Orange Line (Nagpur Metro)#Stations

{{short description|Metro route of mass rapid transit system in Nagpur, India}}

{{Use dmy dates|date=January 2024}}

{{Use Indian English|date=January 2024}}

{{Infobox rail line

| name = Orange Line

| color = {{rail color|Nagpur Metro|Orange}}

| image =

| image_width =

| caption =

| type = Rapid Transit

| system = Nagpur Metro

| status = Operational

| locale = Nagpur

| start = Automotive Square

| end = Khapri

| stations = 18

| daily_ridership =

| open = 8 March 2019

| event1label = Inaugurated

| event1 = 7 March 2019

| close =

| operator = MahaMetro

| character = At-Grade & Elevated

| stock = CRRC Dalian

| linelength = 19.658 km

| tracklength =

| tracks =

| gauge = {{Track gauge|sg}} (Standard gauge)

| electrification = 25 kV 50 Hz AC Overhead catenary

| speed =

| elevation =

| map = {{Nagpur Metro North-South Line}}

| map_state = expanded

}}

The Orange Line, also known as the North–south corridor, of the Nagpur Metro is a metro route of mass rapid transit system in Nagpur, India. It consists of 20 metro stations from Automotive Square to Metro City with a total distance of {{Convert|22.293|km|4=4|abbr=on|sp=us}}. Most of the line is elevated. It is the first line of the Nagpur Metro and was inaugurated by Prime Minister Narendra Modi on 7 March 2019, and opened to the public the next day on International Women's Day.

This corridor originates from Automotive Square on Kamptee Road; moves along Kamptee Road and reaches the intersection point of Amravati Road and Wardha Road, then after crossing a flyover moves towards Munje Square, moves towards Dhantoli and along nala moves towards Empire/Dr Munje Marg, leads towards Congress Nagar T-Point, then on Rahate Colony Road and then falls on Wardha Road, leads towards NEERI, then moves along Wardha Road and then west of Railway Track in MIHAN area. And passes through {{Convert|14|m|abbr=on|sp=us}} wide stretch of land between the railway boundary line and the road near proposed Container Depot.

Entire length ({{Convert|22.2938|km|abbr=on|sp=us}}) of this corridor is proposed as elevated except in {{Convert|4.6|km|4=4|abbr=on|sp=us}} at grade after Airport Station and in MIHAN area near Khapri Railway Station. There are 20 stations on this corridor of which 15 stations are elevated and 5 stations are at Grade. Sitaburdi Station is an inter-change station. Average inter-station distance is {{Convert|1.2|km|4=4|abbr=on|sp=us}} approximately varying from {{Convert|0.54 to 2.4|km|4=4|abbr=on|sp=us}} depending upon the site, operational and traffic requirements.

This line initially started operations with five stations opening in the stretch between Sitabuldi and Khapri on 8 March 2019.{{Cite web|url=https://www.latestly.com/india/news/nagpur-metro-flagged-off-by-pm-narendra-modi-to-be-open-for-public-from-march-8-681132.html|title=Nagpur Metro Flagged Off by PM Narendra Modi, To Be Open For Public From March 8|date=7 March 2019|website=Latestly|access-date=7 March 2019}}{{Cite web|url=https://www.financialexpress.com/infrastructure/nagpur-metro-giving-infra-projects-a-good-name/1666035/|title=Nagpur Metro giving infra projects a good name|date=5 August 2019|access-date=21 December 2019}}{{Cite web|url=https://www.latestly.com/india/information/nagpur-metro-launch-today-to-be-open-for-public-from-march-8-routes-stations-and-all-you-need-to-know-679765.html|title=Nagpur Metro Launch Today, To Be Open For Public From March 8: Routes, Stations And All You Need To Know | 📝 LatestLY|date=7 March 2019|website=LatestLY|access-date=21 December 2019}}

List of stations

Following is a list of stations on this route-

class="wikitable sortable"
style="text-align:center; background:#{{rail color|Nagpur Metro|Orange}};" colspan="8" | Orange Line
rowspan="2" |#

! colspan="2" |Station Name

! rowspan="2" |Opened

! rowspan="2" |Chainage (in metre)

! rowspan="2" |Distance from previous station

! rowspan="2" |Connections

! rowspan="2" |Layout

English

!Marathi

1

|{{stl|Nagpur Metro|Automotive Square}}

|ऑटोमोटिव्ह चौक

|11 December 2022{{Cite news |title=PM Modi Inaugurates Nagpur Metro, Flags Off 6th Vande Bharat Train |url=https://www.ndtv.com/india-news/pm-modi-inaugurates-nagpur-metro-flags-off-6th-vande-bharat-train-3596721 |work=NDTV |agency=ANI |date=11 December 2022 |access-date=11 December 2022}}

|0.0

|0.0

|None

|Elevated

2

|{{stl|Nagpur Metro|Nari Road}}

|नारी रोड

|11 December 2022

|975.8

|975.8

|None

|Elevated

3

|{{stl|Nagpur Metro|Indora Square}}

|इंदोरा चौक

|11 December 2022

|2139.7

|1163.9

|None

|Elevated

4

|{{stl|Nagpur Metro|Kadvi Chowk}}

|कडबी चौक

|11 December 2022

|3181.2

|1041.5

|None

|Elevated

5

|{{stl|Nagpur Metro|Gaddi Godam Square}}

|गड्डीगोदाम चौक

|11 December 2022

|4399.0

|1217.8

|None

|Elevated

6

|{{stl|Nagpur Metro|Kasturchand Park}}

|कस्तुरचंद पार्क

|21 August 2021{{Cite web|date=21 August 2021|title=Nagpur Metro extension: Stretch between Sitabuldi, Kasturchand Park inaugurated|url=https://indianexpress.com/article/cities/pune/nagpur-metro-extension-stretch-between-sitabuldi-kasturchand-park-inaugurated-7463317/|access-date=25 November 2021|website=The Indian Express}}

|5148.6

|749.6

|None

|Elevated

7

|{{stl|Nagpur Metro|Zero Mile Freedom Park}}

|झिरो माइल फ्रीडम पार्क

|21 August 2021

|6175.5

|1026.9

|None

|Elevated

8

|{{stl|Nagpur Metro|Sitabuldi}}

|सिताबर्डी

|8 March 2019{{Cite news|date=7 March 2019|title=Nagpur Metro Flagged Off by PM Modi, to Open For Public on Women's Day|url=https://www.news18.com/news/india/nagpur-metro-flagged-off-by-pm-modi-to-open-for-public-on-womens-day-2059661.html|access-date=25 November 2021|work=News18}}{{Cite web|date=9 May 2019|title=Two months pass but no new Metro station opens|url=https://timesofindia.indiatimes.com/city/nagpur/two-months-pass-but-no-new-metro-station-opens/articleshow/69241835.cms|access-date=25 November 2021|work=The Times of India}}

|6709.2

|533.7

|{{rcb|Nagpur Metro|aqua|route}}

|Elevated

9

|{{stl|Nagpur Metro|Congress Nagar}}

|काँग्रेस नगर

|6 April 2021{{Cite news | date=6 April 2021 |title=4 new Metro stations operational from today |url=https://timesofindia.indiatimes.com/city/nagpur/4-new-metro-stations-operational-from-today/articleshow/81920428.cms |access-date=25 November 2021 |work=The Times of India}}

|7897.2

|1188.0

|None

|Elevated

10

|{{stl|Nagpur Metro|Rahate Colony}}

|रहाटे कॉलनी

|22 October 2020{{Cite news|date=10 October 2020|title=CMRS gives safety node to launch metro services on four new stations in Nagpur|url=https://urbantransportnews.com/news/cmrs-gives-safety-node-to-launch-metro-services-on-four-new-stations-in-nagpur|access-date=25 November 2021|website=Urban Transport News}}{{Cite web|date=16 November 2020|title=Nagpur Metro's Double Decker Viaduct Inaugurated|url=https://themetrorailguy.com/2020/11/16/nagpur-metros-double-decker-viaduct-inaugurated/|access-date=26 November 2021|website=The Metro Rail Guy}}

|8682.6

|785.4

|None

|Elevated

11

|{{stl|Nagpur Metro|Ajni Square}}

|अजनी चौक

|22 October 2020

|10104.7

|1422.1

|None

|Elevated

12

|{{stl|Nagpur Metro|Chhatrapati Square}}

|छत्रपती चौक

|6 April 2021

|11146.3

|1041.6

|None

|Elevated

13

|{{stl|Nagpur Metro|Jaiprakash Nagar}}

|जयप्रकाश नगर

|20 November 2019{{Cite web|title=Metro's Jaiprakash Nagar Station commissioned|url=https://www.thehitavada.com/Encyc/2019/11/21/Metro-s-Jaiprakash-Nagar-Station-commissioned.html|access-date=25 November 2021|website=Hitvada}}

|11811.5

|665.2

|None

|Elevated

14

|{{stl|Nagpur Metro|Ujjwal Nagar}}

|उज्ज्वल नगर

|6 April 2021

|12846.6

|1035.1

|None

|Elevated

15

|{{stl|Nagpur Metro|Airport}}

|एअरपोर्ट

|8 March 2019

|13784.9

|938.3

|None

|Elevated

16

|{{stl|Nagpur Metro|Airport South}}

|एअरपोर्ट साउथ

|8 March 2019

| -

| -

|None

|At-Grade

17

|{{stl|Nagpur Metro|New Airport}}

|न्यू एअरपोर्ट

|8 March 2019

|16184.4

|2399.5

|None

|At-Grade

18

||{{stl|Nagpur Metro|Khapri}}

|खापरी

|8 March 2019

|18460.6

|2276.2

|None

|At-Grade

See also

References