First Canadian Place

{{Short description|Skyscraper in Toronto, Canada}}

{{Infobox building

| name = First Canadian Place

| image = First Canadian Place August 2018 01.jpg

| image_size = 250px

| caption = First Canadian Place in 2017

| logo = First Canadian Place logo.png

| alternate_names = FCP

| former_names =

| location = 100 King Street West
Toronto, Ontario, Canada

| coordinates = {{coord|43|38|55.6|N|79|22|54.1|W|type:landmark_region:CA-ON|display=inline,title}}

| highest_region = Canada

| highest_start = 1975

| highest_prev = Commerce Court West

| completion_date = 5 June 1975

| building_type = Commercial offices

| architectural = {{convert|298.1|m|abbr=on}}

| tip = {{convert|355|m|abbr=on}}

| top_floor = {{convert|289.9|m|abbr=on}}

| floor_count = 72
4 below ground

| elevator_count = 61

| cost =

| floor_area = {{convert|250849|m2|abbr=on}}

| architect = Bregman + Hamann Architects
Edward Durell Stone & Associates

| structural_engineer=

| main_contractor = EllisDon Corporation

| developer = Olympia and York

| owner = Manulife Financial Corporation (50%), CPP (50%)

| management = Brookfield Properties

|website = {{URL|https://fcpex.ca/}}

| references = {{CTBUH|543}}{{Cite web |url=https://www.emporis.com/buildings/112676 |archive-url=https://web.archive.org/web/20150407180013/https://www.emporis.com/buildings/112676 |url-status=usurped |archive-date=April 7, 2015 |title=Emporis building ID 112676 |work=Emporis}}{{Glass Steel and Stone|3506}}{{SkyscraperPage|34}}{{Structurae|20003283}}

}}

First Canadian Place is a skyscraper in the Financial District of Toronto, Ontario, at the northwest corner of King and Bay streets, and serves as the global operational executive office of the Bank of Montreal. At {{convert|298|m|abbr=on}}, it is the tallest building in Canada, the 34th tallest building in North America, and the 243rd tallest in the world. It is also the third tallest free-standing structure in Canada, after the CN Tower (also in Toronto) and the Inco Superstack chimney (projected to be demolished) in Sudbury, Ontario. The building is owned by Manulife Financial Corporation (50%) in addition to a private consortium of investors including CPP Investments. The building is managed by Brookfield Properties.

History and architecture

File:-First Canadian Place under construction-3.jpg

First Canadian Place is named for Canada's first bank, the Bank of Montreal. The main building in the complex was intended to be known as "First Canadian Bank Tower."{{cite news |title=Builder starts battle for giant project |url=https://www.newspapers.com/article/the-toronto-star-builder-starts-battle/165040908/ |work=The Toronto Star |date=3 November 1973 |location=Toronto ON |page=3 |format=Newspapers.com}} Designed by B+H Architects with Edward Durell Stone as a design consultant, construction was completed in 1975.

The tower and associated buildings occupy a block once home to two major newspapers, the Toronto Star’s Toronto Star Building and The Globe and Mail{{'}}s William H. Wright Building. The site was the last of the corners at King and Bay to be redeveloped in the 1960s and 1970s, and a major bidding war began over the property. The then-little-known firm of Olympia and York eventually obtained nearly the whole city block, but the election of reformist mayor David Crombie led to new rules banning skyscrapers. It took three years of lobbying before permission for First Canadian Place was granted. When completed, the building was nearly identical in appearance to Stone's Standard Oil Building in Chicago, Illinois;{{Cite news| last=McMillan| first=Greg| title=Two buildings, two cities, one problem| newspaper=The Globe and Mail| page=B10| date=12 June 2007| url=http://www.therealdominican.com/pdf/GLobmarble.pdf| access-date=24 September 2009| archive-url=https://web.archive.org/web/20110717023737/http://www.therealdominican.com/pdf/GLobmarble.pdf| archive-date=17 July 2011| url-status=dead}} completed two years previous, the Chicago tower is of the same floor plan and clad in the same marble,{{cite web| url=http://www.skyscraper.org/EXHIBITIONS/BIG_BUILDINGS/CONTENT/jumbos/j_15.htm| title=First Canadian Place| publisher=The Skyscraper Museum| access-date=24 September 2009}} the only overtly visible difference being the vertical orientation of the windows, as opposed to the horizontal run of those on First Canadian Place.

First Canadian Place was the 6th tallest building in the world to structural top (currently 103rd) and the tallest building overall outside of Chicago and New York when completed in 1975. It was also the tallest building in the Commonwealth of Nations until the completion of the Petronas Towers in Kuala Lumpur, Malaysia, in 1998. The Bank of Montreal "M-bar" logo at the top of the building was the highest sign in the world from 1975 until overtaken by the sign atop CITIC Plaza in 1997. The roof is still the location of a number of antennas used for radio and television broadcasting. The structure contains 29 elevators, and is one of only a few buildings in the world that uses the double-decked variety, and is connected to the underground PATH system.

The building was pictured on the front and rear cover of the 1981 album This Is the Ice Age by Canadian New Wave band Martha and the Muffins and also their 7" single "Women Around the World at Work". The album featured two photos which were taken from the same place but at different times by Muffins guitarist Mark Gane using a time-lapse camera and features the building at midday and dusk. The 7" cover again features the same photo but has 9 small images taken at various times of the day and night.

=Cladding=

{{multiple image

| align = left

| width1 =

| image1 = Toronto - ON - First Canadian Place.jpg

| caption1 = FCP in 2008 prior to recladding

| width2 =

| image2 = FCP-recladding.jpg

| caption2 = New cladding being installed in 2011

| total_width = 300

}}

File:CN Tower SkyPod 2023b.jpg SkyPod in 2023]]

The same white Carrara marble used on Stone's Aon Center (in Chicago) was employed as an exterior cladding and interior finish for First Canadian Place, with approximately 45,000 marble panels weighing around {{convert|200|to|300|lb|abbr=on}} each. Foreshadowing what would take place with First Canadian Place in 2007, one of the marble slabs of Aon Center, when it was named the Standard Oil Building, detached in 1974, falling and penetrating the roof of a neighbouring building, resulting in an eventual recladding of the entire Aon Center in white granite between 1992 and 1994. This problem would surface at First Canadian Place as well, during an intense storm on the evening of 15 May 2007, a {{convert|1|by|1.2|m|abbr=on}}, {{convert|140|kg|abbr=on}} white marble panel fell from the 60th storey of the tower's southern face onto the 3rd-floor mezzanine roof below, causing authorities to close surrounding streets as a precaution.{{Cite news| last=Doolittle| first=Robyn| title=King St. to stay closed| newspaper=Toronto Star| date=16 May 2007| url=https://www.thestar.com/news/2007/05/16/king_st_to_stay_closed.html| access-date=2014-05-02}}{{cite news| title=Commuters Dread Second Day Of Gridlock As King St. Stays Closed| work=CityNews| date=16 May 2007| url=https://toronto.citynews.ca/2007/05/16/commuters-dread-second-day-of-gridlock-as-king-st-stays-closed/| access-date=16 May 2007| archive-url=https://web.archive.org/web/20070518044054/http://www.citynews.ca/news/news_11040.aspx| archive-date=18 May 2007| url-status=live}}

In late 2009, owner Brookfield Properties announced it would follow the example of Aon Center and, over three years, replace the tower's 45,000 marble panels with new ones in glass, those on the main expanses with a white ceramic frit and the corners in a bronze tint.{{cite news |first=Jennifer |last=Yang |title=Bay St. landmark to lose its marble |url=https://www.thestar.com/news/gta/article/700822 |newspaper=Toronto Star |date=2009-09-25 |access-date=25 September 2009}}{{cite press release| title=Brookfield Properties Announces Recladding of First Canadian Place in Toronto| url=http://brookfieldofficeproperties.com/content/2009_news_releases/brookfield_properties_announces_recladding_of_firs-3512.html| publisher=Brookfield Properties| date=23 September 2009| access-date=2014-05-02| archive-date=2013-10-22| archive-url=https://web.archive.org/web/20131022025759/http://brookfieldofficeproperties.com/content/2009_news_releases/brookfield_properties_announces_recladding_of_firs-3512.html| url-status=dead}} Brookfield and the co-owners also launched a multi-faceted rejuvenation program, including "upgrades to the building's mechanical, electrical, and lighting systems that will redefine the standard for enhanced performance, comfort, and greening". FCP's common areas including upper and lower level entrance and elevator lobbies, the retail concourse and Market Place were to also undergo renovation, with new natural stone flooring, fritted glass accents, brushed metal handrails, landscaping, and water features. The rejuvenation program design architects were Moed de Armas & Shannon Architects and Bregman + Hamann Architects were the architects of record. The entire project, completed in 2012,{{cite web|title=First Canadian Place – Recladding |url=http://www.bharchitects.com/en/projects/92 |publisher=B+H |access-date=27 January 2015 |archive-url=https://web.archive.org/web/20150111071432/http://www.bharchitects.com/en/projects/92 |archive-date=11 January 2015 |url-status=dead }} cost was in excess of CA$100 million, paid by the owner. This extensive capital improvement project was intended to provide a new exterior for FCP and eliminate the maintenance costs associated with marble upkeep.

Tenants

File:First Canadian Place Office Lobby 2021.jpg

=Broadcasting=

The following Toronto-area broadcasters have their transmitters atop First Canadian Place:{{cite web| title=Tower Site of the Week: First Canadian Place, Toronto| date=12 August 2006| url=http://www.fybush.com/sites/2006/site-061208.html| access-date=2014-05-02}}

;FM stations

# backup transmitter; main transmitter on CN Tower

+ synchronous transmitter; provides supplementary coverage to primary transmitter in Ajax

* fill-in transmitter; serves downtown core and surrounding inner-city neighbourhoods

In addition, an amateur radio digital mobile radio repeater for the Greater Toronto area (VA3XPR) has its antennas mounted just above the broadcast antennas on the radio mast.[http://www.va3xpr.net/va3xpr-moves-canadas-tallest-building-blanketing-toronto-dmr-coverage/ VA3XPR website] There are also other analog ham repeaters on the building.

=Shopping mall=

According to the First Canadian Place website,{{cite web| title=About Us| publisher=First Canadian Place| url=http://www.myfirstcanadianplace.com/aboutus.aspx| access-date=1 July 2013}} the lower floors of the building, as part of the Toronto Path system, feature:

{{col div}}

  • 120 stores in three floors of Carrara marble
  • 6 restaurants
  • over 30 eateries
  • medical centre, featuring an optometrist`s office and dental clinics
  • spas, beauty salons, and a barbershop
  • banking and financial planning services from the Bank of Montreal
  • dry cleaning and shoe repair
  • post office
  • FedEx and UPS dropbox
  • a parkette on King Street, between the FCP and the Exchange Tower

{{div col end}}

Gallery

Bank of Montreal in First Canadian Place 2021.jpg|The building podium at the northwest corner of King and Bay streets

First Canadian Place Office Lobby-1 2021.jpg|Fountain inside the building

First Canadian Place Open Space 202112.jpg |Open space

First Canadian Place Basement PATH 2021.jpg |Basement Access

First Canadian Place basement restaurants and supermarket 202112.jpg|Basement supermarket and food stall

First Canadian Place Arcade 2021.jpg|Shopping Mall

First Canadian Place Level 2 Food Court 2021.jpg |Food Court in Level 2

See also

References

{{Reflist|2}}