Mumbai CSMT–Thiruvananthapuram Weekly Express

{{Short description|Express train in India}}

{{more footnotes|date=February 2025}}

{{Use dmy dates|date=October 2018}}

{{Use Indian English|date=October 2018}}

{{Infobox rail service

| name = Mumbai Chhatrapati Shivaji Maharaj Terminus–Thiruvananthapuram Central Weekly Express

| image =

| image_width =

| caption =

| type = Express

| locale = Maharashtra, Kerala, Karnataka, telangana, ANDHRA Pradesh

| first = 2003 AUGUST 24 (19 YEARS AGO )

| last = 2020(FOR CONVERT TO LHB )

| operator = Southern Railway zone

| ridership =SOUTH WESTERN RAILWAY & SOUTHERN RAILWAY

| start = {{stnlnk|Chhatrapati Shivaji Maharaj Terminus}} (CSMT)

| stops = 41

| end = {{stnlnk|Thiruvananthapuram Central}} (TVC)

| distance = {{convert|1946|km|0|abbr=on}}

| journey time = 39h 10m

| frequency = Weekly {{efn|Runs one day in a week for every direction.}}

| class = AC 2 tier, AC 3 tier, Sleeper class, General Unreserved, AC TIER ECONOMY

| seating = YES

| sleeping = Yes

| autorack = YES

| catering = Pantry car
On-board catering
E-catering

| observation = LHB coach

| entertainment = No

| baggage = No

| other facilities= Below the seats

| stock = 2

| gauge = {{track gauge|1676mm|al=on|allk=on}}

| electrification =

| trainnumber = 16331/16332

| speed = {{convert|42|km/h|0|abbr=on}}, including halts

| map =

| map_state =

}}

The 16331/16332 Mumbai Chhatrapati Shivaji Maharaj Terminus–Thiruvananthapuram Central Weekly Express is an express train belonging to Southern Railway zone that runs between Chhatrapati Shivaji Maharaj Terminus railway station and {{stnlnk|Thiruvananthapuram Central}} in India.

Service

The 16331/Mumbai Chhatrapati Shivaji Maharaj Terminus–Thiruvananthapuram Central Weekly Express has an average speed of 50 km/h and covers 1946 km in 39h 10m. The 16332/Thiruvananthapuram Central–Mumbai Chhatrapati Shivaji Maharaj Terminus Weekly Express has an average speed of 48 km/h and covers 1946 km in 40h 25m.[http://www.thehindu.com/todays-paper/tp-national/tp-kerala/trains-to-be-detained/article19112872.ece Trains to be detained][http://www.swr.indianrailways.gov.in/view_detail.jsp?lang=0&id=0,4,268&dcd=1672&did=14918890685895C913A9717F8668FE3D8326CFE96F42C.web91 TRAINS REGULATED/REGULATED][http://www.cr.indianrailways.gov.in/view_detail.jsp?lang=0&id=0,4,268&dcd=3816&did=14865569937246394BEA7BAF921CE199FD009BB3492B5.web91 Temporary Halt at Gangapur Road Station on Solapur Division for 5 pairs of trains for 5 days][http://timesofindia.indiatimes.com/city/aurangabad/two-express-trains-get-superfast-status/articleshow/57069750.cms Two express trains get superfast status]

Route and halts

The important halts of the train are:

  • {{stnlnk|Chhatrapati Shivaji Maharaj Terminus}}
  • {{stnlnk|Dadar}} Central
  • {{stnlnk|Thane}}
  • {{stnlnk|Kalyan Junction}}
  • {{stnlnk|Karjat Junction}}
  • {{stnlnk|Lonavala}}
  • {{stnlnk|Pune Junction}}
  • {{stnlnk|Daund Junction}}
  • {{stnlnk|Solapur}}
  • {{stnlnk|Gulbarga}}
  • {{stnlnk|Wadi Junction}}
  • {{stnlnk|Mantralayam Road}}
  • {{stnlnk|Guntakal Junction}}
  • {{stnlnk|Dharmavaram Junction}}
  • {{stnlnk|Krishnarajapuram}}
  • {{stnlnk|Bangarapet Junction}}
  • {{stnlnk|Salem Junction}}
  • {{stnlnk|Erode Junction}}
  • {{stnlnk|Coimbatore Junction}}
  • {{stnlnk|Palakkad Junction}}
  • {{stnlnk|Ernakulam Junction}}
  • {{stnlnk|Alappuzha}}
  • {{stnlnk|Kollam Junction}}
  • {{stnlnk|Thiruvananthapuram Central}}

Coach composition

The train has standard LHB rakes with a maximum speed of 130 km/h. The train consists of 23 coaches:

  • 1 AC II Tier
  • 6 AC III Tier
  • 2 AC III Tier Economy
  • 7 Sleeper coaches
  • 1 Pantry car
  • 4 General Unreserved
  • 1 Seating cum Luggage Car
  • 1 Generator Car

1+6+7+1+4+1+1=23 RAKES consists

class="wikitable plainrowheaders unsortable" style="text-align:center"
scope="col" rowspan="1" style="background:red;"| Loco

!scope="col" rowspan="1" style="background:orange;"| 1

!scope="col" rowspan="1" style="background:pink;"| 2

!scope="col" rowspan="1" style="background:pink;"| 3

!scope="col" rowspan="1" style="background:skyblue;"| 4

!scope="col" rowspan="1" style="background:skyblue;"| 5

!scope="col" rowspan="1" style="background:skyblue;"| 6

!scope="col" rowspan="1" style="background:skyblue;"| 7

!scope="col" rowspan="1" style="background:skyblue;"| 8

!scope="col" rowspan="1" style="background:skyblue;"| 9

!scope="col" rowspan="1" style="background:skyblue;"| 10

!scope="col" rowspan="1" style="background:lightblue;"| 11

!scope="col" rowspan="1" style="background:blue;"| 12

!scope="col" rowspan="1" style="background:blue;"| 13

!scope="col" rowspan="1" style="background:lime;"| 14

!scope="col" rowspan="1" style="background:lime;"| 15

!scope="col" rowspan="1" style="background:lime;"| 16

!scope="col" rowspan="1" style="background:lime;"| 17

!scope="col" rowspan="1" style="background:lime;"| 18

!scope="col" rowspan="1" style="background:lime;"| 19

!scope="col" rowspan="1" style="background:yellow;"| 20

!scope="col" rowspan="1" style="background:pink;"| 21

!scope="col" rowspan="1" style="background:pink;"| 22

!scope="col" rowspan="1" style="background:grey;"| 23

25pxSLRURURS1S2S3S4S5S6S7PCM2M1B1B2B3B4B5B6A1URUREOG

(Coach Position of 16331 Express)

No rake sharing. Pure LHB Coaches.

Traction

An erode/KYN based WAP-7 hauls the train end to end in both directions.

Schedule

  • 16331 – Starts from Chhatrapati Shivaji Maharaj Terminus every Sunday at night 08:35 PM IST and reaches Thiruvananthapuram Central on Tuesday at morning 07:00 AM IST
  • 16332 – Starts from Thiruvananthapuram Central every Saturday at morning 04:25 AM IST and reaches Chhatrapati Shivaji Maharaj Terminus on Sunday 7:15 PM IST

See also

Notes

{{notelist}}

References

{{reflist}}