Jatigede Dam

{{Infobox dam

| name = Jatigede Dam

| name_official = Bendungan Jatigede

| image = Jatigede Dam NFFU.jpg

| image_size =

| image_caption = Rendition of the future dam, downstream side on the left

| image_alt =

| location_map = Indonesia

| location_map_size =

| location_map_caption =

| coordinates = {{coord|6|51|23|S|108|05|41|E|type:landmark|display=inline,title}}

| country = Indonesia

| location = Sumedang, West Java

| status = O

| construction_began = 2008

| opening = 2015

| demolished =

| cost =

| owner =

| dam_type = Embankment, rock-fill

| dam_height = {{Convert|110|m|ft|0|abbr=on}}

| dam_height_thalweg =

| dam_height_foundation=

| dam_length = {{Convert|1715|m|ft|0|abbr=on}}

| dam_width_crest = {{Convert|110|m|ft|0|abbr=on}}

| dam_width_base =

| dam_volume = {{Convert|6700000|m3|cuyd|0|abbr=on}}

| dam_elevation_crest = {{Convert|265|m|ft|0|abbr=on}}

| dam_crosses = Cimanuk River

| spillway_count =

| spillway_type = Chute

| spillway_capacity = {{Convert|4468|m3/s|ft3/s|0|abbr=on}}

| res_name =

| res_capacity_total = {{Convert|980000000|m3|acre.ft|0|abbr=on}}

| res_capacity_active = {{Convert|877000000|m3|acre.ft|0|abbr=on}}

| res_capacity_inactive=

| res_catchment = {{Convert|1462|km2|mi2|0|abbr=on}}

| res_surface = {{Convert|41.22|km2|mi2|0|abbr=on}}

| res_elevation = {{Convert|260|m|ft|0|abbr=on}}

| res_max_depth =

| res_max_length =

| res_max_width =

| plant_hydraulic_head = {{Convert|170|m|ft|0|abbr=on}} (design)

| res_tidal_range =

| plant_operator = Perusahaan Listrik Negara

| plant_commission = 2019 (est.)

| plant_decommission =

| plant_type =

| plant_turbines = 2 x 55 MW Francis-type

| plant_capacity = 110 MW{{cite web|last=Rahmawati|first=Debby|title=Jatigede Dam|url=http://downloads.ziddu.com/downloadfile/15274775/EKSKURSIWADUKJATIGEDE1.docx.html|publisher=Department of Civil Engineering University Gunadarma|accessdate=20 January 2012|language=Indonesian|year=2011}}

| plant_annual_gen =

| website =

| extra =

}}

The Jatigede Dam is an embankment dam on the Cimanuk River in Sumedang Regency, West Java, Indonesia. It is located {{Convert|19|km|mi|0|abbr=on}} east of the town of Sumedang. Construction on the dam began in 2008 and it was completed in 2015.{{cite web|title=PLTA Jatigede will Finish by 2014|url=http://www.esdm.go.id/index-en/83-energy/5306-plta-jatigede-will-finish-by-2014.html|publisher=Department of Energy, Indonesia|accessdate=20 January 2012|language=Indonesian|archive-date=21 December 2014|archive-url=https://web.archive.org/web/20141221051509/http://www.esdm.go.id/index-en/83-energy/5306-plta-jatigede-will-finish-by-2014.html|url-status=dead}} The power station is expected to be commissioned in 2019. The primary purpose of the dam is irrigation but it will also provide for flood control, water supply and hydroelectric power generation. Water in the reservoir will be used to help irrigate {{Convert|90000|ha|acre|0|abbr=on}} of farmland and the power station is expected to have a 110 MW capacity. The project was controversial, primarily due to the relocation of people in the reservoir zone.Arya Dipa, '[http://www.thejakartapost.com/news/2015/01/24/jokowi-s-social-impact-policy-jatigede-dam-rejected.html Jokowi's social impact policy on Jatigede dam rejected'], The Jakarta Post, 24 January 2015.

thumb

Background

The dam was first proposed in 1963 after a study of the Cimanuk was carried out by Coyne et Bellier. Further planning and designs commenced thereafter. An environmental impact assessment was completed in 1986 and land acquisition study in 2003.{{cite web|title=Jatigede dam campaign gains momentum|url=http://www.downtoearth-indonesia.org/story/jatigede-dam-campaign-gains-momentum|publisher=Down to Earth|accessdate=20 January 2012|date=May 2004}} After decades of planning and protests, the Indonesian Government announced firm plans to proceed with the dam in 2004.{{cite web|title=INDONESIA: Government to go ahead with Jatigede dam project|url=http://www.waterconserve.org/shared/reader/welcome.aspx?linkid=34154&keybold=water%20AND%20%20forum%20AND%20%20protest|publisher=Jakarta Post (via Water Conserve)|accessdate=20 January 2012|date=9 August 2004}}{{Dead link|date=October 2024 |bot=InternetArchiveBot |fix-attempted=yes }}

The project has been surrounded with controversy over the years, particularly as its reservoir would flood {{Convert|4896|ha|acre|0|abbr=on}} of land. This includes five districts and 30 villages which include approximately 70,000 people to be relocated.{{cite web|title=Construction of Jatigede Dam|url=http://www.sumedangkab.go.id/index.php?option=com_content&view=article&id=104&Itemid=60|publisher=Government of Sumedang District|accessdate=20 January 2012|language=Indonesian|archive-date=24 September 2015|archive-url=https://web.archive.org/web/20150924111537/http://www.sumedangkab.go.id/index.php?option=com_content&view=article&id=104&Itemid=60|url-status=dead}} Affected residents claim that compensation for their land is too low and that the government intimidated them to accept offers in the 1980s.{{cite web|title=Residents lose court battle over Jatigede dam project |url=http://www.thejakartapost.com/news/2007/07/26/residents-lose-court-battle-over-jatigede-dam-project.html-0 |publisher=The Jakarta Post |accessdate=20 January 2012 |date=26 July 2007 |url-status=dead |archiveurl=https://web.archive.org/web/20101127054535/http://www.thejakartapost.com/news/2007/07/26/residents-lose-court-battle-over-jatigede-dam-project.html-0 |archivedate=27 November 2010 }} In addition, a 2011 study by Indonesia's Ministry of Public Works estimated that the reservoir would become ineffective in 50 years due to high sedimentation of the river. As a result, conservation activities in the watershed area of Cimanuk River would be undertaken by Ministry of Public Works, Ministry of Forestry, West Java Provincial Government and the relevant regency governments. Furthermore a cekdam (levee to prevent river from widening) in upper area of the Reservoir upper area of the Reservoir will be made. Thus, sedimentation can be lifted and will extend the life of the reservoir.{{cite web|title=High Sedimentation Threatens Jatigede Reservoir |url=http://www.indii.co.id/news_daily_detail.php?id=1225 |archive-url=https://archive.today/20120802023324/http://www.indii.co.id/news_daily_detail.php?id=1225 |url-status=dead |archive-date=2 August 2012 |publisher=Investor Daily (via Indonesia Infrastructure Initiative) |accessdate=20 January 2012 |date=5 August 2011 }}

Despite the controversy, the government stated in 2004 that an agreement had been reached. The contract to build the dam and power plant was awarded to China's Sinohydro Corporation in May 2007.{{cite web|title=Chinese firm signed to build Indonesia's 110-MW Jatigede|url=http://www.hydroworld.com/index/display/article-display/articles/hrhrw/News/Chinese_firm_signed_to_build_Indonesias_110-MW_Jatigede.html|publisher=Hydro World|accessdate=20 January 2012|date=25 May 2007}} Construction on the dam's diversion tunnel began in October 2008 and was completed in August 2011.{{cite web|title=Jatigede Dam Tunnel Complete |url=http://www.bumn.go.id/waskita/publikasi/terowongan-di-bendungan-jatigede-selesai/ |archive-url=https://archive.today/20120722050721/http://www.bumn.go.id/waskita/publikasi/terowongan-di-bendungan-jatigede-selesai/ |url-status=dead |archive-date=22 July 2012 |publisher=TV One |accessdate=20 January 2012 |date=4 August 2011 }} The government announced in late 2011 that that dam was 60% complete.{{cite web|title=Jatigede Dam Construction 60 Percent Completed |url=http://emu.co.id/news_daily_detail.php?id=1767 |publisher=Indonesia Infrastructure Initiative |accessdate=20 January 2012 |date=4 October 2011 |url-status=dead |archiveurl=https://web.archive.org/web/20141221161818/http://emu.co.id/news_daily_detail.php?id=1767 |archivedate=21 December 2014 }} In July 2011, it was announced that Perusahaan Listrik Negara would oversee the construction and operation of the 110 MW power plant.{{cite web|title=Next Year, PLN will be Ready to Develop PLTA Jatigede and Merangin|url=http://www.esdm.go.id/news-archives/electricity/46-electricity/4699-next-year-pln-will-be-ready-to-develop-plta-jatigede-and-merangin.html|publisher=Department of Energy, Indonesia|accessdate=20 January 2012|language=Indonesian|date=4 July 2011|archive-url=https://web.archive.org/web/20110901073544/http://esdm.go.id/news-archives/electricity/46-electricity/4699-next-year-pln-will-be-ready-to-develop-plta-jatigede-and-merangin.html|archive-date=1 September 2011|url-status=dead}} The dam and power plant is expected to cost US$224 million.{{cite web|title=PLN ready to build Jatigede hydro power plant|url=http://cempaka-sam.blogspot.com/2011/12/pln-ready-to-build-jatigede-hydro-power.html|publisher=Antara News|accessdate=20 January 2012|date=15 December 2011}} In May 2013 the government announced that the total cost would be around $400 million and that the dam was 70% complete.Nurfika Osman, 'Jatigede Dam to be operational by 2014', The Jakarta Post, 18 May 2013. Currently, the dam was expected to start impounding its reservoir in early 2015. This major step in construction has been repeatedly delayed due to resident relocations.{{cite web|title=Jatigede Dam Pushed Back to 2014 |url=http://www.theindonesiatoday.com/Resources/Energy/Jatigede-Dam-Pushed-Back-to-2014/News |publisher=The Indonesia Today |accessdate=20 January 2012 |date=4 July 2011 |url-status=dead |archiveurl=https://web.archive.org/web/20141221161833/http://www.theindonesiatoday.com/Resources/Energy/Jatigede-Dam-Pushed-Back-to-2014/News |archivedate=21 December 2014 }}{{cite web|last1=Natahadibrata|first1=Nadya|title=29 new dams to operate by 2019|url=http://www.thejakartapost.com/news/2014/12/03/29-new-dams-operate-2019.html|publisher=Jakarta Post|accessdate=21 December 2014|date=3 December 2014}}

In December 2014, a contract was signed with Sinohydro to construct the power station. It should be operational in 2019.{{cite news|title=Pembangunan PLTA Jati Gede Mulai Januari 2015|url=http://www.jpnn.com/read/2014/12/20/276713/Pembangunan-PLTA-Jati-Gede-Mulai-Januari-2015-|accessdate=7 January 2015|date=20 December 2014|language=Indonesian}} On 31 August 2015, the dam began to impound its reservoir, 30 days behind the most recent schedule.{{cite news|title=Govt Starts Flooding Jatigede Dam|url=http://jakartaglobe.beritasatu.com/news/govt-starts-flooding-jatigede-dam/|agency=Investor Daily|publisher=Jakarta Globe|date=1 September 2015|access-date=13 September 2015|archive-date=4 September 2015|archive-url=https://web.archive.org/web/20150904210600/http://jakartaglobe.beritasatu.com/news/govt-starts-flooding-jatigede-dam/|url-status=dead}}

Design

The Jatigede Dam will be a {{Convert|110|m|ft|0|abbr=on}} high and {{Convert|1715|m|ft|0|abbr=on}} long rock-fill embankment dam. Its crest will be {{Convert|12|m|ft|0|abbr=on}} wide and the body will contain {{Convert|6700000|m3|cuyd|0|abbr=on}} of fill. The dam's spillway will be a chute-type on the center of the downstream face. It will be controlled by four radial gates and have a discharge capacity of {{Convert|4468|m3/s|ft3/s|0|abbr=on}}. The irrigation intake will be located below the spillway. The dam will withhold a reservoir with a {{Convert|980000000|m3|acre.ft|0|abbr=on}} storage capacity of which {{Convert|877000000|m3|acre.ft|0|abbr=on}} is active (or 'usable') for water supply and power generation. The reservoir's catchment area encompasses {{Convert|1462|km2|mi2|0|abbr=on}} while the man-made lake will have a surface area of {{Convert|41.22|km2|mi2|0|abbr=on}}. The dam's crest elevation will be {{Convert|265|m|ft|0|abbr=on}} and the normal reservoir elevation {{Convert|260|m|ft|0|abbr=on}}. The intake for the power plant will be on the right abutment and will place water into a {{Convert|3050|m|ft|0|abbr=on}} long head-race tunnel before reaching the power plant downstream. The power plant will contain two 55 MW Francis turbine-generators (total capacity 110 MW) with a design hydraulic head of {{Convert|170|m|ft|0|abbr=on}}.