List of roads and highways of Java
{{Short description|none}}
List of roads and highways of Java in Indonesia – this list is for the competed, under construction and project road and highway infrastructure of Java in Indonesia.
Map
Toll Roads
{{see also|List of toll roads in Indonesia}}
= Greater Jakarta =
- Jakarta Inner Ring Road (beltway)
- Jakarta Outer Ring Road (JORR) (beltway)
- JORR W1 (Pantai Indah Kapuk–Kebon Jeruk Toll Road) (finished)
- JORR W2 U (Kebon Jeruk–Ulujami Toll Road) (finished)
- JORR W2 S (Ulujami–Pondok Pinang Toll Road) (finished)
- JORR S (Pondok Pinang–Taman Mini Indonesia Indah Toll Road)[http://www.jlj.co.id] (finished)
- JORR E1 (Taman Mini Indonesia Indah–Cikunir Toll Road) (finished)
- JORR E2+E3 (Cikunir–Cakung–Cilincing Toll Road) (finished)
- JORR N (Tanjung Priok Access Toll Road) (finished)
- Jakarta Outer Ring Road 2 (JORR 2) (beltway){{Cite web |url=http://www.bpjt.net/index.php?id=53&itemid=2&mode=3 |title=Badan Pengatur Jalan Tol |access-date=2010-09-20 |archive-url=https://web.archive.org/web/20120306225122/http://www.bpjt.net/index.php?id=53&itemid=2&mode=3 |archive-date=2012-03-06 |url-status=dead }}
- Cengkareng–Batu Ceper–Kunciran Toll Road (finished)
- Kunciran–Serpong Toll Road (finished)
- Cinere–Serpong Toll Road (finished)
- Cinere–Jagorawi Toll Road (finished)
- Cimanggis–Cibitung Toll Road (finished)
- Cibitung–Cilincing Toll Road (finished)
- Prof. Dr. Ir. Soedijatmo Toll Road (Soekarno–Hatta International Airport Toll Road)
- Jakarta–Serpong Toll Road
- Serpong–Balaraja Toll Road (partially finished)
- Jakarta–Tangerang Toll Road (finished)
- Jakarta–Cikampek Toll Road (finished)
- Bogor Ring Road (partially finished)
- TMII–Bogor Toll Road (contract)
= Outside Jakarta =
- Surabaya/Waru–Juanda International Airport Toll Road
- Surabaya–Madura Bridge (Suramadu Bridge) (opened at 9 June 2009)
- Trans-Java Toll Road (major parts are already finished, only Probolinggo–Banyuwangi left) {{Jct|country=IDN|AH|2}}{{Cite web |url=http://www.bpjt.net/index.php?id=53&itemid=1&mode=3 |title=Badan Pengatur Jalan Tol |access-date=2010-09-20 |archive-url=https://web.archive.org/web/20120306225127/http://www.bpjt.net/index.php?id=53&itemid=1&mode=3 |archive-date=2012-03-06 |url-status=dead }}
- Cilegon–Bojonegara Toll Road (tender preparation)
- Tangerang–Merak Toll Road (finished)
- Jakarta–Tangerang Toll Road (finished)
- Jagorawi Toll Road (finished)
- Bogor–Ciawi–Sukabumi Toll Road (section 1 & 2 finished, section 3 & 4 under construction)
- Sukabumi–Ciranjang Toll Road (tender preparation)
- Ciranjang–Padalarang Toll Road (contract)
- Jakarta–Cikampek Toll Road (finished)
- Cikampek–Purwakarta–Padalarang Toll Road (Cipularang Toll Road) (finished)
- Padalarang–Cileunyi Toll Road (Padaleunyi Toll Road) (finished)
- Cileunyi-Sumedang-Dawuan Toll Road (Cisumdawu Toll Road) (finished)
- Cikopo–Palimanan Toll Road (Cipali Toll Road) (finished)
- Palimanan–Kanci Toll Road (Palikanci Toll Road) (finished)
- Kanci–Pejagan Toll Road (finished)
- Pejagan–Pemalang Toll Road (finished)
- Pemalang–Batang Toll Road (finished)
- Batang–Semarang Toll Road (finished)
- Semarang Toll Road (finished)
- Semarang–Demak Toll Road (section 1 under construction, section 2 finished)
- Semarang–Solo Toll Road (finished)
- Solo–Yogyakarta Toll Road (construction)
- Solo–Mantingan–Ngawi Toll Road (finished)
- Ngawi–Kertosono Toll Road (finished)
- Kertosono–Mojokerto Toll Road (finished)
- Surabaya–Mojokerto Toll Road (finished)
- Surabaya–Gresik Toll Road (finished)
- Surabaya–Gempol Toll Road (finished)
- Gempol–Pandaan Toll Road (finished)
- Pandaan-Malang Toll Road (finished)
- Gempol–Pasuruan Toll Road (finished)
- Pasuruan–Probolinggo Toll Road (finished)
- Probolinggo–Banyuwangi Toll Road (section 1, 2, 3 under construction, section 4, 5, 6, 7 preparation)
- Jakarta–Surabaya Toll road (parts of Trans-Java Toll road) (finished)
- Yogyakarta Outer Ring Road
= Planned =
- Sunda Strait Bridge {{Jct|country=IDN|AH|25}}
- Serang–Panimbang Toll Road (section 2 & 3 under construction){{Citation |title=Jalan Tol Serang–Panimbang |date=2023-12-24 |work=Wikipedia bahasa Indonesia, ensiklopedia bebas |url=https://id.wikipedia.org/w/index.php?title=Jalan_Tol_Serang%E2%80%93Panimbang&oldid=25060193 |access-date=2024-07-14 |language=id}}
- Jakarta Harbor Road 2 (Tanjung Priok–Ancol Timur–Pluit) Toll Road (under construction)
- Jakarta Inner Ring Road 2 (JIRR 2) (beltway){{Citation |title=Jalan Tol Layang Dalam Kota Jakarta |date=2023-07-26 |work=Wikipedia bahasa Indonesia, ensiklopedia bebas |url=https://id.wikipedia.org/w/index.php?title=Jalan_Tol_Layang_Dalam_Kota_Jakarta&oldid=23904934 |access-date=2024-07-14 |language=id}}
- Semanan–Grogol–Sunter Toll Road (phase 1)
- Sunter–Kelapa Gading–Pulogebang Toll Road (phase 1)
- Duri Pulo–Kampung Melayu Toll Road (phase 2)
- Kampung Melayu–Kemayoran Toll Road (phase 2)
- Ulujami–Tanah Abang Toll Road (phase 3)
- Pasar Minggu–Casablanca Toll Road (phase 4)
- Jakarta/Antasari–Depok Toll Road (section 3 & 4 under construction){{Citation |title=Jalan Tol Depok–Antasari |date=2024-04-16 |work=Wikipedia bahasa Indonesia, ensiklopedia bebas |url=https://id.wikipedia.org/w/index.php?title=Jalan_Tol_Depok%E2%80%93Antasari&oldid=25573960 |access-date=2024-07-14 |language=id}}
- Bekasi–Cawang–Kampung Melayu Toll Road (Becakayu Toll Road), (section 2B under construction){{Citation |title=Jalan Tol Bekasi–Cawang–Kampung Melayu |date=2024-05-14 |work=Wikipedia bahasa Indonesia, ensiklopedia bebas |url=https://id.wikipedia.org/w/index.php?title=Jalan_Tol_Bekasi%E2%80%93Cawang%E2%80%93Kampung_Melayu&oldid=25712251 |access-date=2024-07-14 |language=id}}
- Jakarta Outer Ring Road 3 (JORR 3) (beltway){{Cite web |title=Jalan Tol Lingkar Luar Jakarta 3 |url=https://id.wikipedia.org/wiki/Jalan_Tol_Lingkar_Luar_Jakarta_3 |archive-url=}}{{Circular reference|date=August 2024}}
- Kamal–Teluk Naga–Rajeg Toll Road
- Semanan–Balaraja Toll Road
- Serpong–Balaraja Toll Road{{Citation |title=Jalan Tol Serpong–Balaraja |date=2024-06-24 |work=Wikipedia bahasa Indonesia, ensiklopedia bebas |url=https://id.wikipedia.org/w/index.php?title=Jalan_Tol_Serpong%E2%80%93Balaraja&oldid=25915935 |access-date=2024-07-14 |language=id}} (section 2 & 3 under construction)
- Serpong–Bitung–Batu Ceper Toll Road
- Bogor–Serpong (via Parung) Toll Road
- BORR (Bogor Outer Ring Road) Toll Road (section 3B under construction){{Citation |title=Jalan Tol Lingkar Luar Bogor |date=2024-04-28 |work=Wikipedia bahasa Indonesia, ensiklopedia bebas |url=https://id.wikipedia.org/w/index.php?title=Jalan_Tol_Lingkar_Luar_Bogor&oldid=25637216 |access-date=2024-07-14 |language=id}}
- Sentul–Karawang Barat Toll Road
- Karawang Barat–Babelan Toll Road
- Babelan–Pulogebang Toll Road
- Salabenda Junction Toll Road
- Jakarta–Cikampek 2 South (JAPEK 2 Selatan) Toll Road (under construction){{Citation |title=Jalan Tol Jakarta–Cikampek II |date=2024-06-10 |work=Wikipedia bahasa Indonesia, ensiklopedia bebas |url=https://id.wikipedia.org/w/index.php?title=Jalan_Tol_Jakarta%E2%80%93Cikampek_II&oldid=25815809 |access-date=2024-07-14 |language=id}}
- Bogor–Ciawi–Sukabumi (section 3 & 4 under construction){{Citation |title=Jalan Tol Bogor–Ciawi–Sukabumi |date=2024-06-22 |work=Wikipedia bahasa Indonesia, ensiklopedia bebas |url=https://id.wikipedia.org/w/index.php?title=Jalan_Tol_Bogor%E2%80%93Ciawi%E2%80%93Sukabumi&oldid=25896330 |access-date=2024-07-14 |language=id}}
- Sukabumi–Ciranjang Toll Road (awaits for Bocimi to be fully finished)
- Ciranjang–Padalarang Toll Road (awaits for Bocimi to be fully finished)
- BIUTR (Bandung Intra Urban Toll Road) (tender preparation){{Citation |title=Jalan Tol Dalam Kota Bandung |date=2023-07-21 |work=Wikipedia bahasa Indonesia, ensiklopedia bebas |url=https://id.wikipedia.org/w/index.php?title=Jalan_Tol_Dalam_Kota_Bandung&oldid=23883733 |access-date=2024-07-14 |language=id}}
- BAndung Outer Ring Road (BAORR) (beltway)
- Bandung South Ring Road Toll Road (tender preparation)
- Bandung North Ring Road Toll Road (planned)
- Gedebage–Tasikmalaya–Cilacap Toll Road (tender preparation)
- Cilacap–Yogyakarta Toll Road (awaits for Getaci & Yoglo to be finished)
- Semarang–Demak Toll Road (section 1 under construction, section 2 finished)
- Semarang Harbour Road (Semarang–Kendal) Toll Road (planned)
- Solo–Yogyakarta Toll Road (under construction)
- Probolinggo–Banyuwangi Toll Road (section 1, 2, 3 under construction, section 4, 5, 6, 7 preparation)
Notes
{{reflist}}