Line 2 (Wuhu Rail Transit)
{{Short description|Metro line in Wuhu, China}}
{{use dmy dates|date=October 2022}}
{{Infobox rail line
| name =
| logo =
| logo_width =
| color = {{rcr|WuhuRT|2}}
| image = A Line 2 Train is leaving Jiuziguangchang Station in Wuhu 2022.jpg
| image_width = 300px
| image_alt =
| caption =
| type = Straddle-beam monorail rapid transit
| system = Wuhu Rail Transit
| status = Operational
| start = {{stl|WuhuRT|Wanchunhulu}}
| end = {{stl|WuhuRT|Jiuziguangchang}}
| stations = 11
| routes = 1
| daily_ridership = 73,700 passengers (peak) (1 January 2022)
| open = {{Start date and age|2021|12|28|df=yes}}
| close =
| owner =
| operator =
| character = Elevated
| depot = {{plainlist|
- Mengxi Road Depot
- Jiangbei Parking Lot
}}
| stock = Bombardier INNOVIA Monorail 300
| linelength_km = 15.787
| tracklength =
| tracks = 2
| gauge =
| electrification =
| speed =
| elevation =
| website =
| map = {{WuhuRT Line 2}}
| map_state = collapsed
}}
The first phase of Line 2 of Wuhu Rail Transit ({{zh|s=芜湖轨道交通2号线|p=Wúhú guǐdào jiāotōng èrhàoxiàn}}) runs between Wanchunhulu station to Jiuziguangchang station, with transfer to Line 1 at Jiuziguangchang station. It consists of 11 stations and {{convert|15.787|km}} of track.{{cite web|url=https://mp.weixin.qq.com/s/BN48C5v2d25Y24mDXy_cHA|title=芜湖官宣!单轨2号线开通时间定了!}}{{cite web|url=https://www.wuhu.gov.cn/openness/public/6596211/30679581.html|title=轨道交通2号线一期进入全线调试阶段|date=2021-06-07}}{{cite web|url=http://www.sohu.com/a/132230313_672626|title=多图!芜湖轨道交通2号线最新进展曝光,赶紧来看!|website=www.sohu.com}} It opened on 28 December 2021.
Stations
class="wikitable"
! colspan=2 | Station name ! rowspan=2 | Connections ! colspan="2" rowspan="2" | Distance ! rowspan="2" |Location |
{{small|English}}{{cite web|url=https://i.ifeng.com/c/879aEX7n2p4|title=官宣!芜湖市轨道交通1号线、2号线一期站名正式确定!}} |
---|
style = "background:#{{rcr|WuhuRT|2}}; height: 2pt"
| colspan = "6" | |
{{stl|WuhuRT|Wanchunhulu}}
|{{large|{{lang|zh-cn|万春湖路}}}} | | | | rowspan="7" |Jiujiang |
{{stl|WuhuRT|Mengxilu}}
|{{large|{{lang|zh-cn|梦溪路}}}} | | | |
{{stl|WuhuRT|Huizhoulu}}
|{{large|{{lang|zh-cn|徽州路}}}} | | | |
{{stl|WuhuRT|Haiyanlu}}
|{{large|{{lang|zh-cn|海晏路}}}} | | | |
{{stl|WuhuRT|Zhengwuzhongxin}}
|{{large|{{lang|zh-cn|政务中心}}}} | | | |
{{stl|WuhuRT|Yunconglu}}
|{{large|{{lang|zh-cn|云从路}}}} | | | |
{{stl|WuhuRT|Shenshangongyuan}}
|{{large|{{lang|zh-cn|神山公园}}}} | | | |
{{stl|WuhuRT|Wuhu}}
|{{large|{{lang|zh-cn|芜湖火车站}}}} |{{rint|cn|rail}} WHH | | | rowspan="4" |Jinghu |
{{stl|WuhuRT|Shenshankou}}
|{{large|{{lang|zh-cn|神山口}}}} | | | |
{{stl|WuhuRT|Wenhualu}}
|{{large|{{lang|zh-cn|文化路}}}} | | | |
{{stl|WuhuRT|Jiuziguangchang}}
|{{large|{{lang|zh-cn|鸠兹广场}}}} |{{RouteBox|1|Line 1 (Wuhu Rail Transit)|#{{rcr|WuhuRT|1}}}} | | |
style = "background:#{{rcr|WuhuRT|2}}; height: 2pt"
| colspan = "6" | |
Phase 2
The second phase of Line 2 is under planning and will be completed by 2025. It will extend Line 2 to Jiangbei railway station.{{cite web|url=http://zjw.wuhu.gov.cn/xwzx/jsdt/8253322.html|date=2020-10-10|title=芜湖市城市轨道交通建设规划(2021-2025年)环境影响评价公众参与第一次公示}}
References
{{reflist}}
{{Anhui transit}}
Category:Wuhu Rail Transit lines
Category:Railway lines opened in 2021