Green Line (Chennai Metro)

{{Short description|Transit line in Chennai, India}}

{{Use dmy dates|date=May 2018}}

{{Use Indian English|date=May 2018}}

{{Infobox rail line

| name = Green Line

| native_name =

| native_name_lang =

| color = {{rail color|Chennai Metro|Green}}

| image = Chennai Metro Rail at Koyambedu.JPG

| image_width =

| image_alt =

| caption = A metro train on the Green line entering Koyambedu station

| type = Rapid transit

| system = Chennai Metro

| status = Fully Operational

| locale = Chennai

| start = {{stl|Chennai Metro|Chennai Central}}

| end = {{stl|Chennai Metro|St. Thomas Mount}}

| connectinglines = Operational (5):
{{rcb|Chennai Metro|Blue|croute}} {{rbox|Chennai MRTS|Chennai Mass Rapid Transit System|#{{rail color|Chennai MRTS|1}}}}, {{rbox|Chennai Suburban West Line|West Line, Chennai Suburban|#{{rail color|Chennai Suburban|West}}}}, {{rbox|Chennai Suburban South Line|South Line, Chennai Suburban|#{{rail color|Chennai Suburban|South}}}}, {{rbox|Chennai Suburban South West Line|South West Line, Chennai Suburban|#{{rail color|Chennai Suburban|South}}}}
Upcoming (3):
{{rcb|Chennai Metro|Purple|croute}} {{rcb|Chennai Metro|Red|croute}} {{rcb|Chennai Metro|Orange|croute}}

| stations = 17

| routes =

| daily_ridership =

| ridership2 =

| open = {{Start date|2015|09|25|df=y}}

| close =

| operator = Chennai Metro Rail Limited

| character = {{cvt|9.7|km}} Underground
{{cvt|12.3|km}} Elevated

| depot = Koyambedu

| stock = Alstom

| linelength_km = 22

| tracklength =

| tracks = 2

| gauge = {{Track gauge|sg|allk=on}}

| electrification = {{25 kV 50 Hz}} overhead catenary

| speed_km/h = 80

| elevation =

| map = {{Chennai Metro Green Line Route}}

| map_name =

| map_state = collapsed

}}

The Green Line is one of the two operational lines of Chennai Metro apart from the Blue line in the city of Chennai. The line stretches from {{stl|Chennai Metro|Chennai Central}} to {{stl|Chennai Metro|St. Thomas Mount}}, covering a distance of {{cvt|22|km}}. The line consists of 17 stations out of which nine stations are underground and the rest are elevated or on ground level.

Planning for the metro started in 2007-08 with the construction commencing in February 2009. Testing began in 2014, and the Commissioner of Metro Rail Safety approved the operations in January 2015. On 29 June 2015, commercial operations started between Alandur and Koyambedu stations on the green line with the first underground section between Thirumangalam to Nehru Park operational on 14 May 2017, which was later extended to Chennai Central on 25 May 2018.

Planning and construction

In 2006, a modern metro rail system was planned for Chennai modeled after the Delhi Metro.{{cite news|title=Metro is a financial success, not just a technological one|url=https://www.livemint.com/Politics/mcQh3ZfkfIHQ3Q7zkwOQUP/8216Metro-is-a-financial-success-not-just-a-technologica.html|access-date=13 November 2019|newspaper=Livemint|date=11 September 2007|archive-date=13 November 2019|archive-url=https://web.archive.org/web/20191113161153/https://www.livemint.com/Politics/mcQh3ZfkfIHQ3Q7zkwOQUP/8216Metro-is-a-financial-success-not-just-a-technologica.html|url-status=live}}{{cite press release|url=https://chennaimetrorail.org/wp-content/uploads/2015/11/pre2.pdf|title=Chennai Metro Rail Project approved by Government of India|date=28 January 2009|access-date=1 December 2023|publisher=Chennai Metro Rail Limited|archive-date=8 April 2023|archive-url=https://web.archive.org/web/20230408220627/https://chennaimetrorail.org/wp-content/uploads/2015/11/pre2.pdf|url-status=live}} Delhi Metro Rail Corporation (DMRC) was tasked with preparing a detailed project report on the implementation of metro system in Chennai. Based on the report, the Government of Tamil Nadu approved the first phase of the project in November 2007.{{cite news|url=https://chennaimetrorail.org/faq/|title=Chennai Metro Rail FAQ|publisher=Chennai Metro Rail Limited|access-date=16 February 2018|archive-date=27 February 2018|archive-url=https://web.archive.org/web/20180227110901/http://chennaimetrorail.org/faq/|url-status=live}} The first phase was planned with two lines covering {{cvt|45.1|km}} with {{cvt|25|km|1}} being underground. The first corridor would connect Washermanpet with Chennai International Airport extending for {{cvt|23.1|km}} with {{cvt|14.3|km}} being underground. In December 2007, Chennai Metro Rail Limited (CMRL) was incorporated and the Government of India gave approval for the project in January 2009.{{cite news|url=http://timesofindia.indiatimes.com/Cities/Centres_nod_for_Metro_Rail_in_Chennai/articleshow/2955314.cms|title=Center nod for Metro Rail in Chennai|newspaper=The Times of India|date=16 April 2008|access-date=20 August 2010|archive-date=25 June 2008|archive-url=https://web.archive.org/web/20080625071526/http://timesofindia.indiatimes.com/Cities/Centres_nod_for_Metro_Rail_in_Chennai/articleshow/2955314.cms|url-status=live}}

In February 2009, a {{INRconvert|199|c}} contract was awarded for the construction of a {{convert|4.5|km|4=2|abbr=on}} long viaduct along the Inner Ring Road between Koyambedu and Ashok Nagar.{{cite news|url=https://www.projectstoday.com/News/Soma-Enterprise-wins-Rs199-crore-Chennai-Metro-Rail-order|title=Soma Enterprise wins Rs.199 crore Chennai Metro Rail order|publisher=Projects Today|date=19 February 2009|access-date=16 August 2010|archive-date=28 April 2024|archive-url=https://web.archive.org/web/20240428064945/https://www.projectstoday.com/News/Soma-Enterprise-wins-Rs199-crore-Chennai-Metro-Rail-order|url-status=live}} The construction started on 10 June 2009.{{cite news|url=https://www.projectstoday.com/News/Work-commences-on-Chennai-metro|title=Work commences on Chennai Metro|publisher=Projects Today|date=11 June 2009|access-date=16 August 2010|archive-date=25 August 2017|archive-url=https://web.archive.org/web/20170825214006/http://www.projectstoday.com/News/Work-commences-on-Chennai-metro|url-status=live}} In August 2010, the contract for supplying rolling stock was awarded to Alstom.{{cite news|url=http://www.financialexpress.com/news/alstom-to-provide-2000-cars-for-chennais-metro/680434/|title=Alstom to provide 2000 cars for Chennai's metro|newspaper=The Financial Express|date=11 September 2010|access-date=18 September 2010|archive-date=29 January 2023|archive-url=https://web.archive.org/web/20230129132421/http://www.financialexpress.com/news/alstom-to-provide-2000-cars-for-chennais-metro/680434/|url-status=live}}{{cite press release|url= https://www.alstom.com/press-releases-news/2010/9/First-Metro-Rolling-Stock-contract-in-India-Alstom-to-provide-168-cars-for-Chennais-metro-for-243-million-20100909|title= First Metro Rolling Stock contract in India|publisher=Alstom Transport|date= 9 September 2010|access-date= 18 September 2010|archive-date= 15 April 2023|archive-url= https://web.archive.org/web/20230415155738/https://www.alstom.com/press-releases-news/2010/9/First-Metro-Rolling-Stock-contract-in-India-Alstom-to-provide-168-cars-for-Chennais-metro-for-243-million-20100909|url-status= live}} In January 2011, a joint venture between Larsen and Toubro and Alstom was awarded the contract for design and construction of track works and a depot at Koyambedu for {{INRconvert|449.22|c}}.{{cite news|url=https://www.business-standard.com/article/companies/l-t-alstom-jv-wins-chennai-metro-track-work-project-111012200037_1.html|title=L&T, Alstom JV bags Chennai Metro project|newspaper=Business Standard|access-date=14 February 2018|archive-date=10 February 2018|archive-url=https://web.archive.org/web/20180210060318/http://www.business-standard.com/article/companies/l-t-alstom-jv-wins-chennai-metro-track-work-project-111012200037_1.html|url-status=live}}{{cite news|url=http://www.thehindubusinessline.in/2011/01/22/stories/2011012251870200.htm|title=L&T, Alstom venture bags Chennai Metro project|newspaper=The Hindu|date=22 January 2011|access-date=6 June 2016|archive-date=2 November 2013|archive-url=https://web.archive.org/web/20131102084444/http://www.thehindubusinessline.in/2011/01/22/stories/2011012251870200.htm|url-status=live}}

On 14 February 2014, the maiden trial run was conducted between Koyambedu and Ashok Nagar stations.{{cite news|url=http://www.newindianexpress.com/states/tamil_nadu/Metro-Rail-Rolls-Out-a-Surprise-with-Koyambedu-Pillar-trial-Run/2014/02/15/article2057593.ece|title=Metro Rail Rolls Out a Surprise with Koyambedu-Pillar trial Run|newspaper=New Indian Express|date=14 February 2014|access-date=2 October 2014|archive-date=15 September 2014|archive-url=https://web.archive.org/web/20140915025103/http://www.newindianexpress.com/states/tamil_nadu/Metro-Rail-Rolls-Out-a-Surprise-with-Koyambedu-Pillar-trial-Run/2014/02/15/article2057593.ece?|url-status=dead}}{{cite news|url=http://www.thehindubusinessline.com/news/states/chennai-metro-holds-trial-on-elevated-section/article5690070.ece|title=Chennai Metro holds trial on elevated section|newspaper=Business Line|date=14 February 2014|access-date=2 October 2014|archive-date=22 February 2014|archive-url=https://web.archive.org/web/20140222145830/http://www.thehindubusinessline.com/news/states/chennai-metro-holds-trial-on-elevated-section/article5690070.ece|url-status=live}} In August 2014, the metro received the statutory speed certification clearance from the Research Design and Standards Organisation.{{cite news|url=https://www.deccanchronicle.com/140904/nation-current-affairs/article/chennai-metro-one-stop-short-dream-run|title=Chennai Metro one stop short of dream run|newspaper=Deccan Chronicle|date=31 August 2014|access-date=6 June 2016|archive-date=4 March 2016|archive-url=https://web.archive.org/web/20160304035707/http://www.deccanchronicle.com/140904/nation-current-affairs/article/chennai-metro-one-stop-short-dream-run|url-status=live}}{{cite news|url=http://www.thehindu.com/news/cities/chennai/chen-infra/metro-rail-service-likely-to-begin-in-november/article6365435.ece|title=Metro rail service likely to begin in November|newspaper=The Hindu|date=31 August 2014|access-date=6 June 2016|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114064544/http://www.thehindu.com/news/cities/chennai/chen-infra/metro-rail-service-likely-to-begin-in-november/article6365435.ece|url-status=live}} In January 2015, a report was submitted to the Commissioner of Metro Rail Safety for approval.{{cite news|url=http://www.newindianexpress.com/states/tamil_nadu/1st-Phase-Metro-Tracks-Ready-for-Safety-Test/2015/01/03/article2601202.ece|title=1st Phase Metro Tracks Ready for Safety Test|date=3 January 2015|newspaper=The New Indian Express|access-date=6 June 2016|first=C|last=Shivakumar|archive-date=4 March 2016|archive-url=https://web.archive.org/web/20160304120642/http://www.newindianexpress.com/states/tamil_nadu/1st-Phase-Metro-Tracks-Ready-for-Safety-Test/2015/01/03/article2601202.ece|url-status=dead}} In April 2015, the Commissioner of Metro Rail Safety inspected the rolling stock and submitted the report to the Railway Board.{{cite news|url=http://www.thehindu.com/news/cities/chennai/metro-rail-safety-inspected/article7074828.ece|title=Metro Rail safety inspected|date=7 April 2015|first=Ramya|last=Kannan|newspaper=The Hindu|access-date=7 June 2016|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114064544/http://www.thehindu.com/news/cities/chennai/metro-rail-safety-inspected/article7074828.ece|url-status=live}}{{cite news|url=http://timesofindia.indiatimes.com/city/chennai/Koyambedu-Alandur-metro-closer-to-opening/articleshow/46831652.cms|title=Koyambedu-Alandur metro closer to opening|date=7 April 2015|newspaper=The Times of India|access-date=7 June 2016|archive-date=24 July 2016|archive-url=https://web.archive.org/web/20160724023055/http://timesofindia.indiatimes.com/city/chennai/Koyambedu-Alandur-metro-closer-to-opening/articleshow/46831652.cms|url-status=live}}{{cite news|url=http://www.thehindu.com/news/cities/chennai/conditional-clearance-for-metro-rail/article7155672.ece|title=Conditional clearance for Metro Rail|newspaper=The Hindu|date=28 April 2015|access-date=7 June 2016|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114064544/http://www.thehindu.com/news/cities/chennai/conditional-clearance-for-metro-rail/article7155672.ece|url-status=live}}

On 29 June 2015, commercial operations started between Alandur and Koyambedu stations on the green line.{{cite report|url=https://chennaimetrorail.org/wp-content/uploads/2015/11/CMRL-l-Newsletter-l-Aug-2015-l-Final-PDF.pdf|title=Chennai Metro Newsletter - August 2015|publisher=Chennai Metro|date=29 June 2015|access-date=7 June 2023|archive-date=20 October 2023|archive-url=https://web.archive.org/web/20231020114202/https://chennaimetrorail.org/wp-content/uploads/2015/11/CMRL-l-Newsletter-l-Aug-2015-l-Final-PDF.pdf|url-status=live}} On 14 May 2017, operations commenced in the first underground line between Thirumangalam to Nehru Park on the green line, which was extended to Chennai central on 25 May 2018.{{cite news|url=https://www.thehindu.com/news/cities/chennai/cmrl-underground-stretch-inauguration/article18451008.ece|title=Naidu, Palaniswami flag off underground stretch of Chennai Metro|last=Sekar|first=Sunitha|date=14 May 2017|newspaper=The Hindu|access-date=29 January 2019|issn=0971-751X|archive-date=26 February 2020|archive-url=https://web.archive.org/web/20200226060701/https://www.thehindu.com/news/cities/chennai/cmrl-underground-stretch-inauguration/article18451008.ece|url-status=live}}

class="wikitable"style="text-align:center;margin:auto;
Line Name

!colspan="2"|Terminals

!Stations

!Opened

!Map

rowspan="4" style="background:#{{rail color|Chennai Metro|Green}};|Green Line

|Koyambedu

|Alandur

|style="text-align:center"|7

|29 June 2015

|rowspan="4"| {{Rapid transit OSM map

|stroke-width = 5

|frame-align = center

|system_qid = Q20647027

|zoom = 11

|single_line = y

|stations = y

|stations_qid = Q20647027

|frame-width = 250

|frame-height = 200}}

{{Clear left}}

Alandur

|St. Thomas Mount

|style="text-align:center"|1

|14 October 2016

Koyambedu

|Nehru Park

|style="text-align:center"|7

|15 May 2017

Nehru Park

|Central

|style="text-align:center"|2

|25 May 2018

Infrastructure

The trains are operated on {{Railgauge|standard|allk=on}} double-tracked lines.{{cite news|last=Srinivasan|first=Meera|title=Countdown to Chennai Metro begins|newspaper=The Hindu|date=3 February 2013|url=http://www.thehindu.com/news/cities/chennai/countdown-to-chennai-metro-begins/article4373153.ece|access-date=3 February 2013|archive-date=5 February 2013|archive-url=https://web.archive.org/web/20130205052657/http://www.thehindu.com/news/cities/chennai/countdown-to-chennai-metro-begins/article4373153.ece?|url-status=live}} The average speed of operation is {{convert|85|km/h}} and maximum speed is {{convert|120|km/h}}.{{cite news|url=http://www.thehindu.com/news/cities/chennai/metro-rail-train-zips-over-city-roads/article5690361.ece|title=Metro rail train zips over city roads|newspaper=The Hindu|access-date=1 December 2023|date=6 June 2016|archive-date=26 October 2023|archive-url=https://web.archive.org/web/20231026221155/https://www.thehindu.com/news/cities/chennai/metro-rail-train-zips-over-city-roads/article5690361.ece|url-status=live}} Alstom supplies the rolling stock for the trains operated on the line.{{cite press release|url=http://www.alstom.com/press-centre/2013/5/alstom-completes-in-lapa-plant-the-first-train-for-chennai-metro-in-india/|title=Alstom completes in Lapa plant the first train for Chennai metro, in India|publisher=Alstom|date=May 2013|access-date=6 June 2016|archive-date=21 April 2016|archive-url=https://web.archive.org/web/20160421015113/http://www.alstom.com/press-centre/2013/5/alstom-completes-in-lapa-plant-the-first-train-for-chennai-metro-in-india/|url-status=live}} The trains are air-conditioned with electrically operated automatic sliding doors and have a first-class compartment with a dedicated section reserved for women.{{cite news|last=Sekar|first=Sunitha|url=https://www.thehindu.com/news/cities/chennai/chen-infra/all-aboard-chennai-metro/article6222070.ece|title=All aboard, Chennai Metro|newspaper=The Hindu|date=18 July 2014|access-date=15 July 2018|archive-date=15 February 2016|archive-url=https://web.archive.org/web/20160215081044/http://www.thehindu.com/news/cities/chennai/chen-infra/all-aboard-chennai-metro/article6222070.ece|url-status=live}} The trains operate on 25 kV AC traction catenary system.{{cite press release|url=https://www.alstom.com/press-releases-news/2010/9/First-Metro-Rolling-Stock-contract-in-India-Alstom-to-provide-168-cars-for-Chennais-metro-for-243-million-20100909|title=Alstom to provide 168 cars for Chennai's metro for 243 million|publisher=Alstom|date=1 September 2010|access-date=6 June 2023|archive-date=15 April 2023|archive-url=https://web.archive.org/web/20230415155738/https://www.alstom.com/press-releases-news/2010/9/First-Metro-Rolling-Stock-contract-in-India-Alstom-to-provide-168-cars-for-Chennais-metro-for-243-million-20100909|url-status=live}} The trains are connected to the grid via overhead electric cables and are equipped with regenerative braking with a capacity to recover 30–35% of the energy during braking.{{cite news|url=http://www.thehindu.com/news/cities/chennai/first-ride-in-a-chennai-metro-train/article5693933.ece?homepage=true|title=First ride in a Chennai Metro train|newspaper=The Hindu|access-date=6 June 2016|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114064544/http://www.thehindu.com/news/cities/chennai/first-ride-in-a-chennai-metro-train/article5693933.ece?homepage=true|url-status=live}} The electricity is supplied by Tamil Nadu Electricity Board.{{cite news|title=Metro rail sets up units to power trains, stations to meet year-end deadline to start services|newspaper=The Times of India|date=15 April 2014|url=http://timesofindia.indiatimes.com/City/Chennai/Metro-rail-sets-up-units-to-power-trains-stations-to-meet-year-end-deadline-to-start-services/articleshow/33757188.cms|access-date=18 April 2014|archive-date=18 April 2014|archive-url=https://web.archive.org/web/20140418044333/http://timesofindia.indiatimes.com/City/Chennai/Metro-rail-sets-up-units-to-power-trains-stations-to-meet-year-end-deadline-to-start-services/articleshow/33757188.cms|url-status=live}}

Network

File:Chennai Underground metrostation with India's first Platform Screen Doors.jpg in underground stations]]

{{See also|List of Chennai metro stations}}

A total of 26 stations are operational along the blue line with 13 underground stations. In the underground sections, a walkway runs along the length with cross passages every {{convert|250|m|ftin}} for the maintenance and emergency evacuation.{{cite news|last=Sekar|first=Sunitha|title=First underground Metro network by December 2015|newspaper=The Hindu|date=10 August 2014|url=http://www.thehindu.com/news/cities/chennai/first-underground-metro-network-by-dec-2015/article6299711.ece|access-date=4 October 2014|archive-date=15 February 2016|archive-url=https://web.archive.org/web/20160215081044/http://www.thehindu.com/news/cities/chennai/first-underground-metro-network-by-dec-2015/article6299711.ece|url-status=live}} The underground stations have an average width of {{convert|200|m|ftin}} and average depth of {{convert|20|ft}} from the ground level.{{cite web|url=https://chennaimetrorail.org/wp-content/uploads/2015/11/TimesofIndia20-09-2013.pdf|title=Metro's underground frame|publisher=Chennai Metro|date=20 September 2013|access-date=1 December 2023|archive-date=26 December 2023|archive-url=https://web.archive.org/web/20231226092603/https://chennaimetrorail.org/wp-content/uploads/2015/11/TimesofIndia20-09-2013.pdf|url-status=live}} The length of the stations in Phase 1 extension is {{convert|180|m|ftin}}.{{cite news|title=Metro Phase 1 extension tunneling nears completion|newspaper=The Hindu|access-date=29 September 2017|date=25 September 2017|url=http://www.thehindu.com/news/cities/chennai/metro-phase-1-extension-tunnelling-nears-completion/article19748619.ece|archive-date=26 February 2020|archive-url=https://web.archive.org/web/20200226060704/http://www.thehindu.com/news/cities/chennai/metro-phase-1-extension-tunnelling-nears-completion/article19748619.ece|url-status=live}}{{cite news|title=CMRL's compact stations have their own fan club|newspaper=The Hindu|location=Chennai|date=29 June 2018|url=https://www.thehindu.com/news/cities/chennai/cmrls-compact-stations-have-their-own-fan-club/article24283329.ece|access-date=15 July 2018|archive-date=30 January 2020|archive-url=https://web.archive.org/web/20200130025132/https://www.thehindu.com/news/cities/chennai/cmrls-compact-stations-have-their-own-fan-club/article24283329.ece|url-status=live}} The elevated stations have three levels with the concourse level at a minimum height of {{convert|5.5|m|ftin}} above the ground level and platform level above the concourse while the underground stations have two levels with platform screen doors.{{cite report|title=Chennai Metro Investment Project|work=Asian Development Bank|access-date=30 August 2023|url=https://www.adb.org/sites/default/files/project-documents/52234/52234-001-eia-en_5.pdf|archive-date=4 June 2023|archive-url=https://web.archive.org/web/20230604155819/https://www.adb.org/sites/default/files/project-documents/52234/52234-001-eia-en_5.pdf|url-status=live}} The stations are air-conditioned and are equipped to be disabled and elderly friendly, with automatic fare collection system, announcement system, electronic display boards, escalators and lifts.{{cite news|last=Sekar|first=Sunitha|title=No clarity on access at Chennai Metro stations yet, say disabled|newspaper=The Hindu|access-date=6 June 2016|date=20 January 2014|url=http://www.thehindu.com/news/cities/chennai/no-clarity-on-access-at-chennai-metro-stations-yet-say-disabled/article5594316.ece?ref=sliderNews|archive-date=4 February 2014|archive-url=https://web.archive.org/web/20140204020014/http://www.thehindu.com/news/cities/chennai/no-clarity-on-access-at-chennai-metro-stations-yet-say-disabled/article5594316.ece?ref=sliderNews|url-status=live}} Paid parking facilities are available for two wheelers in most stations and four wheelers in select stations.{{cite report|url=https://chennaimetrorail.org/wp-content/uploads/2018/06/Parking_Facilities_Availability_2018.pdf|title=Parking Facilities Availability 2018|publisher=chennaimetrorail.org|access-date=16 August 2010|archive-date=8 June 2019|archive-url=https://web.archive.org/web/20190608150016/https://chennaimetrorail.org/wp-content/uploads/2018/06/Parking_Facilities_Availability_2018.pdf|url-status=live}}

The line connects the central and the southwest ends of the city. The stations include:

class="wikitable"style="text-align:center;margin:auto;
align="center" colspan="7" style="background:#{{rail color|Chennai Metro|Green}};"| Green Line
rowspan="2"|S.No

! colspan="2"|Station name{{cite web |title=Project status of Chennai Metro |url=https://chennaimetrorail.org/project-status/ |url-status=live |archive-url=https://web.archive.org/web/20160926171710/http://chennaimetrorail.org/project-status/ |archive-date=26 September 2016 |access-date=16 August 2010 |publisher=Chennai Metro Rail Limited}}{{cite web |title=Chennai Metro, line map |url=https://chennaimetrorail.org/wp-content/uploads/2022/05/Line-Map.pdf |url-status=live |archive-url=https://web.archive.org/web/20231208073455/https://chennaimetrorail.org/wp-content/uploads/2022/05/Line-Map.pdf |archive-date=8 December 2023 |access-date=1 December 2023 |publisher=Chennai Metro Rail Limited}}

! rowspan="2" |Opened

! rowspan="2" |Connections

! rowspan="2"|Station layout

! rowspan="2"|Platform Level Type

English

! Tamil

1

|Central

|சென்ட்ரல்

|25 May 2018

|{{RouteBox|Blue Line|Blue Line (Chennai Metro)|#{{rail color|Chennai Metro|Blue}}|white}}
{{rint|rail}} Chennai Central
{{rint|rail}} South Line, Chennai Suburban (Park)
{{rint|rail}} West Line, Chennai Suburban (Moore Market)
{{rint|rail}} Chennai MRTS (Park Town)

|Underground

|Island

2

|{{stl|Chennai Metro|Egmore}}

|எழும்பூர்

|25 May 2018

|{{rint|rail}} Chennai Egmore

|Underground

|Island

3

|{{stl|Chennai Metro|Nehru Park}}

|நேரு பூங்கா

|15 May 2017

|

|Underground

|Island

4

|{{stl|Chennai Metro|Kilpauk}}

|கீழ்ப்பாக்கம்

|15 May 2017

|{{RouteBox|Purple Line|Line 3 (Chennai Metro)|#800080|white}} (Under Construction)

|Underground

|Island

5

|{{stl|Chennai Metro|Pachaiyappa's College}}

|பச்சையப்பன் கல்லூரி

|15 May 2017

|

|Underground

|Island

6

|{{stl|Chennai Metro|Shenoy Nagar}}

|செனாய் நகர்

|15 May 2017

|

|Underground

|Island

7

|{{stl|Chennai Metro|Anna Nagar East}}

|அண்ணா நகர் கிழக்கு

|15 May 2017

|

|Underground

|Island

8

|{{stl|Chennai Metro|Anna Nagar Tower}}

|அண்ணா நகர் கோபுரம்

|15 May 2017

|

|Underground

|Island

9

|{{stl|Chennai Metro|Thirumangalam}}

|திருமங்கலம்

|15 May 2017

|{{RouteBox|Red Line|Line 5 (Chennai Metro)|#ff0000|white}} (Under Construction)

|Underground

|Island

10

|{{stl|Chennai Metro|Koyambedu}}

|கோயம்பேடு

|29 June 2015

|{{RouteBox|Red Line|Line 5 (Chennai Metro)|#ff0000|white}} (Under Construction)

|Elevated

|Side

11

|{{stl|Chennai Metro|Koyambedu Depot}}

|கோயம்பேடு பணிமனை

|29 June 2015

|

|Elevated

|Side

12

|CMBT

|சென்னை புறநகர் பேருந்து நிலையம்

|29 June 2015

|{{rint|bus}} Chennai Mofussil Bus Terminus

|Elevated

|Side

13

|{{stl|Chennai Metro|Arumbakkam}}

|அரும்பாக்கம்

|29 June 2015

|

|Elevated

|Side

14

|{{stl|Chennai Metro|Vadapalani}}

|வடபழனி

|29 June 2015

|{{RouteBox|Orange Line|Line 4 (Chennai Metro)|#ff6600|white}} (Under Construction)

|Elevated

|Side

15

|{{stl|Chennai Metro|Ashok Nagar}}

|அசோக் நகர்

|29 June 2015

|

|Elevated

|Side

16

|{{stl|Chennai Metro|Ekkattuthangal}}

|ஈக்காட்டுத்தாங்கல்

|29 June 2015

|

|Elevated

|Side

17

|Alandur

|ஆலந்தூர்

|29 June 2015

|{{RouteBox|Blue Line|Blue Line (Chennai Metro)|#{{rail color|Chennai Metro|Blue}}|white}}
{{RouteBox|Red Line|Line 5 (Chennai Metro)|#ff0000|white}} (Under Construction)

|Elevated

|Side

18

|St. Thomas Mount

|பரங்கிமலை

|14 October 2016

|{{RouteBox|Red Line|Line 5 (Chennai Metro)|#ff0000|white}} (Under Construction)
{{rint|rail}} South Line, Chennai Suburban (St. Thomas Mount)
{{rint|rail}} Chennai MRTS (St. Thomas Mount){{ref label|§|§|§}}

|Elevated

|Side

{{note label|§|§|§}} under construction

Operations

{{As of|2022}}, the metro operates trains from 5 AM to 11 PM with an average frequency of one train every 5 minutes in peak hours and every 8 minutes in lean hours in the green line.{{cite news|title=Single train trip to equal 160 buses, 3000 cars and 6000 bikes|newspaper=The Hindu|date=29 August 2012|url=http://www.thehindu.com/news/cities/chennai/article3832896.ece|archive-url=https://web.archive.org/web/20120830014100/http://www.thehindu.com/news/cities/chennai/article3832896.ece|archive-date=2012-08-30|access-date=1 December 2023}}{{cite report|title=Timings of Chennai Metro Rail As of January 2022|url=https://chennaimetrorail.org/wp-content/uploads/2022/01/first-and-last-train-timings_terminal_NP10_P5_2300_WK2-NP10_SUN_2200-NP10_2300_FEST.pdf|url-status=live|archive-url=https://web.archive.org/web/20220125040226/https://chennaimetrorail.org/wp-content/uploads/2022/01/first-and-last-train-timings_terminal_NP10_P5_2300_WK2-NP10_SUN_2200-NP10_2300_FEST.pdf|archive-date=25 January 2022|website=Chennai Metro Rail}} The main operational control center (OCC) is located in Koyambedu where the movement of trains and real-time CCTV footage obtained is monitored.{{cite news|last=Karthikeyan|first=K.|date=26 July 2014|title=High tech control room for Chennai metro|newspaper=Deccan Chronicle|url=https://www.deccanchronicle.com/140726/nation-current-affairs/article/high-tech-control-room-chennai-metro|access-date=4 October 2014|archive-date=4 October 2014|archive-url=https://web.archive.org/web/20141004225518/http://www.deccanchronicle.com/140726/nation-current-affairs/article/high-tech-control-room-chennai-metro|url-status=live}} Chennai Metro maintains a major depot at Koyambedu covering an area of {{cvt|26|ha|abbr=on}} which houses maintenance workshops, stabling lines, test tracks and a washing plant for the trains.{{cite news|last=Sekar|first=Sunitha|date=5 September 2017|title=CMRL takes the fight to birds|newspaper=The Hindu|url=http://www.thehindu.com/news/cities/chennai/cmrl-takes-the-fight-to-birds/article19621926.ece|access-date=30 September 2017|archive-date=6 September 2017|archive-url=https://web.archive.org/web/20170906213230/http://www.thehindu.com/news/cities/chennai/cmrl-takes-the-fight-to-birds/article19621926.ece|url-status=live}}{{cite news|last=Sekar|first=Sunitha|date=16 July 2014|title=Chennai Metro to get a second depot|newspaper=The Hindu|url=http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/chennai-metro-to-get-a-second-depot/article6215042.ece|access-date=4 October 2014|archive-date=15 February 2016|archive-url=https://web.archive.org/web/20160215081044/http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/chennai-metro-to-get-a-second-depot/article6215042.ece|url-status=live}} The minimum fare is {{INR}}10 and the maximum fare is {{INR}}50.{{cite news|url=https://www.thehindu.com/news/cities/chennai/now-ride-from-washermanpet-to-airport-takes-just-40-minutes/article26232236.ece|title=Chennai Metro: Now, ride from Washermanpet to airport takes just 40 minutes|last=Sekar|first=Sunitha|date=11 February 2019|newspaper=The Hindu|access-date=11 February 2019|archive-date=27 March 2019|archive-url=https://web.archive.org/web/20190327112038/https://www.thehindu.com/news/cities/chennai/now-ride-from-washermanpet-to-airport-takes-just-40-minutes/article26232236.ece|url-status=live}}{{cite report|url=https://chennaimetrorail.org/wp-content/uploads/2021/02/Fare-chart-for-all-stns.pdf|title=Chennai Metro fare table|publisher=Chennai Metro|access-date=6 November 2023|archive-date=16 December 2023|archive-url=https://web.archive.org/web/20231216132211/https://chennaimetrorail.org/wp-content/uploads/2021/02/Fare-chart-for-all-stns.pdf|url-status=live}} There are six types of tickets issued by CMRL for travel in Chennai Metro.{{cite web|url=http://tickets.chennaimetrorail.org/WEB/F03?2|title=Tickets issued by CMRL|publisher=Chennai Metro|access-date=6 November 2019|archive-date=6 September 2019|archive-url=https://web.archive.org/web/20190906163936/http://tickets.chennaimetrorail.org/WEB/F03?2|url-status=live}}

See also

References

{{reflist}}

{{Chennai Metro|green line=yes}}

{{Transport in Chennai}}

{{Portal bar|India|Transport|Engineering}}

{{DEFAULTSORT:Chennai Metro - Line 1}}

Category:Chennai Metro lines

Category:Railway lines opened in 2015

Category:2015 establishments in Tamil Nadu