Rail to Rail
{{Short description|Under construction rail trail in Los Angeles County, California}}
{{Use mdy dates|date=May 2025}}
{{Use American English|date=May 2025}}
{{Infobox cycling path
| name = {{LACMTA link logo}} Rail to Rail Active
Transportation Corridor Project
| embed =
| cellstyle =
| photo = File:Rail to rail route Slauson McKinley.jpg
| photo_size = 220px
| photo_alt =
| caption = Rail to Rail path under construction at the intersection of Slauson and McKinley Avenues, old train tracks are visible in the street
| title =
| established = May 17, 2025
| completed =
| length_mi = 5.5
| location = Los Angeles County, California, United States
| designation =
| trailheads = Fairview Heights station
Santa Fe and Slauson Avenues
| use = Commute, recreation
| elev_gain_and_loss =
| elev_change =
| highest =
| lowest =
| grade =
| difficulty =
| season =
| months =
| waymark =
| sights =
| hazards =
| surface = Concrete, asphalt
| ROW = Harbor Subdivision
| certification =
| website =
| map = {{maplink-road|from=Rail to Rail.map}}
| map_name =
| map_caption =
Segment A highlighted in green, B highlighted in purple
| map_size =
| map_alt =
| route =
| route_state =
}}
The Rail to Rail Active Transportation Corridor Project is a construction project building a rail trail in Los Angeles County, California, United States. It is being constructed by the Los Angeles County Metropolitan Transportation Authority (Metro).
The {{convert|5.5|mile|adj=on}} route, known as Segment A, runs through the city of Inglewood, the city of Los Angeles neighborhoods of Hyde Park, Chesterfield Square, Harvard Park, Vermont-Slauson, South Park and Central-Alameda, and unincorporated Florence-Graham. The route begins at the K Line's Fairview Heights station, connecting it with the J Line's Slauson station and the A Line's Slauson station before terminating at the intersection of Santa Fe and Slauson Avenues.{{Cite web |date=July 7, 2022 |title=L.A. Metro holds groundbreaking for Rail to Rail path for walkers, cyclists, rollers in Inglewood and South Los Angeles |url=https://www.masstransitmag.com/alt-mobility/press-release/21273458/los-angeles-county-metropolitan-transportation-authority-metro-la-metro-holds-groundbreaking-for-rail-to-rail-path-for-walkers-cyclists-rollers-in-inglewood-and-south-los-angeles |access-date=2022-08-01 |website=Mass Transit (magazine) |archive-date=2022-07-09 |archive-url=https://web.archive.org/web/20220709154619/https://www.masstransitmag.com/alt-mobility/press-release/21273458/los-angeles-county-metropolitan-transportation-authority-metro-la-metro-holds-groundbreaking-for-rail-to-rail-path-for-walkers-cyclists-rollers-in-inglewood-and-south-los-angeles |url-status=live }}{{Cite web |last=City News Service |date=July 5, 2022 |title=Construction to Begin on Biking and Walking Path Through South LA |url=https://www.nbclosangeles.com/news/local/construction-to-begin-on-biking-and-walking-path-through-south-la/2931098/ |access-date=2022-08-01 |website=NBC Los Angeles |language=en-US |archive-date=2022-08-01 |archive-url=https://web.archive.org/web/20220801003212/https://www.nbclosangeles.com/news/local/construction-to-begin-on-biking-and-walking-path-through-south-la/2931098/ |url-status=live }} The path uses the Harbor Subdivision freight train right of way along Slauson Avenue and Hyde Park Boulevard. The "active transportation corridor" is a {{convert|30|foot|adj=on}}-wide linear park.{{Cite web |last=Linton |first=Joe |date=January 29, 2022 |title=Metro Approves Rail-to-Rail Walk/Bike Facility, Groundbreaking Expected Next Month |url=https://la.streetsblog.org/2022/01/28/metro-approves-rail-to-rail-walk-bike-facility-groundbreaking-expected-next-month/ |access-date=2022-08-01 |website=Streetsblog Los Angeles |language=en-US |archive-date=2022-08-01 |archive-url=https://web.archive.org/web/20220801002313/https://la.streetsblog.org/2022/01/28/metro-approves-rail-to-rail-walk-bike-facility-groundbreaking-expected-next-month/ |url-status=live }} Construction on the path broke ground on July 6, 2022.{{Cite web |last=Fonseca |first=Ron |date=July 6, 2022 |title=LA Metro Breaks Ground On Bike And Pedestrian Path Through South LA |url=https://laist.com/news/transportation/la-metro-bike-and-pedestrian-path-south-la-groundbreaking |access-date=2022-08-01 |website=LAist |language=en |archive-date=2022-08-01 |archive-url=https://web.archive.org/web/20220801003447/https://laist.com/news/transportation/la-metro-bike-and-pedestrian-path-south-la-groundbreaking |url-status=live }} The path opened on May 17, 2025, following a dedication ceremony and community fair hosted by Metro that morning, costing $166 million.{{cite news |title=LA Metro Opens Rail to Rail Active Transportation Corridor, Connects Communities in Inglewood, South Los Angeles |url=https://www.vannuysnewspress.com/la-metro-opens-rail-to-rail-active-transportation-corridor-connects-communities-in-inglewood-south-los-angeles/ |access-date=May 17, 2025 |work=Van Nuys News Press |date=May 17, 2025}}
A potential future extension project, the Rail to River Active Transportation Corridor Project, known as Segment B, would run through some combination of Gateway Cities Huntington Park, Vernon, Maywood and Bell to reach the Los Angeles River bike trails.
Route description
Segment A begins at the K Line's Fairview Heights station on the border of Inglewood and the city of Los Angeles. It then briefly heads north along West Boulevard before turning east along 67th Street. Running east, the path meets the Harbor Subdivision right of way and turn northeast to run along it to Slauson Avenue. At Slauson Avenue, the path curves to the northern side of Slauson Avenue and parallels it traveling east, intersecting with the J Line at its Slauson station in the median of the Harbor Freeway (I-110) and the A Line at its Slauson station, before terminating at the intersection of Santa Fe and Slauson Avenues on the border of Vernon and Huntington Park. Along the way, the path runs through the neighborhoods of Hyde Park, Chesterfield Square, Harvard Park, Vermont-Slauson, South Park and Central-Alameda, and unincorporated Florence-Graham.
Segment B will begin at the A Line's Slauson station and curve southeast to follow the La Habra Subdivision right-of-way in between Randolph Street and would run through some combination of Gateway Cities Huntington Park, Vernon, Maywood and Bell to reach the Los Angeles River bike trails.
See also
References
{{reflist}}
External links
{{Attached KML|display=title,inline}}
- [https://www.metro.net/projects/railtorivera/ Rail to Rail Active Transportation Corridor Project – Segment A]
- [https://www.metro.net/projects/r2rb/ Rail to River Active Transportation Corridor Project – Segment B]
{{Los Angeles County Metropolitan Transportation Authority}}
Category:Rail trails in California
Category:Bike paths in Los Angeles
Category:Los Angeles County Metropolitan Transportation Authority