Oesterdam
{{Short description|Compartmentalisation dam in the Netherlands, part of the Delta Works}}
{{Use dmy dates|date=December 2023}}
{{Use British English|date=December 2023}}
{{Infobox bridge
| bridge_name = Oesterdam
| native_name =
| native_name_lang = nl
| image = Oesterdam-01.jpg
| image_size =
| alt =
| caption = The Oesterdam
| official_name =
| other_name =
| carries = N659 road
| crosses = Eastern Scheldt Estuary
| locale =
| owner = Rijkswaterstaat
| maint =
| id =
| architect =
| designer =
| engineering = Deltadienst
| design =
| material =
| length = {{convert|10.5|km|mi}}
| width =
| height =
| mainspan =
| spans =
| pierswater =
| load =
| clearance =
| below =
| life =
| builder = Several contractors, including:
Zanen Verstoep,
Baggermaatschappij Holland bv, and
Volker Stevin Baggeren
| fabricator =
| begin = 1979
| complete = 1986
| cost =
| open = 1989 (fully open with N569 road constructed over the dam)
| inaugurated =
| toll =
| traffic =
| preceded =
| followed =
| heritage =
| collapsed =
| closed =
| replaces =
| map_cue =
| map_image =
| map_alt =
| map_text =
| map_width =
| coordinates = {{Coord|51|28|43.4|N|4|13|11.6|E|region:US_type:landmark|display=it}}
| lat =
| long =
| references =
| extra =
}}
The {{lang|nl|Oesterdam}} (English: Oyster Dam) is a compartmentalisation dam in The Netherlands, situated between Tholen and South Beveland in the eastern part of the Eastern Scheldt. The dam, with a length of 10.5 kilometres, is the longest structure built for the Delta Works. The Oesterdam was necessitated, like the Philipsdam, after the decision was taken to close off the Eastern Scheldt with a storm surge barrier, rather than a solid dam.
For navigation of recreational boats and fishing vessels between the Scheldt–Rhine Canal and the Eastern Scheldt, the dam contains a small lock near its northern end, the {{lang|nl|Bergse Diepsluis}}. Located adjacent to the dam near its southern end are a pair of large locks, the {{lang|nl|Kreekraksluizen}}, constructed to separate the canal's brackish water to the south from the freshwater to the north.{{cite web |title=Oester Dam |url=https://www.watersnoodmuseum.nl/en/water-knowledge/learn-about-water-safety/articles/oester-dam |website=Watersnoodmuseum |publisher=Stichting Nationaal Monument Watersnood 1953 |access-date=27 May 2025}}
{{Delta Plan}}
Design background
The Oesterdam was not originally part of the planned Delta Works, but rather is one of the compartmentalisation dams which became necessary when it was decided not to close off the Eastern Scheldt, but to provide it with a permeable barrier.{{Cite journal |last=Saeijs |first=H. L. F. |last2=de Jong |first2=A. |date=1982 |title=The Oosterschelde and the protection of the environment |url=https://www.jstor.org/stable/43619591 |journal=Ekistics |volume=49 |issue=293 |pages=150–156 |issn=0013-2942 |access-date=26 December 2023}}
The reduced tidal movement in the estuary associated with this decision meant that, to achieve sufficient tidal movement, the surface area of the Eastern Scheldt would have to be reduced. This was achieved by the construction of compartmentalisation dams: the Markiezaatskade, the Philipsdam, the Volkerakdam, and the Oesterdam.{{Cite journal |last1=Smits |first1=A. J. M. |last2=Nienhuis |first2=P. H. |last3=Saeijs |first3=H. L. F. |date=2006 |title=Changing Estuaries, Changing Views |url=https://link.springer.com/10.1007/s10750-005-1924-4 |journal=Hydrobiologia |language=en |volume=565 |issue=1 |pages=339–355 |doi=10.1007/s10750-005-1924-4 |issn=0018-8158 |s2cid=40700436 |access-date=26 December 2023|hdl=1765/1850 |hdl-access=free |url-access=subscription }}{{Cite book |last=Ferguson |first=H.A. |url=http://resolver.tudelft.nl/uuid:a0ecd908-ff03-4855-a33e-f6b5254e86c9 |title=Delta-visie: Een terugblik op 40 jaar natte waterbouw in Zuidwest-Nederland |publisher=Rijkswaterstaat |year=1986 |location=The Hague |language=nl |trans-title=Delta-vision: Looking back at 40 years of wet civil engineering in the South-West Netherlands |access-date=15 July 2023}}{{Cite web |date=2015 |title=Alles draaide om praktische innovatie |trans-title=The Oosterscheldekering: Everything revolved around practical innovation |url=https://www.cobouw.nl/26507/alles-draaide-om-praktische-innovatie |access-date=26 December 2023 |website=www.cobouw.nl |language=nl}}{{Cite journal |last=Yang |first=C. |date=1986 |title=Estimates of sand transport in the Oosterschelde tidal basin using current-velocity measurements |url=http://dx.doi.org/10.1016/0025-3227(86)90104-0 |journal=Marine Geology |volume=72 |issue=1–2 |pages=143–170 |bibcode=1986MGeol..72..143Y |doi=10.1016/0025-3227(86)90104-0 |issn=0025-3227 |access-date=26 December 2023|url-access=subscription }}
File:Oesterdam-MarkiezaatskadeEN.jpg
With the construction of the compartmentalisation works, the freshwater {{Lang|nl|Volkerak-Zoommeer}} was created, with benefits for agriculture. At the same time, a tide-free shipping route was created from the Volkerak locks to Antwerp.
The {{lang|nl|Commissie Compartimentering Oosterschelde}} (English: Committee for Compartmentalisation of the Eastern Scheldt) was formed under the aegis of the Dutch Minister of Transport and Water Management. Its mandate included reporting to both the minister and the provincial authorities of Zeeland and North Brabant by 30 April 1975. This report was to cover the technical, planning, and financial considerations of various proposals for compartmentalising the Eastern Scheldt.{{Cite journal |last=Walther |first=A.W. |date=1980 |title=Hydraulic Research in the Oosterschelde Estuary |url=http://ascelibrary.org/doi/10.1061/9780872622647.141 |journal=Coastal Engineering |language=en |publisher=American Society of Civil Engineers |pages=2360–2376 |doi=10.1061/9780872622647.141 |isbn=978-0-87262-264-7 |access-date=26 December 2023|url-access=subscription }}
The necessity of this committee arose from the need to maintain a substantial tidal difference at Yerseke and to ensure tide-independent inland navigation between Antwerp and Rotterdam, in accordance with an existing treaty with Belgium. The committee evaluated multiple alternatives, each suggesting a unique design for the dam. The chosen plan for the Oesterdam entailed a path from the Scheldt-Rhine Canal through the Bathse polders in a northerly direction, incorporating a separate spillway channel leading to a sluice in the Western Scheldt – the Bathse sluice – along with enhancements to the Canal through South Beveland.
In the initial phases, the Bathse spillway channel's dam body was positioned west of the Kreekrak locks, intended to become operational concurrent with the completion of the Oesterdam. The proposed lock connecting the Zoommeer and the Eastern Scheldt was planned to be situated southwest of the Tholense Gap. This location was selected for its feasibility and its connection to an easily constructible section of the dam over the Speelmansplaten. This configuration resulted in two remaining gaps, the Marollegat and the Tholense Gap, that needed closure.
Construction
Construction began after the completion of the Markiezaatskade dam (1981 - 1983), the tidal effects of the completed dam making the construction of the Oesterdam easier. The initial strategy for the Oesterdam's construction involved using a sand closure for the extensive southern segment up to the new Bergse Diepsluis, and completing the section from the Bergse Diepsluis to Tholen with a cable car and concrete blocks. Construction commenced in 1979 with the establishment of a work island on the Speelmansplaten, which was completed by 1980.{{Cite book |last=Steenhuis |first=Marinke |title=De Deltawerken |last2=Voerman |first2=Lara |date=2016 |publisher=nai010 uitgevers |isbn=978-94-6208-272-4 |location=Rotterdam}}
The geotechnical and engineering geology challenges during the construction of the Oesterdam were substantial. The Holocene strata, extending from N.A.P. -5 m to -16 metres, were irregular, consisting of sand, peat, and clay layers of varying thickness. Beneath these, Pleistocene layers included deposits of sand with interspersed clay and shell grit. Towards Speelmansplaten and the Marolle Gap, the Holocene layer's thickness decreased, indicating lesser erosion over time.
In some areas, thick deposits of the Dunkirk clay formation were directly on top of peat, or beneath a sand covering. Significant erosion by the Scheldt river had previously formed a valley in the southernmost 100 metres of the works, which had later filled with a complex mix of clay and sand.
Geotechnical investigations had revealed poor subsoil quality at the Speelmansplaten and Marolle Gap dike sections. To minimise instability risks during construction, various solutions were explored, such as supporting berms, vertical drainage, soil improvement, and phased construction with specific profiles to ensure stability.
For the construction of the dam body, particular attention was paid to the soil structure. The design followed the top of the load-bearing Pleistocene sand. A uniformly wide base width of 76 metres was adopted for simplicity, widened to 110 metres near the last closing gap of the Marolle Gap to minimise instability risks. In the South dike section, the subsoil allowed for direct construction on the existing ground over 100 metres. The termination of the excavation work was strategically planned to ensure stability. Specific requirements were set for dam body construction in transition areas, focusing on maintaining stability and integrity.
The dam was then constructed in stages. Owing to delays and advancements in dredging technology, which offered increased capacities at relatively lower costs, it was later decided to execute the Tholense Gat closure also with sand. This approach necessitated creating an extended tidal curve for several days, by partially closing the Oosterscheldekering. An assessment of the environmental impact of this method deemed it acceptable.{{Cite journal |last=Leentvaar |first=J. |last2=Nijboer |first2=S. M. |date=1986 |title=Ecological Impacts of the Construction of Dams in an Estuary |url=https://iwaponline.com/wst/article/18/4-5/181/26576/Ecological-Impacts-of-the-Construction-of-Dams-in |journal=Water Science and Technology |language=en |volume=18 |issue=4-5 |pages=181–191 |doi=10.2166/wst.1986.0194 |issn=0273-1223 |access-date=26 December 2023|url-access=subscription }}
The dredging vessels used on the project included the Aquarius, the Sliedrecht 27, the Zuiderklip, and the Mercurius.{{Cite web |title=Mercurius - Cutter suction dredgers - Equipment {{!}} Dredging Database |url=https://www.dredgepoint.org/dredging-database/equipment/mercurius-1 |access-date=2023-12-27 |website=www.dredgepoint.org}} The production data of some of the dredgers, showing the increase in output from the originally planned sand closure volumes, is presented in the table below:
In 1986, the dam's closure was executed using sand as the primary material. The construction of the road (N659) across the dam was completed in 1989. This new route was inaugurated by the Commissioner of the King, Kees Boertien, marking its official opening to the public.{{cite journal |last= |first= |title=Themanummer Compartimenteringswerken |trans-title=Special Issue on Compartmentalization Works |url=http://resolver.tudelft.nl/uuid:122a9ea5-c74c-4cdd-b430-4e1309eaf7d9 |journal=Driemaandelijke bericht Deltawerken |date=1985 |issue=111 |pages=1-39 |language=nl |access-date=26 December 2023}}
The Bergse Diepsluis, situated at the northern extremity of the dam, stands on the historical site of the submerged city of Reimerswaal. The city was destroyed by repeated floods, and the last citizens left in 1632. Recognising the historical significance of the area, an information centre was established at the Bergse Diepsluis in July 2022. This centre serves as a memorial and educational point, detailing the history of approximately 250 villages in Zeeland that were submerged in Reimerswaal (in the period 1550-1650) and elsewhere in the province.{{cite news |url=https://www.omroepzeeland.nl/nieuws/14810615/informatiepunt-over-verdronken-dorpen-op-oesterdam-geopend?mc_cid=d6633c737f&mc_eid=9f1dfa93b0 |title=Informatiepunt over verdronken dorpen op Oesterdam geopend |trans-title=Information Point on Sunken Villages at Oesterdam Opened |newspaper=Omroep Zeeland |date=14 July 2022 |language=nl |access-date=26 December 2023}}{{Cite journal |last=Kooistra |first=M.J. |date=1979 |title=Two methods of preparing thin sections of wet soil from sediments in a marine intertidal zone in the Oosterschelde (the Netherlands). |url=http://dx.doi.org/10.18174/njas.v27i3.17056 |journal=Netherlands Journal of Agricultural Science |volume=27 |issue=3 |pages=235–240 |doi=10.18174/njas.v27i3.17056 |issn=0028-2928 |access-date=26 December 2023}}
Gallery
File:Oesterdam closure83.jpg|Aerial view of the sand closure of the Oesterdam (1983)
File:Oesterdam-02.jpg|The Markiezaat Lake, Oesterdam, and Eastern Scheldt
File:Oesterdam-03.jpg|The Oesterdam with the Bergsediepsluis
File:Oesterdam-04.jpg|The Oesterdam with the Bergsediepsluis
File:Zandsluiting Tholense Gat.jpg|Sand closure of the Tholense Gap
File:Zandsluiting Tholense Gat2.jpg|Aerial photo of the closure gap
File:Oesterdam work.jpg|Sand closure works at the Molenplaat section of the Oesterdam (1983)