| diameter_in = 27.5

| direction = east–west

| start = Arad, Romania

| finish = Szeged, Hungary

| expected = 2010

| est =

| through = Romania and Hungary

| par =

}}

The Arad–Szeged pipeline is a natural gas pipeline from Arad in Romania to Szeged in Hungary diversifying natural gas suppliers and delivery routes for the two countries and connects the two natural gas national grids. The pipeline attempts to lessen the two country's dependence on Russian energy.{{cite web | url = http://www.adevarul.ro/financiar/Conducta_de_gaze_Arad-Szeged_va_fi_operationala_din_aceasta_luna_0_183581893.html | title = Conducta de gaze Arad-Szeged va fi operaţională din această lună | accessdate = August 25, 2010 | publisher = Adevarul | archiveurl= https://web.archive.org/web/20100726164648/http://www.adevarul.ro/financiar/Conducta_de_gaze_Arad-Szeged_va_fi_operationala_din_aceasta_luna_0_183581893.html| archivedate= 26 July 2010 | url-status= live}} The Arad–Szeged pipeline is part of the larger New European Transmission System meant to unite Central and South Eastern Europe's natural gas transmission networks.

Preparations for the project started in 2008 and the intergovernmental agreement between Romania and Hungary was signed on 1 July 2008. The project is developed by the consortium of two companies. The final investment decision was made at the end of 2008. The pipeline is expected to be operational by September 2010 and it will carry 4.4 billion cubic meters of natural gas per year.{{cite web | url = http://www.wall-street.ro/articol/Economie/89545/Conducta-de-gaze-Arad-Szeged-va-fi-inaugurata-pe-29-iulie.html | title = Conducta de gaze Arad-Szeged va fi inaugurata pe 29 iulie | accessdate = August 25, 2010 | publisher = Wall Street Journal}}

History

The agreement between Romanian gas company Transgaz and Hungarian oil and gas company MOL was signed on 1 July 2008. The intergovernmental agreement to build a natural gas pipeline between countries was signed in May 2010 in Arad.{{cite web|url=http://www.fgsz.hu/node/287 |title=FGSZ and Transgaz signed a Development Agreement |accessdate=August 25, 2010 |publisher=FGSZ |url-status=dead |archiveurl=https://web.archive.org/web/20110721104854/http://www.fgsz.hu/node/287 |archivedate=July 21, 2011 }} The pipeline was supposed to be inaugurated on 29 July 2010 but was postponed until September due to construction issues on the Hungarian side. The pipeline is supposed to be inaugurated by the European Commissioner for Energy Günther Oettinger.

Technical description

The length of the Romanian section is {{convert|62|km|mi}}. The length of Hungarian section is {{convert|47|km|mi|0}}. The diameter of pipeline is {{convert|27.5|in|mm}} and the capacity is 4.4 billion cubic meter (bcm) of natural gas per annum. The total cost of the pipeline was around €68 million (US$85 million) and the construction cost was 48% for the Romanian section and 52% for the Hungarian section. The two sections meet near the Hungarian/Romanian border at Csanádpalota/Nădlac.{{cite web|url=http://www.sfin.ro/articol_20581/misterele_conductei_de_gaze_arad-szeged.html |title=Misterele conductei de gaze Arad-Szeged |accessdate=August 25, 2010 |publisher=Saptamana Financiara |url-status=dead |archiveurl=https://web.archive.org/web/20110221043519/http://www.sfin.ro/articol_20581/misterele_conductei_de_gaze_arad-szeged.html |archivedate=February 21, 2011 }}

See also

References