Fervo Energy

{{Short description|Geothermal energy company}}

{{Use mdy dates|date=April 2024}}

Fervo Energy is an energy resource company focused on harnessing heat through enhanced geothermal systems (EGS). It was co-founded in 2017 by Tim Latimer, a mechanical engineer who worked as a drilling engineer at BHP until 2015. His departure from the oil and gas sector was driven by a desire to apply techniques observed during the shale revolution to geothermal extraction.{{Cite web |title=The U.S. Shale Revolution |url=https://www.strausscenter.org/energy-and-security-project/the-u-s-shale-revolution/ |access-date=2024-02-16 |website=The Strauss Center |language=en-US}}{{Cite web |date=2023-07-18 |first1=Jack Hunter |last1=Norbeck |first2=Timothy |last2=Latimer|type=preprint submitted to EarthArXiv |title=Commercial-Scale Demonstration of a First-of-a-Kind Enhanced Geothermal System |url=https://eartharxiv.org/repository/view/5704/ |access-date=2024-04-08 |website=eartharxiv.org|language=en-US}}

On July 18, 2023, Fervo Energy announced that their first pilot geothermal plant was successful in generating 3.5 MW (megawatts) of baseload power and consistently maintained flow rates of 60 liters per second (l/s).

Financing

Fervo Energy has been backed by over $400 million USD in equity or non-equity backed funding and approximately $17 million in non-dilutive grants. In the third quarter of 2022, Fervo Energy received $22 million of series C funding from a multitude of venture capitalists. In 2021, Fervo Energy partnered with Alphabet, the parent company of Google, in hopes that Fervo can provide green electricity to Alphabet's cooling centres in the Las Vegas cloud region which met the three demands of Alphabet: baseload, green sourced and nearby.{{Cite web |date=2023-07-18 |title=Fervo Energy Announces Technology Breakthrough in Next-Generation Geothermal - Fervo Energy |url=https://fervoenergy.com/fervo-energy-announces-technology-breakthrough-in-next-generation-geothermal/ |access-date=2024-02-16 |website=fervoenergy.com |language=en-US}}{{Cite web |title=A first-of-its-kind geothermal project is now operational|first=Michael |last=Terrell|date=November 28, 2023|work=The Keyword|publisher=Google |url=https://blog.google/outreach-initiatives/sustainability/google-fervo-geothermal-energy-partnership/}}

History

Shale fracking methodologies were proposed for geothermal use in 2013 by Mark Mclure, who became a technical consultant at Fervo energy.

File:An-EGS-doublet-of-horizontal-wells-connected-by-vertical-fracture-stages-normal-or.png

Mclure and co-author Sogo Shiowaza claimed that the combination of horizontal drilling and fracking had the potential to de-risk EGS systems. As long as sufficient heat is available, EGS can produce viable amounts of electrical energy.{{Cite web |first1=Sogo |last1=Shiozawa|first2=Mark W. |last2=McClure|type=conference paper |title=EGS designs with horizontal wells, multiple stages, and proppant |url=https://www.researchgate.net/publication/265127214_EGS_designs_with_horizontal_wells_multiple_stages_and_proppant}}

EGS has struggled in to become cost-competitive with other carbon-neutral electricity.{{Cite web |title=DOE Launches New Energy Earthshot to Slash the Cost of Geothermal Power |url=https://www.energy.gov/articles/doe-launches-new-energy-earthshot-slash-cost-geothermal-power |access-date=2024-03-21 |website=Energy.gov |language=en}} Vertical wells may encounter thermal short circuiting.{{cite conference |type=conference paper |last1=Gradl |first1=Christian |conference=43rd Workshop on Geothermal Reservoir Engineering |title=Review of Recent Unconventional Completion Innovations and their Applicability to EGS Wells |url=https://www.researchgate.net/publication/323399412_Review_of_Recent_Unconventional_Completion_Innovations_and_their_Applicability_to_EGS_Wells |location=Stanford, California |date=February 2018}} Shallower induced fractures transmit heat better than deeper ones. This is often due to less normal stress at shallower depth and higher viscosity while deeper fractures have the opposite effects. This causes certain fractures to produce different water temperatures where they meet at the production well, negating heating effects.

Another issue is zonal isolation. Modelling induced fracturing is simple, however modeling deeper holes is less accurate, leaving, leading to fractures disconnected from the production well.

Horizontal drilling proposes to tackle both thermal short circuiting and zonal isolation by having the producing reservoir at a constant depth. By drilling the injection and production horizontally, all induced fractures are in the same normal stress field and temperature zone and thus have the same viscosity, eliminating the potential of short circuits. To induce optimal fractures, Fervo uses the plug and perforation method, again adopted from the unconventional oil industry. The plug and perforation system isolates stages to decrease chances of unwanted interactions when the fractures are first initiated.{{Cite web |date=2011-10-04 |title=Multistage fracturing using plug-and-perf systems |url=https://www.worldoil.com/magazine/2011/october-2011/features/multistage-fracturing-using-plug-and-perf-systems# |access-date=2024-02-18 |website=www.worldoil.com |language=en}}{{Cite web |last=Munsell |first=Faith |date=2017-09-28 |title=Pinpoint-Entry Fracturing vs. Plug and Perf |url=https://www.keystoneenergytools.com/pinpoint-entry-fracturing-vs-plug-perf/ |access-date=2024-02-19 |website=Keystone Energy Tools |language=en-US}}

Pilot projects

= Drilling demonstrations & Nevada Operation =

On July 18, 2023, Fervo Energy announced the completion of its first geothermal plant in Nevada.{{Cite web |last=Clifford |first=Catherine |date=2023-07-18 |title=Fervo Energy hits milestone in using oil drilling technology to tap geothermal energy |url=https://www.cnbc.com/2023/07/18/fervo-energy-hits-milestone-using-oil-drilling-tech-to-tap-geothermal.html |access-date=2024-03-21 |website=CNBC |language=en}} Project Red marked the world's first use of horizontal wells in an EGS system. The primary aim was to demonstrate the viability of horizontal drilling in geothermal applications.{{Cite web |date=2023-11-28 |title=America's first 'enhanced' geothermal plant just got up and running |url=https://www.canarymedia.com/articles/geothermal/americas-first-enhanced-geothermal-plant-just-got-up-and-running |access-date=2024-06-27 |website=Canary Media |language=en}} The two wells attained a true vertical depth of 8,000 feet, with horizontal sections extending 3,250 feet. The project sustained drilling rates of 75 feet per hour in a geological setting of hard metasedimentary and igneous formations. This ranked the project in the top quartile of drilling rates for hard rock formations. The geothermal gradient measured approximately 75°C/km. The plant attained flow rates of 60 l/s, generating a baseload of 3.5MW of electric power, roughly adequate to power 2000 households.{{Cite web |title=California ISO - Understanding electricity |url=https://www.caiso.com/about/Pages/OurBusiness/Understanding-electricity.aspx#:~:text=One%20megawatt%20equals%20one%20million,of%20750%20homes%20at%20once. |access-date=2024-02-19 |website=www.caiso.com}}

The National Renewable Energy Laboratory (NREL) had predicted the technical aspects of EGS over the years. In 2022 it had forecasted that flow rates of 60 l/s would be attainable under a "moderate case" scenario by 2035.{{Cite web |title=Geothermal {{!}} Electricity {{!}} 2023 {{!}} ATB {{!}} NREL |url=https://atb.nrel.gov/electricity/2023/geothermal |access-date=2024-02-19 |website=atb.nrel.gov |language=en}} Fervo accomplished this in 2023, albeit at a notably higher levelized cost of electricity (LCOE). Fervo's ongoing efforts are focused on scaling up production and reducing costs.

The site will become the Corsac Station Enhanced Geothermal Project, generating 115 MW, to be sold to NV Energy and in turn Google.

= Cape Station Project =

On September 25, 2023, Fervo held its groundbreaking ceremony for the Cape Station Geothermal Project in southwest Utah. Beaver County has geothermal gradients ranging from 50°C to 500°C/km. However, most boreholes indicated a geothermal gradient between 70°C and 100°C/km.{{Cite journal |last=Blackett |first=Robert |date=February 2004 |title=GEOTHERMAL GRADIENT DATA FOR UTAH |url=http://large.stanford.edu/publications/power/references/docs/utah_temp_grad.pdf |journal=Stanford}} Fervo estimated that the plant has the potential to generate up to 400MW of electrical power by 2028. To increase electrical production and scale the previous design, Fervo proposed multiple horizontal wells stacked upon each other, with each level having its own injection and production well to limit short-circuiting. Lateral well lengths were proposed to be increased to beyond 10,000 feet, with casing diameter widened up to 13 3/8" to decrease wellbore friction.{{cite journal |url=https://www.researchgate.net/figure/Effect-of-flow-rate-and-well-length-on-wellbore-friction_fig2_245418170 |last1=Penmatcha |first1=V. R. |last2=Arbabi |first2=Sepehr |last3=Aziz |first3=Khalid |title=Effects of Pressure Drop in Horizontal Wells and Optimum Well Length |journal=SPE Journal |date=1 September 1999 |volume=4 |issue=03 |pages=215–223 |doi=10.2118/57193-PA}}

If successful, this project would be the world's largest EGS plant (by energy production), surpassing the Cooper Basin Project in Australia by 8-fold.{{Cite web |title=Cooper Basin Enhanced Geothermal Systems |url=https://arena.gov.au/projects/cooper-basin-enhanced-geothermal-systems-heat-and-power-development/ |access-date=2024-02-19 |website=Australian Renewable Energy Agency |language=en-AU}} Fervo claimed that the project would generate over 6,000 jobs during construction, generating $437 million in wages. It was expected to start generating electricity in 2026.{{Cite web |title=Fracking for heat: Utah could become home to world’s largest enhanced geothermal plant |url=https://www.sltrib.com/news/2024/03/09/fracking-heat-utah-could-become/ |access-date=2024-06-27 |website=The Salt Lake Tribune |language=en-US}}

In June 2024, Fervo announced the project had contracted to sell 320 MW to Southern California Edison.{{Cite web |last=Roth |first=Sammy |date=2024-06-25 |title=Column: Good news for 100% clean energy. Geothermal has finally arrived |url=https://www.latimes.com/environment/newsletter/2024-06-25/column-get-ready-california-geothermal-energy-has-finally-arrived-boiling-point |access-date=2024-06-27 |website=Los Angeles Times |language=en-US}}

References

{{reflist}}