Ragigudda metro station
{{Short description|Upcoming Namma Metro station under Yellow Line}}
{{Use dmy dates|date=December 2024}}
{{Use Indian English|date=December 2024}}
{{Infobox station
| name = Ragigudda
| type = {{Namma Metro Infobox station line|line=Yellow}}
| style = Namma Metro
| image = Ragigudda metro station (Mar '25).jpg
| image_size =
| image_caption = Front Entrance of this metro station as of March 2025
| address = Marenahalli Road, 9th Block, Jayanagar, Bengaluru, Karnataka 560041
| coordinates = {{coord|12.9170|77.5884|display=inline,title}}
| line = {{rcb|Namma Metro|Yellow|croute}}
| other =
| structure = Elevated, Double track
| platform = Side platform
Platform-1 → {{stl|Namma Metro|Rashtreeya Vidyalaya Road}}
Platform-2 → Delta Electronics - Bommasandra
| depth =
| levels = (TBC)
| tracks = 2
| parking = (TBC)
| bicycle =
| baggage_check =
| opening = {{start date and age|July 2025|df=y}} (TBC)
| closed =
| rebuilt =
| electrified = 750 V DC third rail
| accessible = (TBC)
| status = Awaiting trainsets and ready for operations
| code = (TBC)
| owned = Bangalore Metro Rail Corporation Ltd (BMRCL)
| operator = Namma Metro
| architect = HCC - URC Construction JV
| architectural_style =
| wifi =
| zone =
| smartcardname =
| smartcardstatus =
| former =
| passengers =
| pass_year =
| pass_rank =
| pass_percent =
| pass_system =
| mpassengers =
| services = {{Adjacent stations|system=Namma Metro|line=Yellow|left=Rashtreeya Vidyalaya Road|to-left=Rashtreeya Vidyalaya Road|note-mid=(Operational around July 2025)|right=Jayadeva Hospital|to-right=Bommasandra}}
| route_map = {{BMR Yellow Line}}
| map_state = collapsed
| mapframe = yes
| mapframe-marker = rail
| mapframe-marker-color = #{{rail color|Namma Metro|Yellow}}
| mapframe-zoom = 14
}}
Ragigudda is an upcoming elevated metro station on the north–south corridor of the Yellow Line of Namma Metro in Bengaluru, India. Located in between Jayanagar 9th Block & J.P. Nagar 2nd & 3rd Phase, this metro station is named after the Ragigudda Anjaneya Temple.
As per latest reports, the Yellow Line is slated to be operational around July 2025{{Cite web |date=2025-04-06 |title=Bengaluru Namma Metro Update: Yellow Line Operations To Start In June {{!}} Check Status, Key Stations |url=https://english.jagran.com/india/bengaluru-namma-metro-update-yellow-line-operations-to-start-in-june-check-status-key-stations-10228542 |access-date=2025-04-06 |website=English Jagran |language=en}}{{Cite web |date=2025-04-05 |title=Bengaluru Metro Yellow Line: Operations To Start By June? Check Current Status & Key Stations |url=https://www.timesnownews.com/bengaluru/bangalore-metro-yellow-line-operations-to-start-in-june-check-current-status-and-key-stations-article-151355237 |access-date=2025-04-06 |website=Times Now |language=en}}{{Cite web |last=Parangi |first=Shankrappa |date=2025-04-06 |title=Namma Metro Yellow line: ಏಪ್ರಿಲ್ ಅಂತ್ಯಕ್ಕೆ 3ನೇ ರೈಲು, ಹಳದಿ ಮಾರ್ಗ ಕಾರ್ಯಾಚರಣೆ ಅಪ್ಡೇಟ್ |url=https://kannada.oneindia.com/news/bengaluru/bengaluru-namma-metro-yellow-line-to-be-open-by-june-july-2025-407879.html |access-date=2025-04-06 |website=kannada.oneindia.com |language=kn}} instead of May 2025{{Cite web |date=2025-03-11 |title=Bengaluru Metro Yellow Line To Become Operational By May 2025, Pink Line To Be Ready For Public Use By... |url=https://www.timesnownews.com/bengaluru/bangalore-metro-news-namma-metro-yello-line-and-pink-line-to-open-by-this-month-see-namma-metro-line-opening-news-article-118870216 |access-date=2025-03-12 |website=Times Now |language=en}}{{Cite web |date=2025-03-10 |title=Bengaluru: Namma Metro Yellow Line From RV Road To Bommasandra, Connecting Electronics City, Set To Open By May 2025 |url=https://english.jagran.com/india/bengaluru-namma-metro-yellow-line-rv-road-to-bommasandra-connecting-electronics-city-set-to-open-by-may-2025-10222975 |access-date=2025-03-12 |website=English Jagran |language=en}}{{Cite web |title=Bengaluru Metro plans to open yellow line in April with 4 trains, 30-min headway |url=https://www.deccanherald.com/india/karnataka/bengaluru/bengaluru-metro-plans-to-open-yellow-line-in-april-with-4-trains-30-min-headway-3343856 |access-date=2025-01-07 |website=Deccan Herald |language=en}} which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.
History
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Ragigudda metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.{{Cite web |date=2017-05-16 |title=HCC-URC JV Lowest Bidder for Bangalore Metro's RV Rd - HSR Layout |url=https://themetrorailguy.com/2017/05/16/hcc-urc-jv-lowest-bidder-for-bangalore-metros-rv-rd-hsr-layout/ |access-date=2024-10-23 |website=The Metro Rail Guy |language=en-US}} Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
Station layout
Station Layout (TBC)
{{stack|{{Routemap
| title = Ragigudda track layout (TBC)
| title color = black
| title-bg = #{{rail color|Namma Metro|Yellow}}
| legend = track
| collapsible = no
| map = vCONTgfa
cPLT\vSTR\cPLT ~~ ~~ ~~ to {{stl|Namma Metro|Rashtreeya Vidyalaya Road}} {{rcb|Namma Metro|Green|croute}}
- P1\cPLT\vSTR\cPLT\*P2
cPLT\vSTR\cPLT ~~ ~~ ~~ to {{stl|Namma Metro|Jayadeva Hospital}} {{rcb|Namma Metro|Pink|croute}} **
vCONTgfe
| bottom =
** Under Construction
}}}}
table border=0 cellspacing=0 cellpadding=3
|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=30 valign=top|G |style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=85 valign=top|Street level |style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/Entrance |
valign=top|L1
|valign=top|Mezzanine |valign=top|Fare control, station agent, Metro Card vending machines, crossover |
style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=30 rowspan=4 valign=top|L2
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|Side platform | Doors will open on the left {{access icon}} |
style="border-bottom:solid 1px gray;" width=85|Platform 2 Southbound |style="border-bottom:solid 1px gray;" width=500|Towards → Delta Electronics - Bommasandra |
Platform 1 Northbound |Towards ← {{stl|Namma Metro|Rashtreeya Vidyalaya Road}} |
style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2 align=center|Side platform | Doors will open on the left {{access icon}} |
style="border-bottom:solid 1px gray;" width=30 rowspan=2 valign=top|L2
|style="border-bottom:solid 1px gray;" width=85| |style="border-bottom:solid 1px gray;" width=500| |
Entry/Exits
{{Empty section|date=August 2023}}
See also
- Bengaluru
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
{{Clear}}
{{Portal bar|Bengaluru|Transport|Engineering}}
References
{{reflist}}
External links
{{Commons|Namma Metro}}
{{Wikivoyage|Bengaluru}}
- [https://english.bmrc.co.in Bangalore Metro Rail Corporation Ltd. (Official site)]
- [http://www.urbanrail.net UrbanRail.Net] – descriptions of all metro systems in the world, each with a schematic map showing all stations.
{{Namma Metro|yellow line=yes}}