Markland Locks and Dam

{{Use mdy dates|date=April 2025}}

{{Use American English|date=January 2025}}

{{Infobox dam

| name = Markland Locks and Dam

| image = P4100217_Markland_Locks_and_Dam.JPG

|image_size=300px

| image_caption = Markland Locks and Dam

| name_official =

| dam_crosses = Ohio River

| res_name =

| location = Gallatin County, Kentucky / York Township, Switzerland County, Indiana United States

| operator = 24px United States Army Corps of Engineers Louisville District,
Duke Energy Indiana

| dam_length = 1395 ft (425.2 m)

| dam_height =

| dam_width_base =

| construction_began = March 1956

| opening = June 1964

| cost =

| plant_capacity = 81 Mva

| plant_operator = Duke Energy{{cite web|url=http://www.lrl.usace.army.mil/Missions/CivilWorks/Navigation/LocksandDams/MarklandLocksandDam.aspx|archive-url=https://web.archive.org/web/20130222213532/http://www.lrl.usace.army.mil/Missions/CivilWorks/Navigation/LocksandDams/MarklandLocksandDam.aspx|url-status=dead|archive-date=February 22, 2013|title=Louisville District > Missions > Civil Works > Navigation > Locks and Dams > Markland Locks and Dam|publisher=}}

| res_capacity_total =

| res_catchment =

| res_surface =

| coordinates = {{coord|38|46|29|N|84|57|51|W|region:US-IN_type:landmark|display=inline,title}}

| extra =

}}

The Markland Locks and Dam is a concrete dam bridge and locks that span the Ohio River. It is 1395 feet (425.2 m) long, and connects Gallatin County, Kentucky, and Switzerland County, Indiana.

The locks and dam were reviewed by the Board of Engineers for River and Harbours to replace the Ohio River locks and dams Number 35, 36, 37, 38 and 39. Then the project was approved by the Secretary of the Army on March 11, 1953. Construction on the locks began in March 1956 and they were placed in operation in May 1959. The dam construction began in April 1959 and was finished in June 1964.

Federal Power Commission granted a license for Cinergy to operate a hydroelectric power plant at the dam. Cinergy was later bought by Duke Energy. The plant has a capacity of 81,000 kVA.{{Cite web

|url = http://www.lrl.usace.army.mil/opl/article.asp?id=106&MyCategory=1

|title = Markland

|publisher = United States Army Corps of Engineers: Louisville District

|archivedate = 2012-12-12

|archiveurl = https://archive.today/20121212035517/http://www.lrl.usace.army.mil/opl/article.asp?id=106&MyCategory=1

|url-status = dead

}}

On September 27, 2009, the 1,200-foot lock failed and the gates "mismitered" due to a solenoid malfunction. The lock was repaired and reopened on March 1, 2010. The 1,200-foot lock chamber remained closed for 155 days, but the 600-foot lock continued to lock traffic albeit with delays.{{Cite web

|url = http://www.lrl.usace.army.mil/poi/article.asp?id=578&MyCategory=363

|title = Markland Locks & Dam

|publisher = United States Army Corps of Engineers: Louisville District

|archivedate = 2012-02-09

|archiveurl = https://www.webcitation.org/65Kg7feza?url=http://www.lrl.usace.army.mil/poi/article.asp?id=578&MyCategory=363

|url-status = dead

}}

See also

{{stack|{{Portal|Indiana|United States|Water|Renewable energy}}}}

References

{{reflist}}