Jōshin-etsu Expressway
{{short description|National expressway in Japan}}
{{More citations needed|date=April 2013}}
{{Infobox road
| country = JPN
| type = Expressway
| route = Jōshin-etsu
| alternate_name = Image:JP Expressway E18.svg 上信越自動車道
| map = {{Highway system OSM map
| highway_system_qid = Q5228578
| frame-lat = 36.6
| frame-long = 138.6
| frame-width = 300
| frame-height = 300
| zoom = 8
| length =
| plain = yes
}}
| map_custom = yes
| length_km = 204.9
| established = 1980{{cite web|url=http://www2.tokai.or.jp/stt/road/expwyopn.html|title=Expressway Opening Dates|access-date=16 April 2008}}
| terminus_a = {{Jct|country=JPN|Exp|E17}}
Fujioka Junction in Fujioka, Gunma
({{coord|36.2732|139.0902|display=inline}})
| cities = Tomioka, Annaka, Saku, Komoro, Ueda, Chikuma, Nagano, Nakano, Myōkō
| terminus_b = {{Jct|country=JPN|Exp|E8}}
Jōetsu Junction in Jōetsu, Niigata
({{coord|37.1371|138.2139|display=inline}})
}}
The {{nihongo|Jōshin-etsu Expressway|上信越自動車道|Jōshin-etsu Jidōsha-dō}} is a national expressway in Japan. It is owned and operated by East Nippon Expressway Company.
Naming
{{nihongo|Jōshin-etsu|上信越}} is a kanji acronym consisting of 3 characters, each representing the former names of the prefectures that the route traverses. {{nihongo|Kōzuke Province|上野国}} consists of present-day Gunma Prefecture, {{nihongo|Shinano Province|信濃国}} consists of present-day Nagano Prefecture, and {{nihongo|Echigo Province|越後国}} consists of present-day Niigata Prefecture.
Officially, the expressway is referred to as the Kan-Etsu Expressway Jōetsu Route. This designation consists of the entire Jōshin-etsu Expressway as well as the Kan-Etsu Expressway beyond Fujioka Junction to Nerima Interchange (concurrent with the Kan-Etsu Expressway Niigata Route).{{cite web|url=http://www.mlit.go.jp/road/ir/ir-yosan/h20/s07.pdf|title=High Standard Trunk Road Map |author=Ministry of Land, Infrastructure and Transport |access-date=2008-04-13 |url-status=dead|archive-url=https://web.archive.org/web/20110920095900/http://www.mlit.go.jp/road/ir/ir-yosan/h20/s07.pdf|archive-date=20 September 2011}}
Route description
File:Ueda-Roman Bridge 1.jpg]]
The expressway begins at a junction with the Kan-Etsu Expressway in southern Gunma Prefecture and heads west, paralleling National Route 254 until Shimonita. From here the route branches north, passing Mount Myōgi, then heads west once more from Annaka. The route parallels National Route 18 from this point until the terminus. The expressway then follows a winding route through the mountainous area separating Gunma and Nagano Prefectures. From Saku, Nagano the route follows a northwesterly course, passing Mount Asama, until it reaches a junction with the Nagano Expressway near the city of Nagano. The route then heads north, following the east bank of the Chikuma River, before heading into the mountainous region separating Nagano and Niigata Prefectures. The expressway continues north through Niigata Prefecture, passing Mount Myōkō, and eventually terminating at a junction with the Hokuriku Expressway in Jōetsu near the Japan Sea coastline.
The expressway is 6 lanes from Fujioka Junction to Fujioka Interchange. The remaining section from Fujioka Interchange to Jōetsu Junction is 4 lanes, from 5 December 2019 according to E-NEXCO.{{cite web|url= http://www.e-nexco.co.jp/open_schedule/kanto/|title= E-NEXCO Opening Schedule|access-date= 15 April 2008|archive-date= 16 October 2007|archive-url= https://web.archive.org/web/20071016044901/http://www.e-nexco.co.jp/open_schedule/kanto/|url-status= dead}}
History
The first section was completed in 1980 and the entire route was completed in 1999.{{cite web|url=http://www.dokokyo.or.jp/data/nenpyo/1999.htm|title=Construction History of Japan, 1999|author= Japan Civil Engineering Contractors Association|access-date=16 April 2008|archive-url=https://web.archive.org/web/20070216224914/http://dokokyo.or.jp/data/nenpyo/1999.htm|archive-date=16 February 2007|url-status=dead}} On the night of 16 December 2020, about 300 vehicles were trapped on the expressway after a truck blocked it off due to it becoming stuck in the snow. In response, the company that manages the route supplied drivers who were stuck on the road until the next morning.{{cite news|author=Kyodo|title=Thousand vehicles stranded, 10,000 without electricity after heavy snowfall|url=https://www.japantimes.co.jp/news/2020/12/17/national/vehicles-stranded-japan-snowfall/|newspaper=The Japan Times|date=17 December 2020|access-date=18 December 2020}}
List of interchanges and features
{{RJL|date=November 2021}}
- IC - interchange, SIC - smart interchange, JCT - junction, SA - service area, PA - parking area, BS - bus stop, CB - snow chains, TN - tunnel, BR - bridge
class="wikitable" |
style="border-bottom: 3px solid green;"|No.
!style="border-bottom: 3px solid green;"|Name !style="border-bottom: 3px solid green;"|Connections !style="border-bottom: 3px solid green;"|Dist. from !style="border-bottom: 3px solid green;"|Dist. from !style="border-bottom: 3px solid green;"|Bus Stop !style="border-bottom: 3px solid green;"|Notes !style="border-bottom: 3px solid green;"|Speed Limit !style="border-bottom: 3px solid green;" colspan="2"|Location |
---|
style="background-color: #BFB;"|(9)
|{{Jct|country=JPN|Exp|E17}} |style="text-align: center;"|0.0 |style="text-align: center;"|204.9 |style="text-align: center;"| | |rowspan="2"|80 km/h |rowspan="3"|Fujioka |rowspan="19" style="width:1em;"|Gunma |
rowspan="2" style="background-color: #BFB;"|1/PA
|rowspan="2" |Fujioka IC/PA |rowspan="2" |Pref. Route 13 (Maebashi Nagatoro Route) |rowspan="2" style="text-align: center;"|1.8 |rowspan="2" style="text-align: center;"|203.1 |rowspan="2" | |rowspan="2" |Parking Area/Highway Oasis only accessible to Fujioka JCT-bound traffic |
rowspan="6"|100 km/h |
style="background-color: #BFB;"|2
|Pref. Route 41 (Kanda Yoshii Teishajō Route) |style="text-align: center;"|11.2 |style="text-align: center;"|193.7 |style="text-align: center;"| | |
style="background-color: #BFB;"|PA
| |style="text-align: center;"|15.4 |style="text-align: center;"|189.5 |style="text-align: center;"| | |
style="background-color: #BFB;"|3
| |style="text-align: center;"|20.1 |style="text-align: center;"|184.8 |style="text-align: center;"|○ | |
style="background-color: #BFB;"|4
|{{Jct|country=JPN|Route|254}} |style="text-align: center;"|26.8 |style="text-align: center;"|178.1 |style="text-align: center;"|○ | |
rowspan="2" style="background-color: #BFB;"|5
|rowspan="2" |Matsuida-Myōgi IC |rowspan="2" |Pref. Route 51 (Matsuida Shimonita Route) |rowspan="2" style="text-align: center;"|37.5 |rowspan="2" style="text-align: center;"|167.4 |rowspan="2" style="text-align: center;"|○ |rowspan="2" | |rowspan="8"|Annaka |
rowspan="30"|80 km/h |
style="background-color: #BFB;"|SA
| |style="text-align: center;"|42.1 |style="text-align: center;"|162.8 |style="text-align: center;"| | |
style="background-color: #BFB;"|BR
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| | |
style="background-color: #BFB;"|TN
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| |Fujioka-bound 1,019m |
style="background-color: #BFB;"|6
|Pref. Route 92 (Matsuida Karuizawa Route) |style="text-align: center;"|52.5 |style="text-align: center;"|152.4 |style="text-align: center;"|○ | |
style="background-color: #BFB;"|CB
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| | |
rowspan="2" style="background-color: #BFB; text-align: center;"|TN
|rowspan="2" |Ōyama Tunnel |rowspan="2" | |rowspan="2" style="text-align: center;"|↓ |rowspan="2" style="text-align: center;"|↑ |rowspan="2" style="text-align: center;"| |rowspan="2" |Fujioka-bound 1,722m |
rowspan="4"|Shimonita |
style="background-color: #BFB;"|TN
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| |Fujioka-bound 2,314m |
style="background-color: #BFB;"|TN
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| |Fujioka-bound 373m |
rowspan="2" style="background-color: #BFB; text-align: center;"|TN
|rowspan="2" |Happūzan Tunnel |rowspan="2" | |rowspan="2" style="text-align: center;"|↓ |rowspan="2" style="text-align: center;"|↑ |rowspan="2" style="text-align: center;"| |rowspan="2" |Fujioka-bound 3,998m |
rowspan="5"|Saku
|rowspan="46" style="width:1em;"|Nagano |
style="background-color: #BFB;"|CB
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| | |
style="background-color: #BFB;"|TN
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| |Fujioka-bound 1,703m |
style="background-color: #BFB;"|6-1/PA
| |style="text-align: center;"|68.4 |style="text-align: center;"|136.5 |style="text-align: center;"| |Highway Oasis |
style="background-color: #BFB;"|7
|Pref. Route 9 (Saku Karuizawa Route) |style="text-align: center;"|71.3 |style="text-align: center;"|133.6 |style="text-align: center;"|○ | |
style="background-color: #BFB;"|7-1
|{{Jct|country=JPN|Exp|E52|dab1=CO}} | style="text-align: center;"|72.8 | style="text-align: center;"|132.1 |style="text-align: center;"| | |rowspan="3"|Komoro |
style="background-color: #BFB;"|BS
| |style="text-align: center;"|78.0 |style="text-align: center;"|126.9 |style="text-align: center;"|○ | |
style="background-color: #BFB;"|8
|Pref. Route 79 (Komoro Ueda Route) |style="text-align: center;"|82.1 |style="text-align: center;"|122.8 |style="text-align: center;"| | |
style="background-color: #BFB;"|9/SA
|Pref. Route 81 (Maruko Tōbu Inter Route) |style="text-align: center;"|88.6 |style="text-align: center;"|116.3 |style="text-align: center;"|○ | |Tōmi |
style="background-color: #BFB;"|10
|{{Jct|country=JPN|Route|144}} |style="text-align: center;"|96.9 |style="text-align: center;"|108.0 |style="text-align: center;"|○ | |rowspan="2"|Ueda |
rowspan="2" style="background-color: #BFB; text-align: center;"|TN
|rowspan="2" |Tarōyama Tunnel |rowspan="2" | |rowspan="2" style="text-align: center;"|↓ |rowspan="2" style="text-align: center;"|↑ |rowspan="2" style="text-align: center;"| |rowspan="2" |Fujioka-bound 4,264m |
rowspan="4"|Sakaki |
style="background-color: #BFB;"|11
|Pref. Route 91 (Sakaki Inter Route) |style="text-align: center;"|104.8 |style="text-align: center;"|100.1 |style="text-align: center;"| | |
style="background-color: #BFB;"|PA
| |style="text-align: center;"|106.2 |style="text-align: center;"|98.7 |style="text-align: center;"|○ | |
rowspan="2" style="background-color: #BFB; text-align: center;"|TN
|rowspan="2" |Gorigamine Tunnel |rowspan="2" | |rowspan="2" style="text-align: center;"|↓ |rowspan="2" style="text-align: center;"|↑ |rowspan="2" style="text-align: center;"| |rowspan="2" |Fujioka-bound 4,518m |
rowspan="6"|Chikuma |
style="background-color: #BFB;"|TN
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| |Fujioka-bound 1,421m |
style="background-color: #BFB;"|BS
| |style="text-align: center;"|117.1 |style="text-align: center;"|87.8 |style="text-align: center;"|○ | |
rowspan="2" style="background-color: #BFB;"|12
|rowspan="2" |Kōshoku JCT |rowspan="2" |{{Jct|country=JPN|Exp|E19|dab1=N}} |rowspan="2" style="text-align: center;"|119.1 |rowspan="2" style="text-align: center;"|85.8 |rowspan="2" style="text-align: center;"| |rowspan="2" | |
rowspan="12"|100 km/h |
rowspan="2" style="background-color: #BFB; text-align: center;"|TN
|rowspan="2" |Yakushiyama Tunnel |rowspan="2" | |rowspan="2" style="text-align: center;"|↓ |rowspan="2" style="text-align: center;"|↑ |rowspan="2" style="text-align: center;"| |rowspan="2" |Fujioka-bound 1,212m |
rowspan="5"|Nagano |
style="background-color: #BFB;"|PA
| |style="text-align: center;"|123.2 |style="text-align: center;"|81.7 |style="text-align: center;"| | |
style="background-color: #BFB;"|13
|Pref. Route 35 (Nagano Sanada Route) |style="text-align: center;"|125.1 |style="text-align: center;"|79.8 |style="text-align: center;"|○ | |
style="background-color: #BFB;"|BS
| |style="text-align: center;"|130.2 |style="text-align: center;"|74.7 |style="text-align: center;"|○ | |
rowspan="2" style="background-color: #BFB; text-align: center;"|14
|rowspan="2" |Suzaka-Naganohigashi IC |rowspan="2" |{{Jct|country=JPN|Route|403}} |rowspan="2" style="text-align: center;"|135.0 |rowspan="2" style="text-align: center;"|69.9 |rowspan="2" style="text-align: center;"| |rowspan="2" | |
rowspan="2"|Suzaka |
style="background-color: #BFB;"|BS
| |style="text-align: center;"|137.5 |style="text-align: center;"|67.4 |style="text-align: center;"|○ | |
style="background-color: #BFB;"|14-1/PA
|Pref. Route 343 (Murayama Obuse Teishajō Route) |style="text-align: center;"|141.6 |style="text-align: center;"|63.3 |style="text-align: center;"| |Highway Oasis |rowspan="2"|Obuse |
style="background-color: #BFB;"|BS
| |style="text-align: center;"|143.2 |style="text-align: center;"|61.7 |style="text-align: center;"|○ | |
rowspan="2" style="background-color: #BFB;"|15
|rowspan="2" |Shinshū-Nakano IC |rowspan="2" |Pref. Route 29 (Nakano Toyono Route) |rowspan="2" style="text-align: center;"|146.5 |rowspan="2" style="text-align: center;"|58.4 |rowspan="2" style="text-align: center;"| |rowspan="2" | |rowspan="9"|Nakano |
rowspan="5"|80 km/h |
style="background-color: #BFB;"|BS
| |style="text-align: center;"|147.2 |style="text-align: center;"|57.7 |style="text-align: center;"|○ | |
style="background-color: #BFB;"|BR
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| |Length - 370m |
style="background-color: #BFB;"|CB
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| | |
rowspan="2" style="background-color: #BFB;"|16
|rowspan="2" |Toyota-Iiyama IC |rowspan="2" |{{Jct|country=JPN|Route|117}} |rowspan="2" style="text-align: center;"|154.2 |rowspan="2" style="text-align: center;"|50.7 |rowspan="2" style="text-align: center;"| |rowspan="2" | |
rowspan="20"|70 km/h |
style="background-color: #BFB;"|BS
| |style="text-align: center;"|155.0 |style="text-align: center;"|49.9 |style="text-align: center;"|○ | |
style="background-color: #BFB;"|TN
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| | |
style="background-color: #BFB;"|TN
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| |Fujioka-bound 1,415m |rowspan="2"|Iizuna |
rowspan="2" style="background-color: #BFB; text-align: center;"|TN
|rowspan="2" |Yakushidake Tunnel |rowspan="2" | |rowspan="2" style="text-align: center;"|↓ |rowspan="2" style="text-align: center;"|↑ |rowspan="2" style="text-align: center;"| |rowspan="2" |Fujioka-bound 2,320m |
rowspan="5"|Shinano |
style="background-color: #BFB;"|PA
| |style="text-align: center;"|164.3 |style="text-align: center;"|40.6 |style="text-align: center;"| | |
style="background-color: #BFB;"|BS
| |style="text-align: center;"|166.2 |style="text-align: center;"|38.7 |style="text-align: center;"|○ | |
style="background-color: #BFB;"|17
|{{Jct|country=JPN|Route|18|name1=Nojiri Bypass}} |style="text-align: center;"|167.4 |style="text-align: center;"|37.5 |style="text-align: center;"| | |
rowspan="2" style="background-color: #BFB; text-align: center;"|BR
|rowspan="2" |Reimei Bridge |rowspan="2" | |rowspan="2" style="text-align: center;"|↓ |rowspan="2" style="text-align: center;"|↑ |rowspan="2" style="text-align: center;"| |rowspan="2" |Length - 370m |
rowspan="4"|Myōkō
|rowspan="10" style="width:1em;"|Niigata |
style="background-color: #BFB;"|18
|{{Jct|country=JPN|Route|18|name1=Myōkō Nojiri Bypass}} |style="text-align: center;"|172.5 |style="text-align: center;"|32.4 |style="text-align: center;"| | |
style="background-color: #BFB;"|BS
|style="background-color: #CCC;"|Myōkōkōgen BS |style="background-color: #CCC;"| |style="background-color: #CCC; text-align: center;"|↓ |style="background-color: #CCC; text-align: center;"|↑ |style="background-color: #CCC; text-align: center;"|X |style="background-color: #CCC;"|Bus Stop closed |
style="background-color: #BFB;"|SA
| |style="text-align: center;"|179.9 |style="text-align: center;"|25.0 |style="text-align: center;"|X |Bus Stop closed |
style="background-color: #BFB;"|19
|{{Jct|country=JPN|Route|18|name1=Jōshin Bypass}} |style="text-align: center;"|184.5 |style="text-align: center;"|20.4 |style="text-align: center;"| | |rowspan="2"|Jōetsu |
style="background-color: #BFB;"|BS
|style="background-color: #CCC;"|Nakagō-kita BS |style="background-color: #CCC;"| |style="background-color: #CCC; text-align: center;"|↓ |style="background-color: #CCC; text-align: center;"|↑ |style="background-color: #CCC; text-align: center;"|X |style="background-color: #CCC;"|Bus Stop closed |
style="background-color: #BFB;"|19-1/PA
|Pref. Route 428 (Nishinoyashinden Arai Route) |style="text-align: center;"|191.9 |style="text-align: center;"|13.0 |style="text-align: center;"|X |Highway Oasis |rowspan="2"|Myōkō |
style="background-color: #BFB;"|TN
| |style="text-align: center;"|↓ |style="text-align: center;"|↑ |style="text-align: center;"| |Length - 1,502m |
style="background-color: #BFB;"|20
|Pref. Route 85 (Jōetsu-Takada Inter Route) |style="text-align: center;"|199.0 |style="text-align: center;"|5.9 |style="text-align: center;"| | |rowspan="2"|Jōetsu |
style="background-color: #BFB;"|(31-1)
|{{Jct|country=JPN|Exp|E8}} |style="text-align: center;"|204.9 |style="text-align: center;"|0.0 |style="text-align: center;"| | |
There are also 2 snow chain changing areas between Toyota-Iiyama Interchange and Kurohime-Nojiriko Parking Area, and 1 area between Sakaki Interchange and Ueda-Sugadaira Interchange (Fujioka-bound only).
References
External links
{{commons category|Joshin-Etsu Expressway}}
- {{in lang|ja}} [http://www.e-nexco.co.jp/ East Nippon Expressway Company]
- {{in lang|ja}} [http://www.jaf.or.jp/dguide/tm/kanto/html5.html#page=2 JAF Drive Map]
{{East Nippon Expressway Company}}
{{Expressways of Japan}}
{{DEFAULTSORT:Joshin-etsu}}
Category:Roads in Gunma Prefecture
Category:Roads in Nagano Prefecture